2.3 MAINTENANCE CREW REQUIREMENTS
Table 4 lists the anticipated crew requirements for maintenance
operations. Removal of water and sediments
during major maintenance activities can be accomplished using either a pump and water truck or a vacuum
truck. All applicable safety (OH & S) and disposal regulations should be followed. A
general description of the
maintenance activities follows.
Table 4: ANTICIPATED CREW REQUIREMENTS
Inspection/Minor Major Maintenance: Major Maintenance:
Maintenance Sediment Removal Cartridge Replacement
Labourer 1 1
Skilled Worker 1 1 1
Vacuum/Water Truck Operator 1 0/1
Total 2* 2* 2/3*
Special Requirements Knowledge of Knowledge of Knowledge of
Proper Storm Filter Disposal Cartridge Removal and
Function Requirements Installation Procedures
*
May require OH & S trained person If/when vault entry occurs.
2.4 MAINTENANCE METHODS
2.4.1 Minor Maintenance/Inspection (Twice A Year)
Minor maintenance typically will involve the steps below, however if it
appears that a spill of some type has
occurred, the local hazard control agency and Stormwater360 should be notified immediately. In the case of a
spill, the worker should abort maintenance activities until the proper guidance has been obtained.
Steps for Minor Maintenance
1. Maintenance to be performed by a skilled worker familiar with StormFilter units.
2. If applicable, set up safety equipment to protect pedestrians from fall hazards
presented by open
doors. Also set up appropriate safety equipment for work near roadways.
3. Inspect the external condition ofthe unit and take notes concerning defects/problems.
4. Open the doors to the vault and allow the system to air out for 5-10 minutes.
5. Without entering the vault, inspect the inside of the u nit, including components.
6. Take notes about the external and internal condition. This includes inspecting pit penetrations,
walls,
lids, ladders & grates etc.
7. Give particular attention to recording the level of sediment build-up on the floor of the vault in the
forebay (or pre-treatment bay), and on top of the internal components. If flow is occurring, note the
level of water and estimate the flow rate per drainage pipe. Record all observations.
8. Remove large loose debris and trash using a pole with a grapple or net on the end.
@2011 Stormwater360
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092Related documentApplication case desk ↗
About this file
- File size
- 60.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.