Council archive · source document
Delegated Report - Code - Planning OPW20 0118 · OPW20/0118
Author Coordinator Engineering, Mark Lewis Development Assessment APPLICATION DETAILS Application No. OPW20/0118 Applicant David Hales & Louise Hales Proposal Operational Works - Prescribed Tidal Works (Removal of existing retaining wall, jetty and concrete boat ramp. Installation of new boundary wall and jetty) Properly Made Date 14 July 2020 Information Request Date 30 July 2020 Information Response Date 6 October 2020 Decision Due Date 23 November 2020 Report Completed Date 25 November 2020 PROPERTY DETAILS Property Address 35 Mossman Ct Noosa Heads Qld 4567 RP Description Lot 82 N 21847 Land Area 654.0000 m² Existing Use of Land Residential STATUTORY DETAILS SEQRP Designation Urban Footprint Zone Low Density Residential Precinct Not Applicable Local Plan Area Not Applicable Overlays Acid Sulfate Soils, Flood Hazard Assessment Type Code PROPOSAL The application seeks approval for Operational Works - Prescribed Tidal Works (Removal of existing retaining wall, jetty and concrete boat ramp. Installation of new boundary wall and jetty). The locality and proposal plan are included below. Figure 1 – Locality Figure 2 – Site Demolition Plan Figure 3 – Proposal Plan site details Background The application includes: the removal of the existing structures and some encroachments into waterway, the replacement of the revetment wall, and the construction of a new jetty. assessment Instruments for Statutory Assessment Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development: State Planning Policy; South East Queensland Regional Plan; Planning Regulation 2017; and Noosa Plan 2020. Noosa Plan 2006 The following codes from the Noosa Plan 2006 are applicable to this development: Watercourses Works Code; The application has been found to generally comply with all applicable statutory instruments. Noosa Plan 2020 The Noosa Plan 2020 came into effect on the 31st July 2020. The Noosa Plan 2020 requires a Material Change of Use – Landing approval to be obtained prior to the use of the proposed jetty. The advice of the need for the further permit has been included. cONSULTATION Referral Agencies The applicant was referred to the following Referral Agencies: Department of Infrastructure, Local Government and Planning (SARA) The Department has responded 5 August 2020 advising that the application had been approved and provided conditions Internal Council Referrals Not applicable conclusion & reasons for decision The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval. The report is provided in accordance with Section 63(5) of the Planning Act 2016. RECOMMENDATION With regard to Application No OPW20/0118 for Operational Works - Prescribed Tidal Works (Removal of existing retaining wall, jetty and concrete boat ramp. Installation of new boundary wall and jetty) situated at 35 Mossman Ct Noosa Heads Qld 4567 and described as Lot 82 N 21847, it is recommended the application be approved in accordance with the following details for the Decision Notice: application details Application No: OPW20/0118 Street address: 35 Mossman Ct Noosa Heads Qld 4567 Real property description: Lot 82 N 21847 Planning Scheme: The Noosa Plan (8 June 2018) Decision details Council decided to issue the following type of approval: Development Permit for / Preliminary Approval for Operational Works - Prescribed Tidal Works (Removal of existing retaining wall, jetty and concrete boat ramp. Installation of new boundary wall and jetty) CURRENCY PERIOD of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 30153-N Construction Notes prepared by SCG Consulting Engineers June 2020 30153-J1 A Site Demolition Plan prepared by SCG Consulting Engineers 16 September 2020 30153-J5 A Jetty and Site Plan prepared by SCG Consulting Engineers 16 September 2020 30153-J6 B Jetty Framing and Details Plan prepared by SCG Consulting Engineers 16 September 2020 30153-J7 Jetty Accessories and Framing Details prepared by SCG Consulting Engineers June 2020 Currency Period The Currency Period for this development approval lapses if all conditions have not been complied with, and the plan of survey lodged with Council for endorsement by 23 November 2022, unless an application to extend the currency period is approved by Council. Site Specific Conditions All elements of the existing revetment wall and the rock wall in the canal must be wholly removed as part of these works The Development Permit for Material Change of Use – Landing must be obtained