Council archive · source document
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092
Very large file (60.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Sample Storm Filter Major Maintenance Inspection Data Sheet
It may be desirable to conduct this inspection during a storm to observe the relative flow through the filter cartridges. If the
submerged cartridges are severely plugged, large amounts of sediments should be present, very little flow will be discharging from
the drainage pipes, and it is likely that the cartridges need to be replaced during major maintenance.
Date: location:
System Size: TYPE: Cast-In-Place Precast linear
Personnel:
System Observations
Media Months in Service:
Oil and Grease in Forebay:
Sediment Depth in Forebay:
Sediment Depth on Vault Floor:
Structural Damage:
Estimated Flow from Drainage Pipes (if available):
Cartridges Submerged? (Yes _
No _)How Deep?
Drainage Area Report
Excessive Oil and Grease loading (Yes No _)Source:
_
Sediment Accumulation on Pavement (Yes No _)Source:
_
Erosion of landscaped Areas (Yes No _)Source:
_
Comments:
Review the condition reports from the previous minor and major maintenance visits.
@2011 Stormwater360
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092Related documentApplication case desk ↗
About this file
- File size
- 60.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.