Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Appendix D- Stormwater Management Plan · MCU23/0078

of 74

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (18.3 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 18, section 1. The text section number identifies this passage in the reader.

                              Table 20: Selected Stormwater Quality Treatment Devices
      Treatment Device         Discussion
       Gross Pollutant
            Traps              A gross pollutant trap is a treatment device designed to capture coarse sediment,
                               trash and vegetation matter in stormwater runoff – discussed for each supplier
                               option below.


                               Site A Catchment:
                                    •   SPEL – 8 (Eight) Stormsacks: or
                                    •   Ocean Protect – 8 (Eight) Ocean Guards.


                                Site B - Northern Catchment:
                                    •   SPEL – 2 (Two) Stormsacks: or
                                    •   Ocean Protect – 2 (Two) Ocean Guards.


                               Site C - Southern Catchment:
                                    •   SPEL – 4 (Four) Stormsacks: or
                                    •   Ocean Protect – 4 (Four) Ocean Guards.


                               Proposed number of gross pollutant traps for development sites will be installed in
                               all major field inlets and gully pits within the development site parking and vehicle
                               areas.


         Proprietary
      Treatment Device         Proprietary filtration devices are designed to remove nutrients and sediments
                               from stormwater runoff – discussed for each supplier option below.


                               Site A Catchment:
                                    •   SPEL – 50 (Fifty) SPELFilters: or
                                    •   Ocean Protect – 85 (Eighty-Five) Stormfilters.


                                Site B - Northern Catchment:
                                    •   SPEL – 2 (Two) SPELFilters: or
                                    •   Ocean Protect – 5 (Five) Stormfilters.


                               Site B - Southern Catchment:
                                    •   SPEL – 2 (Two) SPELFilters: or
                                    •   Ocean Protect – 6 (Six) Stormfilters.


                               All runoff from the site will pass through the cartridge filters located within the
                               proposed stormwater detention tanks across the development site.



Refer to the MUSIC information attached in Appendix F for further details.




                                            www.bornhorstward.com.au                                                 Page 14

Used in these records

About this file

File size
18.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix D- Stormwater Management Plan.PDF · 18.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.