Rev. Date Description Iss. Appr.
A 26.02.2021 PRELIMINARY MASTERPLAN MM DM
8.000 B
C
02.03.2021 PRELIMINARY MASTERPLAN
03.12.2021 MASTERPLAN UPDATE
MM
MM
DM
GS
NOMINAL D
E
09.12.2021 MASTERPLAN UPDATE
10.12.2021 MASTERPLAN UPDATE
MM
MM
GS
GS
F 21.01.2021 MASTERPLAN UPDATE MM GS
1 G
H
10.03.2022 MASTERPLAN UPDATE
02.06.2022 MASTERPLAN UPDATE
PE
AB
GS
GS
I 06.07.2022 MASTERPLAN UPDATE PE GS
RAMP 2 J
K
01.03.2023 CONSULTANT STARTUP REVIEW
10.03.2023 CONSULTANT COORDINATION
MM
MM
GS
GS
L 17.03.2023 CONSULTANT COORDINATION MM GS
M 24.03.2023 CONSULTANT COORDINATION MM GS
N 31.03.2023 CONSULTANT COORDINATION MM GS
8.750 3 O 07.04.2023 CONSULTANT COORDINATION MM TC
4
5
SUGGESTED SUBSTATION
AND SWITCHROOM
PLANT 6
7
Site B
8 Northern
Do not scale this drawing. Verify all dimensions on site before commencing
any work. Copyright © 2023 Buchan. This drawing remains the property of
265m2
Roof Area
The Buchan Group Australia Pty Ltd. Reproduction in whole or in part without
AMENITIES prior consent is forbidden.
= 0.058
505m2 ha
9 File
\ACCDocs\Buchan\719021-R22-Noosa_Civic_Precinct\
NOOSA CIVIC
EXISTING CENTRE Site A Roof 1 Site B
10 Northern
Area AREA SCHEDULE (GFA)
Road Area
= 0.378 ha
313m2 220m2 151m2 98m2 149m2 151m2 133m2 153m2 151m2 151m2 511m2
= 0.191 ha RETAIL (ground floor) 14,150m
2
EASEMENT AM
11 COMMERCIAL
to be revised to 13,700m2
(first floor) 2,540m2
9.000 to be revised to 2,500m2
PEDESTRIAN BRIDGE RESIDENTIAL (ground floor) 1,085m2
CONNECTION OVER 3,050m2
12
(first floor)
(second floor) 4,140m2
CAR PARKING SCHEDULE
13 97m2
LOT 3 GROUND LEVEL NORTH 81
inclusive of STANDARD TBD
PWD TBD
14 97m2 BASEMENT to be revised to 709 780
Site A Total inclusive of STANDARD TBD
Road Area
PWD TBD
91m2 87m2 92m2 92m2 93m2 82m2
146m2 92m2 92m2 65m2 136m2
= 1.586 ha 15 97m2 GROUND LEVEL 108
LOT 7
inclusive of STANDARD TBD
PW D TBD
121m2
97m2 STREET GROUND LEVEL 32
16 inclusive of STANDARD TBD
Site B PW D TBD
9.000
162m2 125m2 138m2 138m2 140m2
161m2 138m2 138m2 145m2 68m2 75m2 97m2 Southern TOTAL ALL LEVELS to be revised to 930 1001
17 Road Area inclusive of STANDARD TBD
= 0.259 ha
PWD TBD
308m2 INFORMATION
15m2 15m2 Site A Roof 2 15m2 15m2
DESK
18
Area
8.250 = 1.809 ha 19
20 Site B
284m2 140m2 181m2 181m2 404m2 99m2 62m2
Southern
Roof Area
21 = 0.191 ha
7.500 22
1580m2 927m2
END OF TRIP
FACILITIES
23
Project
3474m2
6.750 24 NOOSA CIVIC
VILLAGE
25 Eenie Creek Rd
Noosaville QLD 4566
6.000 26
Project Number
SUGGESTED SECONDARY
STORAGE
27 DISTRIBUTION ROOM 719021
844m2 Status
SUGGESTED FIRE
INFORMATION
Date Plotted 07/04/2023 4:19:17 PM
CONTROL ROOM
28
N
5.250 Date Issued 07.04.2023
SUGGESTED FIRE BRIGADE HYDRANT AND Scale 1 : 500 @A1
SPRINKLER BOOSTER CABINETS - OPTION 1 0 5 10 20 30M
29 Drawing Title
B+W TO REVIEW
BIO-DETENTION EXTENTS FLOOR PLAN
2.0m DEPTH ASSUMED
4.500 30
SUGGESTED FIRE TANK
KEEP CLEAR
ALTERNATE OPTION
Drawing Number Revision
A-SK-1000 O
A B C D E F G H I J K L M N O P Q R S T U
WORK IN PROGRESS Brisbane Studio
+ 61 7 3859 9222 / buchangroup.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D- Stormwater Management Plan.PDFRelated documentApplication case desk ↗
About this file
- File size
- 18.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.