Council archive · source document
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092
Very large file (60.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Stormwater360
AUSTRALIA
Client:
Contact: Phone:
Engineer:
Contact: Phone:
Address of Device:
Items: SFEP Treatment Train
I~ I
Frequency of Inspections and Maintenance:
Inspections (time/year) Major Maintenance
EnviroPods 2 (and after major storm) 3-4 months
StormFilters 1 (after 25mm rain event) 12 months
Maintenance Estimate Annual Cost:
StormFi/ters:
I .
Enviropods:
@2011 Stormwater360
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 7 of 10 Stormwater Management Report - MCU13/0092Related documentApplication case desk ↗
About this file
- File size
- 60.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.