Appendix D- Stormwater Management Plan · MCU23/0078

of 74

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (18.3 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 4, section 1. The text section number identifies this passage in the reader.

LIST OF FIGURES
Figure 1: Site Locality Plan ................................................................................................................................................................................................................... 2
Figure 2: Noosa Shire Council Interactive Flood Map ............................................................................................................................................................. 4
Figure 3: Proposed Treatment Train (Site A) – SPEL .............................................................................................................................................................. 15
Figure 4: Proposed Treatment Train Site B (Northern & Southern Catchment) – SPEL ......................................................................................... 15
Figure 5: Proposed Treatment Train (Site A) – OceanProtect ............................................................................................................................................ 16
Figure 6: Proposed Treatment Train (Site B) – OceanProtect ............................................................................................................................................ 16


LIST OF TABLES
Table 1: XP Storm Existing Model Parameters ............................................................................................................................................................................ 6
Table 2: XP Storm Existing Peak Flow Results – Site A (m3/sec) .......................................................................................................................................... 6
Table 3: XP Storm Existing Peak Flow Results – Site B (South) (m3/sec) ......................................................................................................................... 7
Table 4: XP Storm Existing Peak Flow Results – Site B (South) (m3/sec) ......................................................................................................................... 7
Table 5: Comparison of Rational Method & XP Storm Existing Peak Flows – Site A (m3/sec)............................................................................... 8
Table 6: XP Storm Developed Model Parameters – Site A..................................................................................................................................................... 8
Table 7: XP Storm Developed Model Parameters – Site B (North) ..................................................................................................................................... 8
Table 8: XP Storm Developed Model Parameters – Site B (South) ..................................................................................................................................... 8
Table 9: XP Storm Developed Model Hydraulic Routing ........................................................................................................................................................ 9
Table 10: XP Storm Developed Mitigated Peak Flow Results – Site A (m3/sec) ........................................................................................................ 10
Table 11: XP Storm Developed Mitigated Peak Flow Results – Site B (North) (m3/sec) ........................................................................................ 10
Table 12: XP Storm Developed Mitigated Peak Flow Results – Site B (North) (m3/sec) ........................................................................................ 10
Table 13: XP Storm Existing and Developed Mitigated Peak Discharge Comparison – Site A (m3/sec)......................................................... 11
Table 14: XP Storm Existing and Developed Mitigated Peak Discharge Comparison – Site B (North) (m3/sec)......................................... 11
Table 15: XP Storm Existing and Developed Mitigated Peak Discharge Comparison – Site B (South) (m3/sec)......................................... 11
Table 16: Noosa Shire Council Water Quality Objectives .................................................................................................................................................... 12
Table 17: Source Node Information – Site A Catchment ..................................................................................................................................................... 13
Table 18: Source Node Information – Site B Northern Catchment ................................................................................................................................. 13
Table 19: Source Node Information – Site B Southern Catchment ................................................................................................................................. 13
Table 20: Selected Stormwater Quality Treatment Devices................................................................................................................................................ 14
Table 21: Pollutant Removal Rates Discharge (Site A) – SPEL ........................................................................................................................................... 15
Table 22: Pollutant Removal Rates Discharge (Site B) – SPEL............................................................................................................................................ 16
Table 23: Pollutant Removal Rates Discharge (Site A) – OceanProtect ......................................................................................................................... 17
Table 24: Pollutant Removal Rates Discharge (Site B) – OceanProtect ......................................................................................................................... 17


APPENDICES
Appendix A                                        DEVELOPMENT DRAWINGS
Appendix B                                        ENGINEERING DRAWINGS
Appendix C                                        EXISTING STORMWATER AND CONTOUR INFORMATION
Appendix D                                        RATIONAL METHOD CALCULATIONS
Appendix E                                        XPSTORM OUTPUTS
Appendix F                                        MUSIC DATA
Appendix G                                        COUNCIL CODES




                                                                                               www.bornhorstward.com.au

Used in these records

About this file

File size
18.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix D- Stormwater Management Plan.PDF · 18.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.