Skip to the record
Accept no substitutions.

Council archive · source document

Appendix D- Stormwater Management Plan · MCU23/0078

of 74

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (18.3 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 64, section 1. The text section number identifies this passage in the reader.

      (a)   Underground infrastructure is accessible for maintenance purposes.
      (b)   Existing services are identified and methods of protection and access are implemented in the design of the development.

Table 9.4.3.3 ­ Criteria for assessment

Setbacks, easements and maintenance                      Table 9.4.3.3 Criteria for assessment (part)
Performance outcomes                                               Acceptable Outcomes
Assessable development

PO1                                                                No acceptable outcome provided
Development near a stormwater drain, overland flow path or
associated structure does not—
(a)   adversely affect the function of the service;
(b)   place an additional load on the service; and
(c)   unduly increase future maintenance costs.


PO2                                                               AO2.1
Maintenance access is provided to all stormwater drains, overland For trunk infrastructure, a registered easement in favour of Council
flow paths and associated structures.                             is created over all underground infrastructure located in private
                                                                  property.

                                                                   AO2.2
                                                                   The width of the easement required is in accordance with
                                                                   Council’s Planning Scheme Policy PSP6 Engineering Design
                                                                   Standards – Roads, drainage and earthworks.

                                                                   AO2.3
                                                                   The easement is centred over the centreline of the infrastructure.




                                               NOOSA PLAN 2020 ­ AMENDED AT 25 SEPTEMBER 2020                               Page 94 of 150

Used in these records

About this file

File size
18.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix D- Stormwater Management Plan.PDF · 18.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.