Council archive · source document
Appendix D- Stormwater Management Plan · MCU23/0078
Plans and drawings: the text below has words only, no drawings.
Very large file (18.3 MB): may take a few minutes to open.
Original PDF page 48, section 1. The text section number identifies this passage in the reader.
Figure 16: Developed Mitigated – Detention Basin Graph (RL) Figure 17: Detention Basin Discharge via 2 x Pipe Orifices (m3/s) Figure 18: Detention Basin Overflow Weir Discharge (m3/s)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D- Stormwater Management Plan.PDFRelated documentApplication case desk ↗
About this file
- File size
- 18.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.