9.4.2.2          Purpose and Overall Outcomes
(1)   The purpose of the Earthworks code is to ensure earthworks do not unreasonably impact on the natural environment or
      other properties and provide a safe and secure work environment.
(2)   The overall outcomes sought for the Earthworks code are:
      (a)   Earthworks are designed and constructed to be structurally sound.
      (b)   All onsite works provide land stability (including differential settlement or expansion in reactive soils).
      (c)   Earthworks avoid contamination of land.
      (d)   Flooding and drainage are appropriately addressed.
      (e)   Groundwater, watercourses and wetlands are protected.
      (f)   The loss of native remnant or regrowth vegetation is avoided.




Table 9.4.2.3 ­ Criteria for assessment

Effects of works         Table 9.4.2.3 Criteria for assessment (part)
Performance outcomes                                               Acceptable Outcomes
Assessable Development

Effects of works
Drainage
PO1                                                                AO1
Finished surface levels ensure land is free draining.              Filled or excavated areas have a minimum gradient of 0.5%
                                                                   and drain to Council’s stormwater infrastructure where
                                                                   available, or where stormwater infrastructure is not available,
                                                                   toward the street.
Hydraulics
PO2
Change to the levels on site do not have an adverse impact on No acceptable outcome provided
the flooding and drainage characteristics off­site.
Geotechnical considerations
PO3                                                                AO3.1
Earthworks do not result in geotechnical instability on­site or    Filling works are undertaken in accordance with Council’s
to nearby premises.                                                Planning Scheme Policy PSP6 Engineering design standards
                                                                   ­ roads, drainage and earthworks.

                                                                   AO3.2
                                                                   Where the filling is for residential, commercial or industrial
                                                                   purposes the works comply with Australian Standard ­
                                                                   Guidelines for earthworks on commercial & residential
                                                                   development.
Local amenity
PO4                                                                AO4.1
Undertaking earthworks does not adversely impact on the            The following control measures are implemented—
amenity of the local area by way of dust, noise or visual          (a)    regular water spraying of exposed areas to suppress
amenity.                                                                  dust;
                                                                   (b)    provision of dust stabilised or sealed internal roads;
                                                                   (c)    protective covering of exposed areas that are left for


                                             NOOSA PLAN 2020 ­ AMENDED AT 25 SEPTEMBER 2020                                Page 91 of 150

Used in these records

About this file

File size
18.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix D- Stormwater Management Plan.PDF · 18.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.