Part 9 of 37 Appendix 7 - Stormwater Management MCU12/0208
Very large file (52.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
’-’ .’L....
.
",...,;. (’ ’In’’’~r
D..-\......I _,~/II."\.,.,,,
~
;.-~’
l’-’
~
..../....’ I
Z 0 D C 20~1
lii~i iji~r
r
.J _.
,- ~,
JU
---
~,
I
"
,
J.c r~
....,. .
._,
-_. --
J Place barcode here
80602696
THIS IS THE NEXT PART OF A
"
MULTIPLE PART RECORD
Part _3_ Of "61
Application number: (V\C\)\2/020~
C:\Documents and Settings\eje\DesktoplMulti Part Record Cover Sheet NEXT PART
(3).doc
b ~.SJ.f?.1.. ..~.........I R:
I’f"-’t
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 57 pages
Page 2
Prepared for
Northbrook Corporation Pty Ltd
29 November 2012
Cardno@
Shaping the Future
[OCR of page images]
Noosa on Weyba
Stormwater Management Plan
5101/19-03
Prepared for
Northbrook Corporation Pty Ltd
29 November 2012
q>
Cardna
Shaping the Future
Page 3
Noosa on Weyba
Stormwater Management Plan
(..r.,CarcJno~
Cardno (Qld)Ply Ltd
ABN 57 051 074992
Level 11 Green Square North Tower
515 St Paul’s Terrace
Fortitude Valley Qld 4006
Locked Bag 4006 Fortitude Valley
Queensland 4006 Australia
Telephone: 07 3369 9822
Facsimile: 07 3369 9722
International: +61 733699822
[email protected]
www.cardno.com.au
Document Information
Prepared for Northbrook Corporation Pty Ltd
Project Name Noosa on Weyba
File Reference 0:\51 01-19-03\wp\R3v2 SMP\SMP_v2.docx
Job Reference 5101/19-03
Date 29 November 2012
Document Control
Version Date Author Author Reviewer Reviewer
Initials Initials
31 October 2012 Nadia Gulerres NG Michael Della MD
2 29 November 2012 Nadia Gulerres Michael Della
"@ 2012 Cardno All Rights Reserved. Copyright in the whole and every part of this document belongs to Cardno
and may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or form or in or on
any media to any person without the prior written consent of Card no."
Northbrook Corporation Pty LId Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page ii
Page 4
Noosa on Weyba
Stormwater Management Plan
<..J’) Cardno@
Table of Contents
1 Introduction 1
2 Site Description 2
3 Proposed Development 3
4 Integrated Water Cycle Management Plan 5
5 Water Quality Objectives 6
5.1 Stormwater Quality Objectives 6
5.2 Noosa River Environmental Values and Water Quality Objectives 7
6 Proposed WSUD Strategy 9
6.1 Summary 9
6.2 Treatment Device Details 10
6.2.1 Rainwater Tanks 10
6.2.2 Bio-retention Basins 10
6.2.3 Bio-retention Gardens 11
6.2.4 Bio-retention Swales 12
6.2.5 Litter Baskets 13
7 MUSIC Modelling 14
7.1 Summary 14
7.2 Catchment Areas 14
7.3 Treatment Devices 15
7.3.1 Rainwater Tanks 15
7.3.2 Bio-retention Basins and Bio-retention Gardens 16
7.3.3 Bio-retention Swales 17
7.3.4 Vegetated Swales 18
7.3.5 Litter Baskets 19
8 MUSIC Model Results 20
8.1 Load Reduction 20
8.2 Sensitivity Analysis 20
8.3 Frequent Flow Objective 21
8.4 Waterway Stability 22
9 Conclusion 23
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page iii
Page 5
Noosa on Weyba
Stormwater Management Plan
<..J’) Cardno@
Tables
Table 7-1 MUSIC Sub-catchments..........................................................................................................14
Table 7-2 Rainwater Tank Details ...........................................................................................................16
Table 7-3 Bio-retention Basin and Bio-retention Garden Details ..............................................................17
Table 7-4 Bio-retention Node Details.......................................................................................................18
Table 7-5 Swale Node Details.................................................................................................................18
Table 7-6 Vegetated Swale Details .........................................................................................................18
Table 8-1 Pollutant Load Reductions.......................................................................................................20
Table 8-2 Comparison to Existing Case ..................................................................................................20
Table 8-3 Sensitivity Analysis Results .....................................................................................................21
Figures
Figure 1 Site Location
Figure 2 Sub-catchments
Figure 3 Proposed Storm water Treatment -
Areas A to G
Figure 4 Proposed Stormwater Treatment -
Areas H and I
Figure 5 Proposed Stormwater Treatment -
Areas J to L
Appendices
Appendix A Concept Masterplan
Appendix B Water Quality Monitoring Of Lake Weyba
Appendix C Community Information Leaflet
Appendix D Underground Rainwater Tank Example
Appendix E MUSIC Model Layouts
Appendix F Maintenance Plan
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page iv
Page 6
Noosa on Weyba
Stormwater Management Plan
~,.., Cardno@
1 Introduction
The subject site, known as Noosa on Weyba, encompasses the following lots:
The Northbrook Pty Ltd land:
> Lot 1667 on M3772 44.4 ha
> Lot 11 on RP893393 40.7 ha
> Lot 12 on RP893393 0.61 ha
The J & K Hofmann land:
> Lot 7 on RP46782 1.99 ha
> Lot 2 on RP160983 93.1 ha
> Lot 2 on SP 179590 12.5 ha
> Lot 53 on SP163571 110.0ha
It is proposed to develop around 19 percent of this site for residential purposes, with 4 percent of the site
used parks and lake buffer zone and the remaining 77 percent of site dedicated as greenspace and
as
conservationareas. The developed areas are contained within Lot 11 and 12 on RP893392, Lot 2 on
SP179590 and Lot 53 on SP163571. The concept master plan for the development is shown in Appendix A.
The development will be conducted under a Community Title Scheme.
The site ultimately drains to Lake Weyba which is a declared Fish Habitat Area. A section of the site is also
located in the Water Resource Catchment Area as defined
by the Maroochy Plan 2000. Therefore the
treatment of stormwater to the best possible standard is of the upmost importance. A significant portion of
the site is currently used for rural purposes, in particular the grazing of cattle. Consequently the
development provides an opportunity to improve the quality of stormwater being discharged from the site if
appropriate measures are adopted.
To ensure that the impact of the development is minimised, the principles of water sensitive urban design
(WSUD) have been adopted. These principles (sourced from Urban Stormwater Planning Guidelines
Queensland Department of Environment and Heritage Protection (DEHP),2010) include:
> the protection of existing natural water features;
> the integration of public open space with stormwater drainage corridors to maximise public access and
recreation and preserve waterway habitats and wildlife corridors;
> the maintenance of the natural hydrologic behaviour of catchments by preserving the natural water cycle;
> the protection of water quality environmental values;
> the minimisation of the demand on the reticulated water supply system and utilisation of stormwater as a
valued resource;
> the minimisation of capital and maintenance costs of stormwater infrastructure; and
> the integration of water into the landscape to enhance visual, social, cultural and ecological values.
The aim of this report is to determine the overall WSUD strategy for the site. Further analysis will be
conducted during the detailed design stage. This report will:
> Determine the relevant water quality objectives (WQO)for the site;
> Outline the water sensitive urban design (WSUD)measures that will be adopted for each precinct and the
site as a whole; and
> Conduct MUSIC modelling to determine whether WQOs can be met.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 1
Page 7
Noosa on Weyba
Stormwater Management Plan
~,.., Cardno@
2 Site Description
The location of the site is shown in Figure 1.
The J & K Hofmann land is bounded by Hollett Road to the south, Eenie Creek to the north and it includes
lots on both sides of Walter Hay Drive. Ephemeral tributaries of Eenie Creek run through or adjacent to
these lots. An existing farm dam is also located within this area. The site is currently used for rural purposes
and the majority of the site is densely vegetated with sections that have been cleared for grazing purposes.
The site is relatively steeply sloped, and the tributaries are well defined, except for the area just to the north
of Hollett Road where the ground is fairly flat and flows disperse over a wide area.
The Northbrook Pty Ltd land is located to the south-east of the J & K Hofmann land and is bounded by
Tidswell Road to the west and Lake Weyba to the east. The site is currently used for rural purposes. The
majority of Lot 11 has been cleared with sections of remnant vegetation. A tributary of Lake Weyba,
historically known as Keyser Creek, is located within Lot 11, and drains from south to north. A dam is also
located in this area. Keyser Creek, within Lot 11 is relatively flat and low lying with levels ranging from 0.7 to
1.1 mAHD. A track located along the northern boundary of the site currently acts as a bund controlling
outflows. It has a minimum level of 1.14 mAHD. At the southern boundary of the site the level of Keyser
Creek rises sharply to a minimum level of around 1.8 mAHD. The western section of Lot 11 is relatively flat
with a grade of around 1 percent and levels from 0.7 to 6.5 mAHD. The central section of Lot 11 drains
towards Keyser Creek and is generally more steeply sloped with levels up to 14.5 mAHD. The eastern
section of Lot 11 drains towards Lake Weyba and is generally moderately sloped with a grade of around 5
percent, and levels from 0.5 to 14.5 mAHD.
Lake Weyba is connected to Noosa River via Weyba Creek.
A geotechnical investigation of the site was carried out; refer Geotechnical Investigation (Cardno, August
2012). The results of this study concluded that subsurface conditions at the site generally consisted of a
layer of either loose sands or soft to firm clay underlain by stiff or better clays. Weathered rock was
encountered in some of the boreholes. These soils types indicate that infiltration of stormwater will not be a
suitable method of disposal.
The 1 :100000 Gympie Special geological map indicated that the expected subsurface strata across the site
would contain Quaternary alluvium along with lithofeldspathic labile and sublabile to quartzose sandstone,
siltstone, shale and coal from the late Triassic-Jurassic era. The geology map also indicates a regolith with
deep weathering profile. The quaternary alluvium may indicate a possibility of acid sulphate soil (ASS). Soil
tests conducted showed that actual and potential ASS was unlikely to be located on the site. However,
further testing and sampling is recommended once the area of disturbance is finalised. An acid sulphate soil
management plan will be required.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 2
Page 8
Noosa on Weyba
Stormwater Management Plan
~,.., Cardno@
3 Proposed Development
The concept development plan is shown in Appendix A. A summary of what is proposed in each precinct is
provided below.
Precinct 1
Area A
Area A is located within Lot 12 of the Northbrook site, adjacent to Lake Weyba, and consists of an existing
residence that will be renovated to provide facilities for residents of Noosa on Weyba.
Area B
Area B is located within Lot 11 of the Northbrook site, adjacent to Lake Weyba. It drains to the north-east
and the south-east towards Lake Weyba. This precinct is generally sloped at around 5 percent, with flatter
areas around the crest. 73 premium residential lots are proposed in this precinct.
Area C
Area C is located in the eastern section of Lot 11, and drains north-east towards Lake Weyba. The average
slope in this area is around 2 percent. Apartments and mixed use areas are proposed in this area, with
around 600 m2 of commercial area.
Area 0
Area D is located in the eastern section of Lot 11, and drains north-west towards Keyser Creek. The average
slope in this area is around 3 percent. 83 townhouses are proposed.
Area E
Area E is located in the eastern section of Lot 11, and drains west towards Keyser Creek. The average
slope in this area is around 3 percent. Retirement living and aged care facilities consisting of 120 residences
are proposed.
