SPA Decision Notice - 010.2010.00000811.001 [As Published] · 132010.811

of 16

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

  2010/811




Page 13 of 16


[OCR of page images]
2010/3811

 

 

 

Notice———.
Concurrence Agency Response

CONDITIONS

The following concurrence agency conditions are to be attached to any approval:

41 Prior to the commencement of any development-related excavation, earthworks or soil disturbance,
that part of the site to be so worked is to be subjected to investigation and, where necessary,
appropriate remedial action. ©

2 Any person employed to work on any part of the site where Condition 1 has not been satisfied is to
be forewarned in writing by the applicant :

This warning-is to explain that information available to DERM indicates a potentiat for residual UXO
-exists on the site‘and work should preceed-with-due caution; ‘It is-to.state-the-precedure-te be -
followed by any person finding an object suspected of being explosive ordnance or component
thereof:

Do not disturb the object.

Take action, where appropriate, to preventit being disturbed by another person.
Note its approximate dimensions and general appearance.

Note the route to its location.

Advise the Police as soon as possible.

cooee

3 Following investigation and any remedial action taken to-satisfy Condition 1 above, the applicant is to
submit a report, prepared in accordance with current guidelines, to DERM for assessment. DERM is
to subsequently advise the Sunshine Coast Regional Council and the applicant of its assessment in
regard to Condition 1 being satisfied.

4 Prior to Condition 3 being satisfied, no excavated gravel, rock, sand or soil is to be removed from the
site without written DERM approval.

5 The applicant is to advise the owner and any occupier of the site of the above responsibilities.

General comments or advice about applications concerning land potentially affected by UXO

fate may. contact DERM's Project Manager (UXO) or visit Defence's website

http://www.defence.gov.au/uxo/ for the details of current UXO investigation and remedial search contractors.
DERM accepts reports based on investigative and remedial work carried out by these contractors.
Investigation and remedial action to satisfy Condition 1 typically involves sampling/search programs with
detection equipment unless the use of such equipment is:

¢ considered unwarranted by a UXO contractor due to the extent of any prior excavation or
earthworks or, conversely, of any filling proposed as part of the development program; or

* prevented or made impracticable by the presence of a structure, stockpile, natural barrier or metal
waste.

In the latter case, alternative action may be appropriate to minimise the risk in the first instance. For

example, where the risk of exposure to any UXO that may exist is reduced by the presence of a structure or

natural barrier, issuance of the standard UXO warning (see Condition 2) may suffice while the structure,
-sStockpile or barrier.remains in:place.-.Where.a:structure is.to:be removed or reduced as part of the
scdevelopment program, protective'precautions, commensurate with any greater risk to which workers might

 

Page 3 of 4 + 091217 . Department of Environment and Resource Management

Page 13 of 16

Used in these records

About this file

File size
293 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SPA Decision Notice - 010.2010.00000811.001 [As Published].pdf · 293 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.