prior to the use of the jetty commencing. General Conditions The jetty structure must be designed and constructed such that it is free standing within the waterway and are not connected to or behind the revetment wall All structures must have no detrimental effects on stormwater drains and/or easements. A rigid handrail must be fitted on one side of the walkway. No posts or vertical supports of the proposed jetty are to extend vertically from the structure unless they provide necessary support for the handrail. No boatlifting devices are to be attached or moored at the jetty structure for the purpose of elevating a vessel above the water without Council approval. There must be no electrical reticulation system carrying electricity in excess of 24 volts beyond the revetment wall unless all switches and power outlets are positioned above the 1%AEP flood level. Lighting associated with the use must be designed, installed, operated, and maintained in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting. The jetty is to be used for private purposes only with no commercial operations to be undertaken. Boat repair activities are not permitted on site. Wastewater and sullage must only be disposed of at approved pumpout facilities. The mooring facility must not be utilised for live-aboard purposes. Any construction and post construction activity is not to impact on the condition of the waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA (1994) and the Environmental Protection (Water) Policy 2009. Certification by a Registered Professional Engineer of Queensland that states that the jetty and revetment wall have constructed in accordance with best practice methods and are structurally sound must be submitted to Council. This certification must be submitted to Council within three (3) months of the completion of the works. A final inspection and approval of the structure by Council’s Inspector is also required. Please contact Council’s Development Assessment Branch on 5329 6500 to arrange the inspection. This approval lapses where the construction of the jetty has not commenced within two (2) years of the date of issue of the approval, unless application is made and approved by Council for an extension. After completion, the proposed works must be maintained in a sound state of repair in accordance with the approved plans referral agencies The referral agencies applicable to this application are: Referral Status Referral Agency and Address Referral Trigger Response Concurrence SARA at DILGP SARA at DILGP Via MyDAS2 at https://prod2.dev-assess.qld.gov.au/suite/ (for assistance, contact DILGP at 5352 9701 or email:[email protected] Planning Regulation 2017 Schedule 10, Part 17 – Tidal Works or Works in a Coastal Management District The agency provided its response on 5 August 2020 (Reference No. 2007-18005 SRA). A copy of the response is attached Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. The approval or conditions do not absolve the owner of the land from complying with all the conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant statues and/or statutory regulations in the execution and/or performance of said works. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Building and Construction Industry (Portable Long Service Leave) Levy The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act. property notes Not applicable. VARIATION approval details Not applicable. further development permits required Type of Development Permit Required Subject of the required Development Permit Development Permit for Material Change of Use Landing submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. [word/footer1.xml] Page 8 of 8 [word/header1.xml] 3 [word/header2.xml] DEVELOPMENT ASSESSMENT DELEGATED REPORT [Attachment: image1.jpeg (image text)] 57 sa7N2te4s 31 55 Bonz1847 116N21845 33 29 81n2i847 ‘ ToN21847 415 27 7eN21847 re a3n21847 4n21847 a 8snz1847 3 21847 [Attachment: image2.jpeg (image text)] enn Te ‘DRAWING SIE — AZ gE gi # ae bi ati Pano ei ci FOR APPROVAL Ta ieevew| oe TTT A & e im Led e ete aan é ‘ HT a il ie a By Begs i cal Mail SITE DEMOUTION PLAN i Bee ea a Snare teeth [Attachment: image3.jpeg (image text)] ‘DRAWING SZE — AZ Bagi Be ii i Z a a ga BE 2 fH uy Lot 83 f al, H Vlglesele (ie AVES | lull ills tla WEA HE ili af li lax! 255 as Fire tHe
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW20 0118Related documentApplication case desk ↗
About this file
- File size
- 298 KB (small file)
- File type
- DOCX
No other editions are linked here.