Precinct 2
Area F
Area F is located in the western section of Lot 11 and drains west towards Keyser Creek. This area is
relatively flat and low-lying. Some filling is required in this area to provide sufficient flood immunity. 40
residential lots are proposed.
Area G
Area G is located in the western section of Lot 11 and drains east towards Keyser Creek. This area is
relatively flat and low-lying, with higher and steeper areas along the boundary with Tidswell Road. Some
filling is required in this area to provide sufficient flood immunity. 124 residential lots are proposed.
Precinct 3
AreaH
Area H is located on the eastern side of Walter Hay Drive, within Lot 53 of the J & K Hofmann site. It drains
north towards Eenie Creek and east towards Keyser Creek. The western section of this area is relatively flat
with grades of around 1 percent, and the eastern section is sloped at around 3 percent. 24 townhouses and
52 residential lots are proposed.
Area I
Area I is located on the western side of Walter Hay Drive, within Lot 53 of the J & K Hofmann site. It drains
west towards a tributary of Eenie Creek. The northern section of Area I drains directly towards Eenie Creek.
The slopes within this area are around 5 percent, except for the northern section where they are around 1
percent. A total of 203 residential lots are proposed.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 3
Page 9
Noosa on Weyba
Stormwater Management Plan
~,.., Cardno@
Precinct 4
Area J
Area J is located on the western side of Lot 53 and drains east into the tributary of Eenie Creek. One rural
residential lot is proposed.
Area K
Area K is located on the western side of Lot 53, bounded by Hollett Road West to the south. It drains east
towards the tributary of Eenie Creek, upstream of the existing dam. The slopes in this area are around 2
percent. 6 premium residential lots are proposed.
Area L
Area L is located within Lot 2 of SP179590, in the J & K Hofmann site. It drains north towards another
tributary of Eenie Creek. The southern section of the site is quite flat, which steeper areas of around 5
percent in the northern part of the lot. Retirement living and aged care facilities consisting of 100 residences
are proposed.
The proposed precincts are all located within areas that have been previously cleared for grazing purposes.
The majority of the site will be retained in its natural state and/or revegetated.
Along Lake Weyba a 50 metre buffer area will be provided to the lot boundary, consisting of 40 metres of
open space and 10 metres of stormwater treatment area. This buffer area has mainly been cleared for cattle
grazing purposes. Revegetation of this area is proposed which will provide screening and improve its
ecological value. The buildings within the lots will be set back a further 10 metres, providing a total set back
of 60 metres to the lake. In Precinct 2 a 120 metre wide waterway corridor will be provided, which
encompasses Keyser Creek. The existing vegetation and dam in this area will be maintained and
rehabilitated. No compensatory excavation is proposed in this area so as to minimise potential
environmental impacts associated with vegetation clearance and the exposure of disturbed soils within a
waterway corridor. Flood modelling has shown that dense revegetation of this area would also be
achievable with acceptable flooding impacts for the site and surrounding properties, should this be desirable.
The existing dam and vegetated tributary located within Lot 53 will be maintained and rehabilitated.
The proposed development has reticulated water and sewerage, and will pump effluent to the Noosa
Sewerage Treatment Plant (refer Water Supply and Sewerage Analysis, Cardno, October 2012). Previous
development applications for this site have utilised on-site treatment and disposal of effluent via irrigation.
This development plan therefore reduces the risk of contaminants from effluent being discharged into Lake
Weyba.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 4
Page 10
Noosa on Weyba
Stormwater Management Plan
~,.., Cardno@
4 Integrated Water Cycle Management Plan
An Integrated Water Cycle Management Plan (IWCMP)has been prepared by Gilbert and Sutherland as part
of the Noosa on Weyba development (refer IWCMP, Gilbert and Sutherland, August 2012).
The ICWMP considered several servicing options for the development. The Gilbert and Sutherland report
recommends Option 4 as the preferred servicing strategy. In summary:
"Option 4 assumes sewage is treated off-site at the Noosaville STP and maximises rainwater harvesting at
each residence. It is typical of IWCWMP systems in high rainfall areas which achieve a reasonable reduction
in potable water demands.
> Domestic water supply: sourced from the municipal supply and domestic rain tanks (for toilet cisterns and
laundry);
> Wastewater management: sewerage from development precincts to the Noosaville STP;
> Domestic garden irrigation supplied from the domestic rain tanks;
> Roof tank overflow and stormwater flows through bio-retention swales and basins, prior to creek
"
discharge.
The recommendations of the IWCMP will be adopted as part of the WSUD strategy for the site. Rainwater
harvesting will be maximised through the connection of all available roof area to the tank and the utilisation
of rainwater tank sizes around twice the size prescribed by the Queensland Development Code (QDC).
Collected rainwater will be used for irrigation, toilet flushing and laundry purposes. This will significantly
reduce the potable water demand of the site. The MUSIC modelling has conservatively assumed that the
tanks would only be used for domestic irrigation purposes for standard residential precincts and open space
irrigation of the other communal precincts. Due to the large size of the rainwater tanks being proposed they
could also be used to irrigate the remaining open space areas on site, which would further reduce the
potable water demand and reduce the volume of stormwater being discharged from the site.
The installation of water efficient devices and appliances has also been assumed.
Stormwater flows will be treated to the required WQOs prior to being released into the gullies and waterway
corridors located within the site. These areas will be rehabilitated and will provide some additional polishing
of stormwater prior to release into Lake Weyba.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 5
Page 11
Noosa on Weyba
Stormwater Management Plan
~,.., Cardno@
5 Water Quality Objectives
5.1 Stormwater Quality Objectives
The WQOs for stormwater treatment for the site cover three main components: pollutant load removal
targets; frequent flow management; and waterway stability. These WQOs have been derived from Maroochy
Shire Council Planning Scheme Policy No.6 as well as the Urban Stormwater Quality Planning Guidelines
(DEHP, 2010). Design objectives are specified for both the construction and operational phases of
development.
CONSTRUCTION PHASE
During the construction phase of development, the water quality objectives (WQOs)for the site include:
> Coarse sediment-coarse sediment is retained on site.
> Fine sediment (T55)-site discharge during sediment basin dewatering has a TSS concentration less
than 50 mg/L. Achieve site discharge water quality through, for example, appropriate sediment basin
design and operation with flocculation as required. It is noted that on the Sunshine Coast basins are
typically designed for 125mm rainfall depth over a five day period.
> Turbidity-Site discharge during sediment basin dewatering has a turbidity (NTU)less than 10% above
receiving waters turbidity. A site-specific relationship should be developed between turbidity and
suspended solids, prior to the commencement of construction.
> Nutrients (N & P)-Nitrogen and phosphorous are managed through sediment control.
> pH-Site discharge during sediment basin dewatering has a pH range 6.5-8.5
> Litter and other waste-Prevent litter/waste entering the site, the stormwater system or watercourses
that discharge from the site. Also minimise or sufficiently contain on-site litter and waste production and
regularly clear waste bins.
> Hydrocarbons and other contaminants- no visible sheen, no detectable odour. Hydrocarbons and
other contaminants are prevented from entering the stormwater system or internal watercourses that
discharge from the site.
> Wash down water-Wash down water is prevented from entering the stormwater system or internal
watercourses that discharge from the site.
> Cations and anions-Cations and anions including aluminium, iron and sulfate are managed as required
under an approved acid sulphate soil management plan.
The focus during the construction phase will be erosion and sediment control. Appropriate measures, such
as silt fences and berms will be adopted on a lot by lot basis. The proposed bio-retention and detention
basins can also be utilised as temporary sedimentation basins. The filter media will either be protected or
not installed until the majority of construction within the catchment area has been completed. Dedicated
temporary sedimentation basins will be required in some areas. An erosion and sediment control plan will be
required for each stage of the construction.
OPERATIONAL PHASE
Pollutant Load Reduction
During the operational phase the following pollutant load removal targets are specified for the development:
> Gross Pollutants: 90 percent reduction compared to untreated runoff;
> Total Suspended Solids (TSS):80 percent reduction compared to untreated runoff;
> Total Phosphorous (TP):60 percent reduction compared to untreated runoff; and
> Total Nitrogen (TN):45 percent reduction compared to untreated runoff.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 6
Page 12
Noosa on Weyba
Stormwater Management Plan
~,.., Cardno@
The WSUD features proposed for the site will be modelled with MUSIC to ensure these WQOs are met.
In addition the pollutant load from the site will be compared to the existing case, using MUSIC, to ensure that
the pollutant load from the site is not being increased.
Frequent Flow Management
The impervious percentage of the developed areas is greater than 40 percent. Therefore it is required to
capture and manage the first 15mm/day of runoff from all impervious surfaces. The storage volume should
be able to drain within 24 hours.
Waterway Stability
Limit the post-development peak 1 year ARI event discharge within the receiving waterway to the pre-
development peak 1 year ARI event discharge.
5.2 Noosa River Environmental Values and Water Quality Objectives
According to DEHP’s Noosa River Environmental Values and Water Quality Objectives (July, 2010) Lake
Weyba is located in area NME1 Noosa Lakes (middle estuary) and the following environmental values
-
apply:
> Aquatic Ecosystems
> Seagrass
> Human Consumer
> Primary Recreation
> Secondary Recreation
> Visual Recreation
> Cultural and Spiritual Values
The applicable water quality objectives for Lake Weyba are to maintain the existing water quality (20th, 50th
and 80th percentiles), which are:
> Turbidity: 2 -
5 -
8 NTU
> Suspended Solids (TSS):20 -
20 -
20 mg/L
> Chlorophyll a: 0.8 -
1.5 -
2.5 I-Ig/L
> Total Nitrogen (TN): 150 -
240 -
380 I-Ig/L
> Oxidised N: 2 -
5 -
15 I-Ig/L
> Ammonia N: 7 -15 -
32 I-Ig/L
> Organic N: 130 -
210 -
320 I-Ig/L
> Total Phosphorous (TP): 10- 13 -
16 I-Ig/L
> Filterable Reactive Phosphorous (FRP):2 -
2 -
2 I-Ig/L
> Dissolved Oxygen: 85 -
95 -
105% saturation
> pH: 8.0 -
8.2 8.3
-
> Secchi depth: 1.1 -
1.6 -
2.0 m
Healthy Waterways undertakes regular monitoring of water quality within Lake Weyba under their Ecosystem
Health Monitoring Program. The observed water quality from 2002, compared to the above objectives is
shown in Appendix B. The observed water quality for turbidity, chlorophyll a, TN, ammonia N, organic Nand
secchi depth currently do not meet the DEHP objectives. It should be noted that the target secchi depths are
greater than the average depths of Lake Weyba.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 7
Page 13
Noosa on Weyba
Stormwater Management Plan
~,.., Cardno@
MUSIC modelling will be used to determine the reduction in pollutant loads for the operational phase of
development. This is the approach recommended by DEHP to determine whether proposed treatment
devices will be sufficient. The resultant pollutant concentrations in the MUSIC modelling will be dependent
on the assumed default background concentrations within the treatment devices, which are in some
instances higher than the WQOs. For example the background TP concentration in bio-retention systems is
assumed to be 130 I-Ig/L. It is therefore not possible to show through MUSIC modelling that concentration
based WQOs can be met. Regular monitoring of water quality within Lake Weyba, conducted by Healthy
Waterways will be utilised to determine whether there is an impact from development, which will indicate that
the treatment measures being implemented on site should be reviewed.
