Development Application part 7 of 10 Stormwater Management Report - MCU13/0092

of 119

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (60.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

2.4.3     Major Maintenance: Sediment Removal & Cartridge Replacement (&Emergency)


Major maintenance/filter cartridge replacement typically involves the steps below. However, if it appears that
a    spill of some type has occurred, the local hazard control agency and Stormwater360 should be notified
immediately. In the case of a spill, the worker should abort maintenance activities until the proper guidance
has been obtained.    Depending on the configuration of the particular system, a worker may be required to
enter the vault to perform some tasks. If vault entry is required, OH & S rules for general confined
                                                                                                     space entry
must be strictly adhered to. Filter cartridge replacement should occur during
                                                                                     dry weather and it may be
necessary to plug the filter inlet pipe if base flows exist. Standing water present in the vault should be
regarded as polluted and contained during this operation by temporarily capping the manifold connectors.


Steps For Cartridge Replacement Maintenance

1.        Depending on the particular unit, one or two utility workers and a hauling truck operator will deliver
          the replacement cartridges to the site.      Information concerning how to obtain the         replacement
          cartridges is available from Stormwater360.


2.        If applicable, set up safety equipment to protect pedestrians from fall hazards
                                                                                                 presented by open
          doors. Also, set up appropriate safety equipment for work near roadways.



3.        Inspect the external condition of the unit and take notes concerning defects/problems.


4.        Open the doors to the vault and allow the system to air out for 5-10 minutes.


5.        Without entering the vault, give the inside of the unit, including components, a general condition
          inspection.


6.        Make notes about the external and internal condition.



7.       Give particular attention to recording the level of sediment build-up on the floor of the vault, in the

         forebay,and on top ofthe internal components.


8.       Remove large loose debris and trash using a pole with a grapple or net on the end.



9.       Ensuring safe working procedures are met, off load the replacement cartridges (16-39kgs each) and set
         aside.



10.      Remove the top cap (threaded), upper seal and float from the cartridge. Repeat procedure for
                                                                                                                every
         cartridge within StormFilter vault. Place items in a large plastic container to be lifted form the vault.
         Note: * Confined space entry may be required on StormFilter systems. In this case, please ensure that

         appropriate Confined Space entry training and subsequent certification has been undertaken and
         valid, and work procedures are strictly adhered to. If you are unsure, do not enter the vault and
         contact Stormwater360 immediately.



11.      Using a cordless drill and 8mm hex head, remove the three screws located around the top perimeter
         of the cartridge hood. Place screws in the large plastic container and, once full or completed, remove
         plastic container form vault.



@2011 Stormwater360

Used in these records

About this file

File size
60.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 7 of 10 Stormwater Management Report - MCU13_0092.pdf · 60.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.