Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Development Application part 7 of 10 Stormwater Management Report - MCU13/0092

of 119

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (60.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

2.4.4   Related Maintenance Activities (Performed on an as-needed basis)


StormFilter units are often just one of many components in a more comprehensive stormwater drainage and
treatment system. The entire system may include catch basins, detention vaults, sedimentation vaults and

manholes, detention/retention ponds, swales, artificial wetlands, and other miscellaneous components.      In
order for maintenance of the Storm Filter to be successful, it is imperative that all other components be

properly maintained. The maintenance/repair of upstream facilities should be carried out prior to StormFilter
maintenance activities.  In addition to considering upstream facilities, it is also important to correct any

problems identified in the drainage area. Drainage area concerns may include: erosion problems, heavy oil
and grease loading, and discharges of inappropriate materials.




2.5     TYPICAL EQUIPMENT REQUIRED FOR MAINTENANCE ACTIVITIES



Typical equipment required for conducting maintenance is shown in Table 5. Some of the materials listed are
suggestions rather than requirements.    It should be noted that there is more than one way to accomplish
some tasks.   Owners with available labour and equipment resources may desire to use alternative methods.

However, it is advisable that guidance from Stormwater360 be obtained prior to using alternative techniques.




@2011 Stormwater360

Used in these records

About this file

File size
60.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 7 of 10 Stormwater Management Report - MCU13_0092.pdf · 60.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.