Water quality monitoring of the existing waterbodies within the site will be conducted prior to development to
determine suitable discharge turbidity levels during the construction phase. Monitoring of TSS, TP, TN and
gross pollutants is also recommended during this stage to define the existing water quality.
Event based (i.e. greater than 30mm rainfall in 24 hours) water quality monitoring of the waterbodies within
the site should be conducted for TSS, TP, TN and gross pollutants to ensure that the above water quality
concentration objectives are met.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 8
Page 14
Noosa on Weyba
Stormwater Management Plan
~,.., Cardno@
6 Proposed WSUD Strategy
6.1 Summary
The proposed WSUD features are shown in Figures 3, 4 and 5. In summary the WSUD strategy for the site
included:
> Community Education. The most effective treatment measure is to reduce the source of pollutants.
Therefore community education is proposed so that residents are informed about what they can do to
reduce their impact on their surrounding environment. Information signs will be located at stormwater
devices. An information leaflet will be distributed to each residence prior to the wet season each year.
An example of the information leaflet is contained in Appendix C. As the development is a Community
Title Scheme the body corporate will also be able to instigate appropriate measures to reduce pollutant
loads from communal areas.
> Reducing Potable Water Demand. Water efficient devices and appliances will be installed in each
residence. Drought tolerant gardens will also be recommended.
> Providing an Alternative Water Source. All practically available roof area will be connected to
rainwater tanks that will be larger than QDC requirements, so as to maximise rainwater harvesting on
site, minimise potable water demand and reduce the volume of stormwater discharged from site.
Rainwater tanks will be used for toilet flushing, laundry and irrigation purposes.
> Bio-retention Basins. Bio-retention basins are located at the end of the stormwater line, upstream of the
point of discharge from the site. Stormwater ponds in the basins before slowly percolating through the
vegetated filtration media and being treated through bio-filtration processes. Filtered stormwater is
collected by perforated pipes and the discharged from site. Coarse sediment forebays will be located at
the inlet points to capture sediment and prevent blockage of the filter media.
> Bio-retention Gardens. Bio-retention gardens are small bio-retention basins that double as landscaped
areas within the road reserve. They will treat runoff through bio-filtration before it is discharged to the
stormwater system. Bio-retention gardens are suitable is relatively flat areas.
> Bio-retention Tree Pits. Bio-retention tree pits are trees located within filter media within the road
reserve. They can provide some pre-treatment of runoff from the road prior to it being discharged to the
stormwater system. Additional treatment will be required downstream. Tree-pits can be located in
moderately sloped areas.
> Bio-retention Swales. Bio-retention swales are like standard vegetated swales but with a filter media
layer to provide additional treatment of stormwater. They are typically located along road-sides and can
be used in flat to moderately sloped areas (around 2 percent).
> Vegetated Swales. Vegetated swales will be used where underdrainage or slope requirements make the
use of bio-retention swales
impractical.
> Litter Baskets. Bio-retention basins and gardens are generally sufficient to capture any gross pollutants
or litter from urban areas. However, as an additional treatment measure litter baskets will be installed on
the field inlets of bio-retention gardens, swales and basins, as well as any other stormwater outlet
discharging to the receiving waterways.
> Revegetation of Lake Weyba Buffer Area. A 40 metre wide lake buffer will be located along Lake
Weyba. This will provide additional treatment of stormwater that may overflow from the adjacent bio-
retention swales located in the 10 metre stormwater treatment zone. The buffer area, which has mostly
been cleared of vegetation for use as cattle grazing, will be revegetated, which will improve its
performance as a buffer treatment area, and improve bank stabilisation.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 9
Page 15
Noosa on Weyba
Stormwater Management Plan
~,.., Cardno@
> Rehabilitation of Keyser Creek Waterway Corridor. Rehabilitation will include the stabilisation of
banks where required, weed removal and revegetation. A dam already exists in Keyser Creek, upstream
of the crossing linking Areas F and G in Precinct 2. Rehabilitation of this area will improve its functionality
as a public open space, and also improve its ecological value.
> Wastewater Management. The proposed development has reticulated water and sewerage. Previous
development applications for this site have utilised on-site treatment and disposal of effluent via irrigation.
This development plan therefore reduces the risk of contaminants from effluent being discharged into
Lake Weyba.
The impact of community education, bio-retention tree pits, litter baskets, buffer area revegetation and
rehabilitation has not been included in the MUSIC modelling, unless stated otherwise. Therefore the MUSIC
results are a conservative assessment of the improvement in stormwater quality that can be achieved on
site.
The proposed treatment devices have been located outside of ecologically constrained areas and outside of
the 100 year ARI extent of inundation.
6.2 Treatment Device Details
6.2.1 Rainwater Tanks
All practically available roof area will be connected to the proposed rainwater tanks so that stormwater
harvesting on site is maximised.
10 kL tanks are proposed for each residential lot. 5 kL rainwater tanks are proposed for each townhouse or
retirement villa. These tanks will likely be combined into a smaller number of larger tanks for irrigation of
communal areas. A 120 kL tanks is proposed for the apartment buildings. These proposed rainwater tanks
sizes are around twice the standard rainwater tank sizes currently required by QDC and the former
Maroochy Shire Council.
Due to the large size of the proposed rainwater tanks it is likely that they will be underground systems. An
example of this kind of set-up from a local manufacturer (Action Tanks) is shown in Appendix D.
Pre-treatment of roof water via a litter screen is recommended, as shown in Appendix D. This litter screen
has not been included in the MUSIC modelling.
6.2.2 Bio-retention Basins
End-of-line bio-retention basins will be utilised in areas where the slopes are too steep or there is insufficient
area for bio-retention gardens within the road reserve. Bio-retention tree-pits will also be utilised in these
areas, where practical, to provide some pre-treatment of runoff. However, these were not included in the
MUSIC modelling (refer Section 7).
The proposed bio-retention basins and gardens will provide some minimal attenuation of peak flows. Most of
the attenuation of major peak flows on site will be provided by the proposed road culvert crossings (refer
Flood Study, Cardno, October 2012). The bio-retention basins for catchments 3_1_4, 3_1_5 and 4_L will be
combined into the detention basins proposed for these sub-catchments. The design of these detention
basins will be conducted at detail design stage, however, indicative sizes are shown in Figure 3, 4 and 5.
The remaining bio-retention basins will only be utilised for stormwater quality purposes. Therefore the
basins will not be as deep.
For the detailed civil design of each basin the following elements should be included.
> The overflow pits and weirs should ideally be located near the inlet points, so that during major rainfall
events the scouring of bio-retention vegetation is minimised.
> Access ramps should be provided for each basin so that maintenance vehicles can gain access to the
base.
> Coarse sediment forebays or sedimentation ponds should be installed at inlet points.
> The perforated pipe underdrainage should be spaced at approximately 2 metre intervals.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 10
Page 16
Noosa on Weyba
Stormwater Management Plan
<..f) Carcln @
> Clean out points should be provided for all underdrainage.
> Litter baskets should be installed on the overflow pits.
The bio-retention filter media was assumed to be sandy loam with a saturated hydraulic conductivity of 200
mm/hr. The extended detention depth was assumed to be 0.3 metres. The filter depth assumed was either
0.6 or 0.8 metres. Transition and drainage layers will also be required underneath the filter media. In areas
outside of the Asset Protection Zone (APZ)the bio-retention basins can be planted with suitable trees such
as melaleucas. These require a filter depth of 0.8 metres. The advantage of planting trees in bio-retention
basins is that they improve the aesthetics and bio-diversity. They also reduce the likelihood of blockage of
the filter media. Recent studies have shown they do not increase the risk of blockage of the underdrainage.
A typical bio-retention basin cross-section is shown in Image 1.
Overflow Weir
~
Clean Out Point
Inlet Pipe
0.3m Extended Detention Depth
Concrete Lined
Coarse Sediment 0.6m Filter Media (Sandy Loam)
Forebay
0.1 m Transition Layer (Coarse Sand)
~0.2m Drainage Layer (Fine Aggregate)
Geotextile Fabric
Underdrainage Outlet Pipe
(0.50/0 slope)
Image 1 Typical Bio-retention Basin Cross-section
6.2.3 Bio-retention Gardens
Bio-retention gardens are similar to bio-retention basins, except that they are smaller in size and located
within the road reserve, and so can be incorporated into the landscaping. They treat runoff from surrounding
areas before it is discharged to the stormwater pipes.
They are effective treatment devices in relatively flat and low-lying areas as they do not need as much
vertical differentiation.
The bio-retention filter media was assumed to be sandy loam with a saturated hydraulic conductivity of 200
mm/hr. The extended detention depth was assumed to be 0.15 metres. The filter depth assumed was 0.8
metres, to allow for the planting of trees. Transition and drainage layers will also be required underneath
the filter media.
A typical bio-retention garden will have a filter area of 9 m2 and a surface area of around 20 m2 to allow for
batters, coarse sediment forebay and field inlet. They will each treat runoff from every two lots on average.
Larger gardens will be positioned in areas where there is sufficient space.
The location and design of the bio-retention gardens will be detailed during the design of the Precincts.
Road reserve widths of at least 15 metres will be necessary to accommodate them. They can be utilised as
traffic calming devices.
To improve the treatment efficiency of the bio-retention gardens the overflow from the rainwater tanks will be
connected directly to the underground drainage. This will ensure that relatively clean roofwater is not re-
contaminated, it will improve the drainage efficiency of the road reserve and so reduce the risk of local
flooding. A sensitivity analysis looking at the impact of draining the rainwater tanks to the bio-retention
gardens will be conducted.
For the detailed civil design of each basin the following elements should be included.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 11
Page 17
Noosa on Weyba
Stormwater Management Plan
~,.., Cardno@
> Coarse sediment forebays on the inlet point.
> Batters should be densely vegetated to deter pedestrian/vehicle access. The batter slope should be at
least 1 in 2.
> Inorganic mulch laid over the filter media surface improves moisture retention. The mulch used should
not float during rainfall.
> The overflow pit invert will be 150 mm above the base to provide for extended detention. The total depth
of the bio-retention garden will be around 250 mm to prevent ponding within the road.
> Litter baskets should be installed on the overflow pits.
> Clean out points should be provided for all underdrainage.
> A flat pedestrian refuge area of around 300mm width should be provided along the boundary with the
road.
A typical bio-retention garden cross-section is shown below in Image 2 and an example is shown in Image 3.
WSUD garden bed type 2 -
plan Section A-A
1A 150m m thick COrlOr.t. apron,
SL62 me,h. 50 to~ co.er, 1 in +
max. Ge1:ltechn c<1I engineer to
confirm com paction requirements
AOjacent road
Type ’D’ kerb
SUr’f t or subsoil.
, and channel.
Coarse sediment
Concrete apron.
10reOOy, reler note 1.
Vegetated bioretention
Planted b<JUer, Side drClins un<ler kerb (]nd pod finished surface l-evel.
refer note 4. channel to connect to inlet refer notes 5 and 6.
p~ sepc rotely to bioretention
under-df(]in ge.
Coarse sediment
forebay, refer nate 1. Bior-ete-ntion filter medic.
Field inlet Type 1 in Refer UI.IS 160.
Under drainage, accord(]nce with UMS 337. (Removing "B oretention
refer note 2. filter me<lio. For details ~ ~er clotm and/or i m pe,mea bl.
refer IPI’lEAO Std Ilwgs liner to be,e and ,ides. Pin
WSUD-OO 1 and filter clotll to i nsitu soi I (]nd
8ioreterrtion
filter med Q, WSUD-002). lay concrete onto filter cloth,
refer note 3.
..JA
Image 2 Typical Bio-retention Garden (Water Sensitive Urban Design: Streetscape Planning and
Design Package, Brisbane City Council, 2011)
Image 3 Bio-retention Garden
6.2.4 Bio-retention Swales
Bio-retention swales are similar to bio-retention basins, except that they are long and narrow systems with
no extended detention depth. They have a shallow longitudinal grade of 2 percent or less. Field inlets are
located along the length of the swale to drain excess flows. Litter baskets should be installed on all field
inlets.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 12
Page 18
Noosa on Weyba
Stormwater Management Plan
~,.., Cardno@
Batter slopes of 1 in 6 have been assumed for bio-retention swales adjacent to roads. For other bio-
retention swales batter slopes of 1 in 4 have been used.
Bio-retention swales are proposed adjacent to the lake buffer zone in Area B. To better simulate natural flow
patterns several underdrainage outlets will be located along the length of the swale, which will discharge
treated stormwater directly to the lake. Several rock check dams will be located along the length of the swale
where some of the overflow will be discharged across the adjoining lake buffer. Appropriate scour protection
will be required in these areas. The stormwater treatment zone has a width of 10 metres. Based on natural
surface levels the width of the swale required would be around 7 to 8 metres. Further details are provided in
Section 8.
6.2.5 Litter Baskets
As the proposed development is a community title scheme the maintenance of stormwater quality devices
will be the responsibility of the body corporate. In standard residential developments litter baskets would not
be used due to their ongoing maintenance requirements. For further details of the maintenance
requirements refer to Appendix F.
Litter baskets have been proposed on all inlets discharging to downstream waterways so that any excess
litter and gross pollutants not captured by the other proposed WSUD measures is retained on site and not
discharged downstream. Litter baskets will therefore be required in bio-retention gardens, bio-retention
gardens, bio-retention swales and vegetated swales.
They have an advantage over in-ground gross pollutant traps (GPTs)in that litter is stored in a dry state,
which reduces the risk of dissolved pollutants being discharged downstream. The maintenance of litter
baskets is also more straightforward. They are designed not to impact on the hydraulic efficiency of the gully
or field inlets in which they are installed.
The Ecosol RSF 100 is a typical example of a litter basket that could be used on site.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 13
Page 19
Noosa on Weyba
Stormwater Management Plan
~,.., Cardno@
7 MUSIC Modelling
7.1 Summary
MUSIC Version 5.1.16 was used in the analysis. The MUSIC Modelling Guidelines for South East
Queensland (Healthy Waterways, 2010) were used as the main reference to set up the models.
The rainfall data was taken from Cooroy Composite (40059)for the 10 year period from the 1/1/1973 to
31/12/1982. A 6 minute time step was adopted.
The MUSIC model layouts for each precinct are shown in Appendix E.
7.2 Catchment Areas
The sub-catchment areas are shown in Figure 2.
The rainfall runoff parameters and pollutant export parameters were taken from Tables 3.7 and 3.8 of the
MUSIC Modelling Guidelines.
For the existing case a rural-residential node was used, with a 0 percent impervious value. For the
developed case an urban-residential nodes were used, except for a small area of commercial development
in Area C. The residential areas were assumed to be 60 percent impervious, townhouses, apartments and
retirement living areas were assumed to be 70 percent impervious.
The breakdown of road, roof and ground area was based on the concept masterplan layout. For precincts
where the layout has not been specified typical surface type splits from Table 3.3 of the manual were used.
The roof area of premium residential lots was assumed to be 250 m2, and the roof area for standard
residential lots was assumed to be 215 m2 in accordance with Table 3.3. All of the available roof area will be
connected to rainwater tanks so as to maximise stormwater harvesting on site.
The new access roads have been included in the MUSIC modelling. The upgrade of existing Council roads
will be undertaken on behalf of Councilor by Council, at a cost to the development. These roads will be
provided with best practice stormwater quality treatment. These road upgrades have not been included in
the MUSIC modelling.
The breakdown of each sub-catchment is shown in Table 7-1.
Table 7-1 MUSIC Sub-catchments
~l~ ~ ~ (ft I
~ (JlE1] t::mE ~1l ~ ~lI llmE ~0
(Iffi1l ~ (JlE1) ~ [liEt] ~
~ ~ ~
1 _B_1 1.200 0.425 100 0.161 60 0.614 32
1 _B_2 1.948 0.525 100 0.566 60 0.857 36
1 _B_3 0.555 0.225 100 0.330 33
1 _B_4 1.280 0.325 100 0.490 60 0.465 32
1 _B_5 0.895 0.325 100 0.112 60 0.458 32
1 _B_6 0.139 100 0.139 60
1_C_1 1.264 0.442 100 0.379 70 0.442 30
1 _0_1 3.911 1.369 100 1.173 70 1.369 30
1 _0_2 0.833 0.833 60
1 _0_3 0.278 0.278 60
1 _E_1 3.174 1.111 100 0.952 70 1.111 30
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 14
Page 20
Noosa on Weyba
Stormwater Management Plan
~,.., Cardno@
C!lll@11l1:OO ~t::mE ~ ~ ( I
WilliE
(Jmtl o:mt?J [it9;ui3tiHDIlii 0lEn lR9J iiDlJn ~ ~gJllmlii
(Jm1] ~ [Jffi1) ~ (Jml) ~
~ ~ [JQ]
2_F_1 3.240 0.860 100 1.005 60 1.375 35
2_G_1 8.273 2.666 100 1.995 60 3.612 30
2_G_2 0.716 0.716 60
3_H_1 0.607 0.212 100 0.182 60 0.212 30
3_H_2 1.049 0.298 100 0.364 60 0.387 35
3_H_3 1.963 0.618 100 0.476 60 0.869 36
3_H_4 1.981 0.323 100 0.620 60 1.038 48
3_H_5 1.190 1.190 60
3_1_1 4.018 1.118 100 0.906 60 1.994 38
3_1_2 2.891 0.723 100 0.596 60 1.572 42
3_1_3 3.427 1.011 100 0.634 60 1.782 37
3_1_4 5.242 1.226 100 1.707 60 2.309 39
3_1_5 1.147 0.258 100 0.294 60 0.595 43
4_K 0.665 0.150 100 0.154 60 0.361 43
4_L 4.473 1.566 100 1.342 60 1.566 30
Area J is a large rural residential lot. The layout for this area has not yet been defined, but the developed
area is likely to only take up a small part of the area. The most suitable treatment measures will be
determined when this area has been more clearly defined. It is likely that the most appropriate treatment
measures would be rainwater tanks and vegetated swales.
Area A has not been included in the modelling as it is the renovation of an existing building. However, it is
recommended that larger rainwater tanks be installed in this area to reduce the potable water demand.
7.3 Treatment Devices
7.3.1 Rainwater Tanks
The rainwater tanks were set up using the Healthy Waterways MUSIC Modelling Guidelines. It was
assumed that a 10 kL tank would be provided for each residential lot and a 5 kL tank would be provided for
each townhouse or retirement villa. For the proposed apartment buildings a 120 kL tank was used. A
sensitivity analysis will be conducted to determine the impact of only providing half of this tank size.
The rainwater tank usage rates assumed that full water saving devices would be adopted (i.e. 21 LIp/day for
toilet flushing and 26 LIp/day for laundry). The following occupancy rates were assumed:
> 2.8 people per residential lot;
> 2.0 people per townhouse or retirement villa; and
> 1 .7 people per apartment.
For outdoor uses it was assumed that 70 percent of the ground area would be irrigated at 548 mm/year,
which is the rate recommended for private gardens (refer MUSIC Guidelines). The ground area was
assumed to be 300 m2 for premium residential lots and 235 m2 for standard residential lots. For the other
types of development the ground area was taken from the MUSIC model sub-catchment area. The outdoor
use was scaled by PET and rainfall. Therefore on days where there is sufficient rainfall no irrigation would
be applied.
The details of each rainwater tank are shown in Table 7-2.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 15
Page 21
Noosa on Weyba
Stormwater Management Plan
~,.., Cardno@
Table 7-2 Rainwater Tank Details
$f~I"I~ ~~
I I ~~
(J!
170
~
~
1956.7
~00:1?l
~
2.237
1_B_1
1_B_2 210 2417.1 2.764
1_B_3 90 1035.9 1.184
1_B_4 130 1496.3 1.711
1_B_5 130 1496.3 1.711
1_C_1 120 1697.3 4.000
1_D_1 415 5251.1 7.802
1_E_1 600 4261.5 11.280
2_F_1 400 3604.0 5.264
2_G_1 1240 11172.4 16.318
3_H_1 60 814.8 1.128
3_H_2 140 1611.2 1.955
3_H_3 290 3337.5 4.042
3_H_4 150 1351.5 1.974
3_1_1 520 4685.2 6.843
3_1_2 350 3153.5 4.606
3_1_3 470 4234.7 6.185
3_1_4 570 5135.7 7.501
3_1_5 120 1081.2 1.579
4_K 60 690.6 0.790
4_L 500 6005.4 9.400
7.3.2 Bio-retention Basins and Bio-retention Gardens
The bio-retention basins were set up using the Healthy Waterways MUSIC Modelling Guidelines. The filter
area and surface area were assumed to be the same, so as to allow for future changes in the batter design.
This is a conservative assumption as it underestimates the storage volume available. The indicative sizes of
the basins shown in Figures 3, 4 and 5 allow for a depth of 1 metre and a batter slope of 1 in 4. The bio-
retention/detention basins assumed a depth of 1.5 metres. Sufficient area for coarse sediment forebays and
field inlets was also provided.
A saturated hydraulic conductivity of 200 mm/hr was assumed. This is typical of sandy loam filter media.
The TN content of the filter media was assumed to be 800 mg/kg. The
orthophosphate content was
assumed to be 50 mg/kg. The bio-retention devices were assumed to be planted with effective nutrient
removal plants.
A sensitivity analysis was conducted where the saturated hydraulic conductivity was reduced to 50 mm/hr, to
determine the potential impact of filter blockage.
No exfiltration was assumed. The overflow width was assumed to be one tenth of the surface area as
recommended by the guidelines.
The extended detention depth of the bio-retention basins was assumed to be 0.3 metres. The extended
detention depth for bio-retention gardens was assumed to be 0.15 metres.
The bio-retention gardens in each sub-area were combined into the one treatment node.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 16
Page 22
Noosa on Weyba
Stormwater Management Plan
~,.., Cardno@
The details of each bio-retention basin and bio-retention garden are shown below in Table 7-3.
Table 7-3 Bio-retention Basin and Bio-retention Garden Details
~ ~~ ~ ~~ ~ ~ ~
mm (JTIfi] nIDil (lITO ~ ’iMttJ~ ~
~ (Jml am)
~ ~
(Jm)
~ ~
~
Bio-retention Gardens
1_B_4 120 120 270 0.80 0.15 0.25 12.0
1_C_1 120 120 270 0.80 0.15 0.25 12.0
2_F_1 243 243 540 0.80 0.15 0.25 24.3
2_G_1 558 558 1240 0.80 0.15 0.25 55.8
Bio-retention Basins
1_B_1 110 110 350 0.60 0.30 1.00 11.0
1_B_5 75 75 280 0.60 0.30 1.00 7.5
1_D_1 370 370 720 0.80 0.30 1.00 37.0
1_E_1 270 270 630 0.80 0.30 1.00 27.0
3_H_3 180 180 460 0.60 0.30 1.00 18.0
3_H_4 180 180 460 0.60 0.30 1.00 18.0
3_1_1 350 350 690 0.60 0.30 1.00 35.0
3_1_2 260 260 620 0.60 0.30 1.00 26.0
3_1_3 300 300 680 0.60 0.30 1.00 30.0
Bio-retention/Detention Basins I
3_1_4 450 450 1640 0.60 0.30 1.50 45.0
3_1_5 100 100 530 0.60 0.30 1.50 10.0
4_L 400 400 1550 0.60 0.30 1.50 40.0
7.3.3 Bio-retention Swales
The bio-retention swales were set up using the Healthy Waterways MUSIC Modelling Guidelines. They were
set up as two treatment nodes in
series; a bio-retention node with no extended detention
depth and a
vegetated swale with a low flow bypass equal to the filter media treatment rate. The vegetated swale was
assumed to be half the actual length as recommended by the guidelines.
The same filter media details as for the bio-retention basins were used. The filter depth was typically
assumed to be 0.6 metres, but this can be made deeper if preferred to allow for the planting of trees.
The details of the MUSIC treatment nodes are shown in Table 7-4 and 7-5.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 17
Page 23
Noosa on Weyba
Stormwater Management Plan
~,.., Cardno@
Table 7-4 Bio-retention Node Details
Cil:f~ III ~i]J ~~[Jnfb ~emEJ ~Bn ~~
I mmm
I I [Inti] I
.
==
I.~~~.I ~[JrQ]
1 _B_2 300 300 0.6 0 30.0
1 _B_3 140 140 0.6 0 14.0
1 _D_2 195 195 0.6 0 19.5
2_G_2 125 125 0.6 0 12.5
3_H_1 80 80 0.6 0 8.0
3_H_2 105 105 0.6 0 10.5
4_K 90 90 0.6 0 9.0
Table 7-5 Swale Node Details
~ ~ l1m!l100!l!lJ ~Wltm ’i~ ~(JIT ~
mmm (lITO
~
(lTII}
.
0 ~
~
1lgJ’t1l IlgJ’
1 _B_2 50 100 0.017 3.0 5.4 0.3 1.5
1 _B_3 70 140 0.008 1.0 3.4 0.3 1.4
1 _D_2 195 390 0.011 0.5 4.1 0.3 2.0
2_G_2 125 250 0.007 0.5 4.1 0.3 0.5
3_H_1 80 160 0.004 0.5 4.1 0.3 0.5
3_H_2 105 210 0.006 0.5 4.1 0.3 2.0
4_K 45 90 0.005 1.0 4.6 0.3 0.5
The actual widths of the bio-retention swales may be wider than shown in Table 7-5 to allow for appropriate
battering.
7.3.4 Vegetated Swales
The details of the proposed vegetated swales are shown in Table 7-6. Vegetated swales were proposed in
areas considered to be too steep for bio-retention swales or where there was insufficient vertical
differentiation for underdrainage to be installed. The batter slopes were assumed to be 1 in 6 as they are
adjacent to roadways.
Table 7-6 Vegetated Swale Details
~ ~ l1mw00!l!lJ ~Wltmll wm~ ~OIT ~
mmm Oim
~
[lri1}
.
(lITO ~
~
~ ~
1 _B_6 65 130 0.0 0.0 3.6 0.3 3.0
3_H_5 260 520 0.0 0.0 3.6 0.3 0.5
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 18
Page 24
Noosa on Weyba
Stormwater Management Plan
~,.., [email protected] Litter Baskets
Litter Baskets will be installed on all inlets discharging to downstream waterways. They have not been
included in the MUSIC model, except for sub-catchment 1_D_3, which is the proposed culvert crossing of
Keyser Creek, where it is the sole treatment device. Other WSUD measures are not practical in this location,
which is the low-point of the road.
The litter basket was assumed to remove 100 percent of gross pollutants and 50 percent of total suspended
solids. No removal of nutrients was assumed.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 19
Page 25
Noosa on Weyba
Stormwater Management Plan
~,.., Cardno@
8 MUSIC Model Results
8.1 Load Reduction
The resultant load reduction with the proposed treatment train in place is shown in Table 8-1. The results
show that the load reduction targets are met for all precincts. For the site as a whole the WQOs are easily
met.
Table 8-1 Pollutant Load Reductions
[it1J1!I}J;1l [;trgjJ’G=WIbmlt!l ~f1" uw::D
~ I
~ ll’rm ~
cmJ
ID C!l [!) [3 ~ @ rn D [3 [b
Total 80.0 84.7 82.4 82.4 80.7 80.2 81.3 84.9 80.8 90.2 81.5 82.2
Suspended
Solids (TSS)
Total 60.0 64.5 63.0 62.1 63.7 61.1 61.8 67.1 62.4 67.9 63.0 63.2
Phosphorous
(TP)
Total Nitrogen 45.0 53.0 46.3 52.8 57.5 45.8 45.1 48.2 55.7 45.5 56.5 51.9
(TN)
Gross 90.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
Pollutants
(GP)
The developed case pollutant loads were also compared to the existing case. The results are shown in
Table 8-2. The results show that the developed case pollutant loads are less than or equal to the existing
case pollutant loads for all pollutants modelled. Therefore the proposed development provides an
improvement in stormwater quality being discharged from site, based on the pollutants modelled.
Table 8-2 Comparison to Existing Case
1ft:1JJiIDC!h
~{!hE
( ,mm
Total Suspended Solids (kg/yr) 117000.0 114640.0 20435.0
Total Phosphorus (kg/yr) 106.0 228.3 83.9
Total Nitrogen (kg/yr) 814.0 1258.5 605.6
Gross Pollutants (kg/yr) 0.0 14264.0 0.0
It should be noted that only the developed areas of the site were modelled in MUSIC. The remaining areas
will be designated as parks, buffer areas and conservation zones and rehabilitated and/or revegetated as
appropriate. As some of these areas are currently used for cattle grazing it is expected that the resultant
stormwater quality from these areas will also improve.
8.2 Sensitivity Analysis
Several sensitivity analyses were run to determine the potential impact of filter media blockage; the impact of
having only half the tank volume and the impact of connecting roof area to the bio-retention gardens, rather
than directly to underground drainage. The results are shown Table 8-3.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 20
Page 26
Noosa on Weyba
Stormwater Management Plan
~,.., Cardno@
If the filter media hydraulic conductivity reduces from 200 mm/hr to 50 mm/hr the WQOs are not met.
However, it should be noted that a significant reduction in pollutant loads, close to the WQO targets, is still
achieved and the resultant pollutant load would still be less than the existing case. Proper maintenance of
the filter media will be required to ensure that the hydraulic conductivity does not significantly reduce over
time.
If only half of the tank size is implemented then the WQOs are still met for all pollutants, for the site as a
whole. Therefore if necessary, the QDC minimum size tanks could be adopted on site. It should be noted
that for Areas C, F, G and K the TN WQO is not met. It is therefore recommended that these precincts adopt
the larger tank sizes. The proposed tank sizes supply around 82 percent of the non-potable water demand.
If the tank sizes are halved this reduces to around 66 percent. The larger tank sizes therefore supply an
additional 23 ML/yr of non-potable water. Non-potable water demand is generally estimated to be around 65
percent of the total water demand. Therefore around 53 percent of the total water demand of the site can be
supplied by rainwater tanks. It is therefore recommended that the proposed larger tank sizes be maintained
so that the water demand of the site is minimised. It should be noted that irrigation of park areas outside of
the precinct areas has not been assumed in the MUSIC modelling. The larger tank sizes will potentially also
allow for irrigation of these areas, therefore further reducing the water demand of the site.
The proposed bio-retention gardens will have the rainwater tank overflow directly connected to underground
drainage. This was found to improve the efficiency of the bio-retention gardens as it allows them to better
treat the runoff from the road and ground nodes. A sensitivity analysis was conducted to determine the
impact of having rainwater tank overflow draining to the kerb. The results show that for the site as a whole
that the WQOs are still met. For the effected precincts there was a reduction in the removal of TSS and TP
below the WQO and an improvement in the TN removal. It is therefore recommended that these areas
maintain the direct connection to underground drainage. However, if this is not possible in some areas, the
WQOs for the site as a whole are still met if tank overflow is directed to the kerb.
Table 8-3 Sensitivity Analysis Results
~ ma g~i ru c:wl!mml ~i uNA D
.
I
I
wm!l ~ ~~ mrrn~ ~mID
~ @ll’iIim:IDi1 rID @:rl!l:H"" I
Total Suspended Solids (TSS) 80.0 82.2 77.5 81.7 80.8
Total Phosphorous (TP) 60.0 63.2 59.2 62.1 62.6
Total Nitrogen (TN) 45.0 51.9 42.5 49.9 53.3
Gross Pollutants (GP) 90.0 100.0 100.0 100.0 100.0
The impact of community education, bio-retention tree pits, litter baskets, buffer areas and rehabilitation of
the waterway corridors has not been included in the MUSIC modelling, unless stated otherwise. Therefore
the MUSIC results are a conservative assessment of the improvement in stormwater quality that can be
achieved on site.
8.3 Frequent Flow Objective
The developed area of the site is 56.36 hectares, and is on average 62.5 percent impervious. The first 15
mm of runoff from impervious surfaces is therefore 5.28 ML/day. Based on the 10 years of rainfall data used
in the MUSIC modelling, the average annual runoff from the first 15mm of runoff from impervious surfaces is
equivalent to 317.2 ML/year. The total average annual runoff was 607.8 ML/year.
The MUSIC model was used to determine how much of the runoff was being treated by the bio-retention
basins and swales. The rainwater tanks were removed from the modelling, so that there were no other
outflows. The amount of runoff being treatedby the bio-retention basins and swales alone was 364.7
ML/year. This is greater than the amount of runoff generated from the first 15mm of rainfall from impervious
surfaces, and therefore the frequent flow objectives are met.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 21
Page 27
Noosa on Weyba
Stormwater Management Plan
~,.., Cardno@
The proposed rainwater tanks have a total volume of 6.375 ML. The daily usage is on average 0.282
ML/day, or 103.1 ML/year. The proposed tanks supply around 84.5 ML/year of this non-potable demand.
Therefore the total flow being treated or removed will be greater than that modelled without the rainwater
tanks in place.
8.4 Waterway Stability
The waterway stability objective is met as the peak flows from the site have been reduced to existing case
levels for all ARI events up to and including the 100 year ARI event (refer Flood Study, Cardno, October
2012). This is due to the attenuation being provided by the proposed road crossings and detention basins.
The attenuation provided by the rainwater tanks and bio-retention basins was not included in this analysis.
Therefore the attenuation, particularly for minor events, will likely be greater than reported.
Bio-retention basins and rainwater tanks provide some attenuation of minor peak flows, typically up to the 2
year ARI event. The outlets of the bio-retention basins and gardens should have adequate scour protection
installed to prevent downstream erosion.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 22
Page 28
Noosa on Weyba
Stormwater Management Plan
~,.., Cardno@
9 Conclusion
Due to the ecologically sensitive location of the site, appropriate stormwater quality treatment is of the
upmost importance. For this reason the best available stormwater treatment measures have been proposed.
The proposed WSUD strategy for the site includes:
> Community education.
> Reducing potable water demand through use of water efficient devices and appliances
> Large rainwater tanks (around twice the QDC size requirements) connected to all practically available
roof area to maximise rainwater harvesting, reduce stormwater flows and reduce potable water demand.
> Bio-retention basins.
> Bio-retention gardens within the road reserve.
> Bio-retention tree pits within the road reserve.
> Bio-retention swales.
> Vegetated swales.
> Litter baskets.
> Buffer areas.
> Revegetation and rehabilitation of Lake Weyba buffer area.
> Rehabilitation of Keyser Creek waterway corridor.
> Reticulated water and sewerage, which will minimise the risk of contaminants from effluent being
discharged into Lake Weyba.
The proposed development will maximise the use of alternative sources of water. The proposed rainwater
tanks will be able to provide around 82 percent of the non-potable water demand and around 53 percent of
the total water demand of the site.
MUSIC modelling has shown that the water quality objectives and frequent flow objectives for the site can be
met. The reduction in pollutant loads being achieved by the proposed stormwater treatment train is
significantly greater than the reduction typically provided by standard residential developments.
The resultant pollutant loads from developed areas of the site are less than those resulting from the existing
rural use of these areas. Other areas of the site will be converted from rural uses to park areas and densely
vegetated areas will become designated conservation areas, and rehabilitated as required. Therefore the
overall stormwater quality being discharged from the site will likely be improved, and there will not be an
impact on the water quality of Lake Weyba.
Regular water quality monitoring will be used to ensure that stormwater being discharged from site is of
suitable quality.
Northbrook Corporation Pty Ltd Version 2 29 November 2012
SMP_v2.docx Commercial in Confidence Page 23
Page 29
Noosa on Weyba
Figure 1 Site Location
Figure 2 Sub-catchments
Figure 3 Proposed Stormwater Treatment
-Areas A to G
Figure 4 Proposed Stormwater Treatment
-
Areas H and I
Figure 5 Proposed Stormwater Treatment
-
Areas J to L
<.J., Cardno@
Shaping the Future
Page 30
NOOSA ON WEYBA
STORMWATER MANAGEMENT PLAN
<._Dc:ardn
~
~
LEGEND
c:J Site boundary
NP
NP
Stradbroke Island
h
Aerial image soreed from GoogleEarth
250 250 500 750 1000 1250m
--- I 125,000
@ Cardno (Old)Pty Lid All Rights Reserved 2012 Scale 1 :25,000 (A3)
Copyright in the whole and every part olthis drawing belongslo Cardno (Old)Ply LId and
may not be used, sold, transferred, copied or reproduced in whole orin partin any manneror
form or on any media, to any person olher than by agreemenlwilh Cardno (Old)Ply Ltd. FIGURE 1
This document is produced by Cardno (Old) Ply LId solely forthe benefit of and useby
the client in accordance wilh the terms ofllle relainer.Cardno (Qld)Pty LId doesno\
and shall not assume any responSibility orliabilily whalsoeverloany thrd party arising auto! SITE LOCATION
any use orreliance by Il’Iird party on tl’lecontenloftl’lisdocumenl.
Rev: 0 I Drawn: J.M.I Checked: N.G,I Date: 23/10/2012 Project No.: 5101/19/3
PRINT DATE: 240dober, 2012 11:00am
Northbrook Corporation Pty Ltd
-
CAD FILE: 0:\5101-19-03\Figures\R3vl SMP\Figure I - Site lo<ation.dwg
XREF’s: OC08; site
Page 31
NOOSA ON WEYBA
STORMWATER MANAGEMENT PLAN
<._Dc:ardn
LEGEND
c:J Site boundary
Sub-catchment boundary
1m contour /)
75 75 150 225 300 375m
... 17500
@ Cardno (Old)Pty Lid All Rights Reserved 2012 Scale 1 :7,500 (A3)
Copyright in the whole and every part olthis drawing belongslo Cardno (Old)Ply LId and
may not be used, sold, transferred, copied or reproduced in whole orin partin any manneror
form or on any media, to any person olher than by agreemenlwilh Cardno (Old)Ply Ltd. FIGURE 2
This document is produced by Cardno (Old) Ply LId solely forthe benefit of and useby
the client in accordance wilh the terms of the relainer.Cardno (Old)Ply LId does not
and shall not assume any responSibility orliabilily whalsoeverloany thrd party arising auto! SUB-CATCHMENTS
any use orreliance by Il’Iird party on thecontentofthisdocument.
Rev: 0 I Drawn: J.M.I Checked: N.G.I Date: 9/10/2012 Project No.: 5101/19/3
PRINT DATE: 26 November, 2012 5:10pm
North broo k Co rp Pty Ltd and J& K Holm ann
-
CAD FILE: O:\5101-19-03\Figures\R3v2 SMP\Figure 2 - Sub-catchmenls. wg
XREF’s: 0(08; dev_plan; site; WQ_c<ltchments_2410
Page 32
NOOSA ON WEYBA
STORMWATER MANAGEMENT PLAN
<._Dc:ardn
~
~
LEGEND
c=J Site boundary
Sub-catchment boundary
<Q> Detention/bio-retention basin
<Q> Bio-retention basin
- Blo-retentlon Swale
-
Vegetated Swale
Rehabilitated
DJWaterway
Co rrid 0r
40 40 80 120 160 200m
--- 14000
@ Cardno (Old)Pty Lid All Rights Reserved 2012 Scale 1 :4,000 (A3)
Copyright in the whole and every part olthis drawing tlelongslo Cardno (Old)Ply LId and
may not be used, sold, transferred, copied or reproduced in whole orin partin any manneror
form or on any media, to any person other than by agreemenlwilh Cardno (Old)Ply Ltd. FIGURE 3
This document is produced by Cardno (Old) Ply LId solelyforthebenefitofand useby
the client in accordance with the terms of the relainer.Cardno (Qld)Pty LId doesnol
and shall not assume any responSibility orliabilily whalsoeverloany thrd party arising auto! PROPOSED S TOR M W ATE R T REA T MEN T -
ARE A S A to G
any use orreliance by third party on thecontentofthisdocument.
Rev: 0 I Drawn: J.M.I Checked: N.G.I Date: 26/11/2012 Project No.: 5101/19/3
PRINT DATE: 26 November. 2012 4:59pm
North broo k Co rp Pty Ltd and J& K Holm ann -
CAD FILE: 0:\5101-19-03\Figures\R3v2 SMP\Figure 3 -
Proposed rreatment A to G.dwrg
XREF.s: 0(08; dev_plan; site; WQ_catchments_0910; WU_devices_0910; WQ_catchments_2410
Page 33
NOOSA ON WEYBA
STORMWATER MANAGEMENT PLAN
<._DCardn
/
~
~
"J
o \)
~
~
r
o
LEGEND
17
c=J Site boundary
Sub-catchment boundary
<Q> Detention/bio-retention basin
<Q> Bio-retention basin
Blo-retentlon Swale
-
Vegetated Swale
40 80 120 160 200m
I 14000
@ Cardno (Old)Pty Lid All Rights Reserved 2012 Scale 1 :4,000 (A3)
Copyright in the whole and every part olthis drawing tlelongslo Cardno (Old)Ply LId and
may not be used, sold, transferred, copied or reproduced in whole orin partin any manneror
form or on any media, to any person olher than by agreemenlwilh Cardno (Old)Ply Ltd. FIGURE 4
This document is produced by Cardno (Old) Ply LId solelyforthebenefitofand useby
the client in accordance with the terms of the relainer.Cardno (Old)Ply LId does not
and shall not assume any responSibility orliabilily whalsoeverloany thrd party arising auto! PROPOSED STORMWATER TREATMENT -AREAS H and I
any use orreliance by third party on Iheconlenloflhisdocument.
Rev: 0 I Drawn: J.M.I Checked: N.G.I Date: 26/11/2012 Project No.: 5101/19/3
PRINT DATE: 26 November, 2012 5:02pm
North broo k Co rp Pty Ltd and J& K Holm ann -
CAD FILE: O:\5101-19-03\Figures\R3v2 SMP\Figure l. -
Proposed Treatment Hand Ldlo’g
XREF’s: 0(08; dev_plan; site; WQ_catchments_0910; WU_devices_0910; WQ_c<ltchments_2410
Page 34
NOOSA ON WEYBA
STORMWATER MANAGEMENT PLAN
<._Dc:ardn
~
o
~
~
/JD <)
C>
9 o
LEGEND
c=J Site boundary
Sub-catchment boundary
<Q> Detention/bio-retention basin
<Q> Bio-retention basin
Blo-retentlon Swale
-
Vegetated Swale
()
40 40 80 120 160 200m
--- I 14000
@ Cardno (Old)Pty Lid All Rights Reserved 2012 Scale 1 :4,000 (A3)
Copyright in the whole and every part olthis drawing tlelongslo Cardno (Old)Ply LId and
may not be used, sold, transferred, copied or reproduced in whole orin partin any manneror
form or on any media, to any person olher than by agreemenlwilh Cardno (Old)Ply Ltd. FIGURE 5
This document is produced by Cardno (Old) Ply LId solely forthe benefit of and useby
the client in accordance with the terms of the relainer.Cardno (Old)Ply Ltd does nol
and shall not assume any responSibility orliabilily whatsoevertoany thrd party arising auto! PROPOSED S TOR M W ATE R T REA T MEN T -
ARE AS J to L
any use orreliance by third party on Iheconlenloflhisdocument.
Rev: 0 I Drawn: J.M.I Checked: N.G.I Date: 26/11/2012 Project No.: 5101/19/3
PRINT DATE: 26 November, 2012 5:04pm
North broo k Co rp Pty Ltd and J& K Holm ann -
CAD FILE: O:\5101-19-03\Figures\R3v2 SMP\Figure 5 -
Propo!;ed rreatment J to L.dYlg
XREF’s: 0(08; dev_plan; site; WQ_catchments_0910; WU_devices_0910; WQ_catchments_2410
Page 35
Noosa on Weyba
~,..,Carcln
Shaping the Future
@
[OCR of page images]
Noosa on Weyba
APPENDIX
Concept Masterplan
cJy Cardnoa
Shaping the Future
Page 36
I I
, ’
,.
.,.
, I
I I
I r
I
.;.
\’
,
I
.
L__-...._..,
~ L \
I
\
( \
-t
Legend
~ [===:J Noosa on Weyba Site Boundary
-::::::I Open Space Conservation Zone
l
,~
_ Precinct 1
r Precinct 2
[c:: Precinct 3
’~ rf Ii . Precinct 4
-
NOOSA ON WEYBA -
~/ ~~ ..
NORTH BROOK CORP PTY LTO AND J & K HOFMANN
I1~00/Sa
.PRECINCT PLAN
on weyba -
Design
-
MlDesignPtyltd 0 SO.O 100 architecture I master planning I urban design I interior design
ACN100492304 ~
ABN 89159048228
Plot Date: 23il1/2()12
"V~ SCALE-1:10000@A3 APPROVED FOR ISSUE:_ 23/11/2012@ ML Design Ply. Ltd. JOB NO: NORT0001 MP-006-[D] -
.
L File Path: P:INORTOOO1_Lake Weyba’B_Oocumentation\81~Production\81_Drawings\ArchiCAD\Layoots\NORTOOO1_Layoul.pIn
_j
Page 37
Noosa on Weyba
CJ,.., Carclno@
Shaping the Future
[OCR of page images]
Noosa on Weyba
APPENDIX
Water Quality Monitoring Of Lake Weyba
cJy Cardno’
Shaping the Future
Page 38
Beach
Legend MAROOCHY RIVER
CATCHMENT
’\._ Catchment border
’-, Sub-catchment border
.
State fo rest
Protected areas
.
.
Urban areas
o Estuarine/marine sites
o Freshwater sites
Page 39
<..J") Carclno
Table B 1 Healthy Waterways lake Weyba Water Quality Monitoring 2002 -
2012
Susp- Total
Choloro- Total Oxidised Ammonia Organic Secchi
ended Phos- FRP DO
Turbidity phyll a Nitrogen N N N pH Depth
Solids phorous (l1gfL) (%sat)
(l1gfL) (l1gfL) (l1gfL) (l1gfL) (l1gfL) (m)
(mgfL) (l1gfL)
Lake Weyba 1624
Max 78.0 n/a 6.7 1789.2 367.8 546.7 1780.3 43.6 9.9 158.0 8.5 1.5
80%) 14.0 n/a 2.3 487.1 9.9 60.0 381.7 16.9 1.9 109.1 8.2 1.0
50%) 6.0 n/a 1.3 328.0 2.0 23.4 299.2 10.9 1.9 99.9 8.0 0.2
20010 2.5 n/a 0.8 278.3 2.0 8.9 241.5 7.9 1.9 91.9 7.8 0.2
Min 0.0 n/a 0.3 149.1 2.0 2.0 70.6 4.0 1.9 75.4 6.2 0.2
Lake Weyba 1625
Max 277.0 n/a 9.5 934.4 328.0 516.9 884.7 228.2 178.6 152.1 8.5 1.0
80010 20.0 n/a 3.2 497.0 10.9 83.5 403.6 17.9 1.9 106.6 8.2 1.0
50010 11.0 n/a 2.0 367.8 2.0 15.9 342.0 11.9 1.9 98.8 8.0 0.2
20010 5.0 n/a 0.9 278.3 2.0 4.0 259.5 7.9 1.9 91.4 7.8 0.2
Min 1.0 n/a 0.3 198.8 2.0 2.0 178.9 4.0 1.9 68.5 6.5 0.2
Lake Weyba 1626
Max 90.0 n/a 9.2 994.0 526.8 566.6 781.3 327.4 267.8 139.8 8.6 1.5
80010 22.0 n/a 3.1 516.9 9.9 119.3 384.7 16.9 1.9 106.8 8.2 1.0
50010 12.0 n/a 1.9 367.8 2.0 11.9 325.1 10.9 1.9 97.5 8.0 0.2
20010 5.0 n/a 1.0 288.3 2.0 4.0 264.4 8.9 1.9 92.0 7.8 0.2
Min 0.0 n/a 0.1 198.8 2.0 2.0 7.0 4.0 1.9 44.2 6.7 0.2
Weyba Creek 1611 I
Max 58.0 n/a 6.0 586.5 39.8 159.0 971.1 66.5 4.0 130.7 8.4 3.5
80010 10.0 n/a 2.4 347.9 8.7 36.8 301.2 16.9 1.9 103.9 8.2 1.5
50010 6.0 n/a 1.4 278.3 4.0 17.4 242.5 12.4 1.9 96.2 8.1 0.2
20010 3.0 n/a 0.9 208.7 2.0 9.9 187.9 8.9 1.9 89.6 7.9 0.2
Min 1.0 n/a 0.4 139.2 1.8 3.0 129.2 4.0 1.6 65.1 6.3 0.2
North brook Corporation Pty Ltd 29 November 2012
0:\51 01-19-03\wp\R3v2 SMP\Appendices\AppB_2 WQ Monitoring Summary.docx Page 1
[OCR of page images]
Cc Cardno
Table B1 Healthy Waterways Lake Weyba Water Quality Monitoring 2002 - 2012
Susp- 7 : : Total A
rurbicty | 289° | “Shyla | nitrogen | WN | N | ww | Phos | FRE | DO | oy | Depth
(mgt) | #9) | wot) | wot) | wot) | wot) | Poor (m)
Lake Weyba 1624
Max 78.0 n/a 6.7 1789.2 367.8 546.7 1780.3 43.6 9.9 158.0 8.5 1.5
80% 14.0 n/a a3 487.1 9.9 60.0 381.7 16.9 1.9 109.1 8.2 1.0
50% 6.0 n/a 1.3 328.0 24 23.4 299.2 10.9 1.9 99.9 8.0 o2
20% 2.5 n/a 0.8 278.3 2.0 8.9 241.5 7.9 1.9 91.9 7.8 0.2
Min 0.0 n/a 0.3 149.1 2.0 2.0 70.6 4.0 1.9 75.4 6.2 0.2
Lake Weyba 1625
Max 277.0 n/a 9.5 934.4 328.0 516.9 884.7 228.2 178.6 152.1 8.5 1.0
80% 20.0 n/a 22 497.0 10.9 m4 403.6 17.9 1.9 106.6 8.2 1.6
50% 11.0 n/a 2.0 367.8 2.0 15.9 342.0 11.9 14 98.8 8.0 0.2
20% 5.0 n/a 0.9 278.3 2.0 4.0 259.5 7.9 1.9 91.4 7.8 0.2
Min 1.0 n/a 0.3 198.8 2.0 2.0 178.9 4.0 1.9 68.5 6.5 0.2
Lake Weyba 1626
Max 90.0 n/a 9.2 994.0 526.8 566.6 781.3 327.4 267.8 139.8 8.6 1.5
80% 22.0 n/a 3.1 516.9 9.9 119.3 384.7 16.9 1.9 106.8 8.2 1.0
50% 12.0 n/a 1.9 367.8 2.0 11.9 325.1 10.9 1.9 97.5 8.0 0.2
20% 5.0 n/a 1.0 288.3 2.0 4.0 264.4 8.9 1.9 92.0 7.8 0.2
Min 0.0 n/a 0.1 198.8 2.0 2.0 7.0 4.0 1.9 44.2 6.7 0.2
Weyba Creek 1611
Max 58.0 n/a 6.0 586.5 39.8 159.0 971.1 66.5 4.0 130.7 8.4 3.5
80% 10.0 n/a 2.4 347.9 8.7 36.8 301.2 16.9 1.9 103.9 8.2 1.5
50% 6.0 n/a 1.4 278.3 4.0 17.4 242.5 12.4 1.9 96.2 8.1 0.2
20% 3.0 n/a 0.9 208.7 2.0 9.9 187.9 8.9 1.9 89.6 7.9 0.2
Min 1.0 n/a 0.4 139.2 1.8 3.0 129.2 4.0 1.6 65.1 6.3 0.2
Northbrook Corporation Pty Ltd 29 November 2012
©:\5101-19-03\wp\R3v2 SMP\Appendices\AppB_2 WQ Monitoring Summary.docx Page 1
Page 40
<..J") Carclno
Susp- Total
Choloro- Total Oxidised Ammonia Organic Secchi
ended Phos- FRP DO
Turbidity phyll a Nitrogen N N N pH Depth
Solids phorous (l1gfL) (%sat)
(l1gfL) (l1gfL) (l1gfL) (l1gfL) (l1gfL) (m)
(mgfL) (l1gfL)
Average of 1624, 1625, 1626 and 1611
Max 125.8 n/a 7.8 1076.0 315.6 447.3 1104.4 166.4 115.1 145.2 8.5 1.9
80%) 16.5 n/a 2.7 462.2 9.9 74.9 367.8 17.1 1.9 106.6 8.2 1.1
50%) 8.8 n/a 1.7 335.5 2.5 17.1 302.2 11.5 1.9 98.1 8.0 0.2
20010 3.9 n/a 0.9 263.4 2.0 6.7 238.3 8.4 1.9 91.2 7.8 0.2
Min 0.5 n/a 0.3 171.5 1.9 2.2 96.4 4.0 1.8 63.3 6.4 0.2
Water Quality Objective
80010 8.0 20.0 2.5 380.0 15.0 32.0 320.0 16.0 2.0 105.0 8.3 2.0
50010 5.0 20.0 1.5 240.0 5.0 15.0 210.0 13.0 2.0 95.0 8.2 1.6
20010 2.0 20.0 0.8 150.0 2.0 7.0 130.0 10.0 2.0 85.0 8.0 1.1
# Sourced from Healthy Waterways Ecosystem Health Montformg Program
# Bolded average values do not meet WQO
# If recorded data was at the test threshold assumed to be value equal to test threshold
North brook Corporation Pty Ltd 29 November 2012
0:\51 01-19-03\wp\R3v2 SMP\Appendices\AppB_2 WQ Monitoring Summary.docx Page 2
Page 41
Noosa on Weyba
’-f)Cardn
Shaping the Future
@
[OCR of page images]
Noosa on Weyba
APPENDIX
Community Information Leaflet
cy Cardna
Shaping the Future
Page 42
Stormwater Quality
nFb sa
and the Community on weyba
Working at the continual im-
provement of stormwater quality
Clean
will help to protect the natural
environment and ensure that .
Stormwater
Noosa on Weyba remains a
beautiful place in which to live.
.
Strate
~
f"-
I_ ..._,
Using the helpful and practical
j
tips provided, every member of "C
the community can make a sig- ....
What is already being done and
nificant contribution to the on- ,,_
I’ what you can do to help.
going best practice stormwater r’( ~
~
quality treatment at Noosa on
Weyba.
<..r., CSh ~~h dF no
apmg t e uture
Page 43
What is being provided?
nlo sa The stormwater quality treatment train employs a range of
innovative measures to ensure the best results. These in-
What can You do?
Eliminating the source of pollutants is the most effec-
on weyba clude: tive method of stormwater quality management.
Nooso on Weybo & You "’. 1 0 kilolitre rainwater tanks for each residential lot. These are some easy steps that you can take to en-
~/,
..., (This is more than twice the requirement of Queens- sure you are contributing to the sustainable nature of
Noosa on Weyba:
~~. land Development Code)
Noosa on Weyba is an environmentally friendly residen- .\ ~ Bio-retention street trees and bio-retention gardens
-
. Minimise use of chemical cleaning products,
~
tial and retirement living development. It is situated on ~, .1 incorporated into the road reserve particularly outdoors.
Lake Weyba which is a Fish Habitat Reserve and sur-
’. Bio-retention basins
rounded by Noosa National Park. Due to the close \ . Service motor vehicles regularly and look for
proximity of these natural ecosystems, it is important to ,
’. Vegetated bio-retention swales signs of leaking oil. brake fluid or other chemi-
’_.../
ensure that everything possible is being done to im- cals
.1 Litter baskets
prove the ecological footprint of the community.
As part of the sus-
"._,.. f
..,
Natural wetland
. Wash motor vehicles on lawn or in car wash-
I.....
/~ areas
ing bays.
tainable design of ’rt
).
~
J " -
Noosa on Weyba, ~i’1_/ ;- Buffers to envi- . Minimise use of fertilizers and avoid applying
best practice water
ronmentally pesticides to plants and gardens, especially if
sensitive urban de- sensitive areas rain is expected.
sign (WSUD)
These state of the art storm- A bio-retention garden
measures have
.
Sweep up and compost garden waste.
water quality improvement
been adopted. This Dumping of green waste along creeks or
devices work as an integrated, sustainable system in order
is to help ensure down the drain spreads weeds and promotes
to produce high quality stormwater in compliance with the
that runoff is treated algal growth.
South East Queensland Healthy Waterways Guidelines.
Noosa on Weyba is an
to the best possible
. Ensure all house-
quality before it is ecologically sensitive area Bio-retention systems
hold rubbish is
discharged from site. Bio-retention systems are particularly efficient in removing
properly disposed
Even with such efficient stormwater quality treatment in pollution from stormwater run-off. Water ponds over the
of.
place further improvements can be made by eliminat- vegetated surface and slowly infiltrates through the under-
ing the sources of pollution. Individuals throughout the lying filter media. The plants and filter media are specifical- . Never dispose of
community have an important role in improving storm- ly chosen to ensure high chemicals down
levels of nutrient remov- the stormwater
water quality and general
al. Sediments and litter drain.
environmental health.
There are a number of
remain in the forebay
. Plant native, ground
Waterwise gardens
area for easy disposal.
simple and easy ways to
Treated stormwater is covering plant spe- prevent soil erosion
ensure that each house-
then discharged down- cies and mulch to
hold can contribute to
stream. Any excess prevent soil erosion and conserve water
protecting their local envi-
litter will be captured by
ronment.
the litter baskets.
. Dispose of pet droppings by sealing them in a
Sweeping up leaves is one easy bag and depositing into a waste bin
The Bio-retention process
way to improve storm water quality
Page 44
Noosa on Weyba
<..f)Cardn
Shaping the Future
@
[OCR of page images]
Noosa on Weyba
APPENDIX
Underground Rainwater Tank Example
CcJ> Cardna
Shaping the Future
Page 45
TAP
OUTSIDE
~
RE-USE we
WATER
PUMPED ~
Concret FROM
LAUNDRY
Lb-U~ For
on
AWC
Base Locking
Course Ring
of
with
Blue min. Cut-of Pump Conduit
Submersil
DeHv’) ~
(I)""0 -g.
~ ~~
w.actionksmu ~Jif
technial
enquires
call
1800
and to 066
Crushed 20 m Float AWC Electrial Pipe 587
switch Low-lev
J
Metaldepth, 1"
~ Check d SPLIT SPLIT
Delivry by
pipe
olted max./15 No
Visble(Optional autom ic
Split JM MASTER
Screw Trap 150m (e.g house Can First
Pipes Testable Mains
System
I
System MASTER
Garden and Flush Water Control
be
ct Drawn
Tank T a n k l o c a t e d D o u b l e Box Twin-
Bed) Divert Check diverson with
BM
Tank
anywher Leaf&
Valve)
50m Openig with One-way suitable Straine
CD
2008 Instal
AWe 50 lt 45 0lt 30 lt .t_: ACTION
interco betw n
or if to
Flap
required Surface Inspectio Valve TANK NTS Scale
.L.
-
REV
pipe
Pipe
INDUSTRIE She t 3017/08
1
of
1
Date
Overflow 10m P/L _)
W
Page 46
Noosa on Weyba
~,..,Carclno@
Shaping the Future
[OCR of page images]
Noosa on Weyba
APPENDIX
MUSIC Model Layouts
cy Cardna
Shaping the Future
Page 47
6~a
[iittI"’-Tr’ Pre~_Rd Ij
m~I SwalE-I
PreB6 1
1
T
V
iPreB5_Rd ’;/~
;:!~iI /~ PreBS_io ~l-1’
1
~
iPreS
I i/V.1 TO’ Rainwter
1
Tanir
V
V"
V
V
/’"
~
Gar ens ~
./7 ~/
Ii-pret:l4
_
Bio /
-/I
/1
17./,
1- ~ ~nw.terT’1 PreB4
Ii
/
/
\
/
\
/
~V,. /:..
. ,"_ iU~
\
\
I
-PreB3_G’
{i iiJPreBJ_io ._ . PreB3
S\’Iale ’\
-
\
,\ ’ . . . ~ ’ , ’
~~
"~
~,
’reB3_R
[j Yr n_:.IT I
1\.,
"
,
.....
,
" r-. . ._
S-bJi: \’Iale~ N~
.....
PreB2_io _ PreB2 --...
r-....
i""’-.
K
Tank
L
1Qwaler
Ra
~
iB o~
It
"ank
=frgRainwter
3 co CD ~ "’C ..,CD(") :::l (").... [I]
0 0 ..... 0ru 0:::J :2 . . . . c.. I’-) <D Zo<CD 30’"
oz ~;: l.O: J’-";-"0’" 8~:f()"S-o(. )"’0 :5:~
:.;. c;; ;:0 ~ C/) "’U :
:g
~’<9:r
()CD $;"0"0 m :5:cC/)(53oc.CD (Jj C.o()><
-u~ wI’(00
-) CD. .lo1’-l)o.
[OCR of page images]
Cc Cardno
g
ie
3
=
&
e
PreB3_Bio
PreB3_Swale
Rainwater Tank
Rainwater Tank
Rainwater Tank
Image 1 Precinct B
Northbrook Corporation Pty Ltd
29 November 2012
©:\5101-19-03\wp\R3v2 SMP\Appendices\App E MUSIC models.docx
Page 1
Page 48
<..J’) Carclno
1 j I 1 I
I~ I~ ~ ~-
~
-I--r---Pr’eC 1 ,R-f--PreC1 r- preC1_Rd_r-preC1 CQmm-- _
~ V
\ /
,
/
\ v
\ /
~ /
If
\
I:’~!I!
rijl
~ IltiJ
-r-
Rainwater Tank
pr~BiOl
1\ /
\ V
\
/
~ /
\ 1/
\ /
~ /
111’-1
_I
R,ec-eivingl Node
I r I
I I I
Image 2 Precinct C
I I _L._ 1 I 1
. I~ l4tl
.~ ~ ~ -
f--PreD1_R-_p r<eD1 G Pf’~1_Rd Pr _R.ii Pr’eD3_Rd -
_,
\
\ ~I’~
\ ID
~
\ PreD2_Bi!l
\
\
Ir_ ~ ,.
~I’~
~
R.a irtw ater Tan k
1id ~ lilt
r--r--
-
preD1_BiO<\ Sw,ale i
Litter B.asket
"
\ V
\ V
\ /
\ /
"\ ~
\. /
\ /V
r\.
’\ V
W
a
Reoeiving No.de
I I I
Image 3 Precinct D
North brook Corporation Pty Ltd 29 Novem ber 2012
O:\5101-19-03\wp\R3v2 SMP\Appendices\App E MUSIC models.docx Page 2
Page 49
<..J’) Carclno
Image 4 Precinct D
Image 5 Precinct E
North brook Corporation Pty Ltd 29 Novem ber 2012
O:\5101-19-03\wp\R3v2 SMP\Appendices\App E MUSIC models.docx Page 3
Page 50
<..J’) Carclno
Image 6 Precinct F
Image 7 Precinct G
North brook Corporation Pty Ltd 29 Novem ber 2012
O:\5101-19-03\wp\R3v2 SMP\Appendices\App E MUSIC models.docx Page 4
Page 51
6~a
3 CO CD CO "’C ..,CD(") :::l (").... :::I:
0 0 ..... 0ru 0:::J :2 . . . . c.. I’V <D Zo<m 30’" .....
oz ~;: l.O: J’-";-"0’" 8~:f()"S-o(. )"’0 :5:~
:.;. c;; ;:0 ~ C/) "’U :
:g
~’<9:r
()CD $;"0"0 m :5:cC/)(53oc.CD (Jj C.o()><
" Om (OI’V mO c:.n~
Q)
[OCR of page images]
3pon Suazooy
‘OF 3. on
aIBAS PEOY IG PHO Yue, Jaye Aue yur, sayenuiey EMS Hed | vhs solemuey AIRS" Led | yURy JayemuIEY
8 8 eB 8
PuSH@ld = i
ZHedd |W HA PY LHAd | OS LHaig Y Hed
Page 5
29 November 2012
Precinct H
Image 8
0:\5101-19-03\wp\R3v2 SMP\Appendices\App E MUSIC models.docx
Northbrook Corporation Pty Ltd
Page 52
6~a
Prel5_Rd lW
~
prel5_~
PreIS_R nwaterTn ~
~Prel4
Rd
-1
aR~ I
G
c: : F
~
~Prel4
~
~Prel4_R
P’jl3_Rd
~BO JJ I
~ Nod
Tan
~Recivng I
I
tGlRainwter
\
~~ "
iPrel2_Bi~ ffi
Tanl(
gwater
Ra M
~
1*
3 CO CD <D "’C .,CD(") :::l (")r+
0 0 ..... 0ru 0:::J :2 . . . . c.. I’V <D Zo<m 30’" .....
oz ~;: l.O: J’-";-"0’" 8~:f()"S-o(. )"’0 :5:~
:.;. c;; ;:0 ~ C/) "’U :
:g ()CD $;
~’<9:r
"0"0 m :5:cC/)(53oc.CD (Jj C.o()><
" Om (OI’V mO (J)~
Q)
[OCR of page images]
Cc Cardno
ie
3
&
@
—Rainwater Te
Image 9 Precinct |
Northbrook Corporation Pty Ltd 29 November 2012
©:\5101-19-03\wp\R3v2 SMP\Appendices\App E MUSIC models.docx Page 6
Page 53
<..J’) Carclno
Image 10 Precinct K
Image 11 Precinct L
North brook Corporation Pty Ltd 29 Novem ber 2012
O:\5101-19-03\wp\R3v2 SMP\Appendices\App E MUSIC models.docx Page 7
Page 54
Noosa on Weyba
~,..,Carclno@
Shaping the Future
[OCR of page images]
Noosa on Weyba
APPENDIX
Maintenance Plan
cy Cardno
Shaping the Future
Page 55
CJ~Cardno
INTRODUCTION
The water quality treatment proposed for the Noosa on Weyba development includes a number of bio-
retention basins and gardens. This appendix provides an overview of their maintenance requirements.
The litter baskets installed on the field inlets will also need regular maintenance. An example of a
manufacturer’s maintenance requirements for litter baskets is attached.
Bio-retention Basin and Gardens Maintenance Requirements
Inspection Frequency
Routine inspections should be undertaken on the bio-retention basins and gardens after every
significant rainfall event (30mm of rainfall in a 24 hour period) or on a three (3)monthly basis within
the first twelve (12) months and on a six (6) monthly basis thereafter. The requirements of the
inspection for the bio-retention basins shall include the following:
. Check for build-up of sediment at pipe inlet structures, remove as required;
. Check all concrete structures for damage and deterioration;
. Check for the build-up of vegetation matter on the bed surface and removal of vegetation
matter to ensure minimal blockage to media; and
. Check achieved flow rate through the media is maintained in accordance with the design
requirements.
Maintenance Frequency
The bio-retention basins and gardens treat stormwater runoff through the principles of sedimentation
and filtration. The systems are subject to deposition of sediment that is filtered through the media.
Any accumulated litter including leaves and other debris shall be removed for the surface of the filter
surface on an as required basis. Inspection and maintenance of the litter baskets should also be
conducted at this stage. As noted above, the basins are to be inspected after every significant rainfall
event (30mm of rainfall in a 24 hour period) or on a three (3)monthly basis within the first twelve (12)
months and on a six (6)monthly basis thereafter.
Data Collectionl Storage Requirements
Inspection records will be required for comparison of the performance of the system. In order to assist
this process it is proposed that the Bio-retention Basin Maintenance Checklist prepared by Healthy
Waterways be adopted for the site. Copies of the completed checklist are to be forwarded to the
Cardno (Old)Pty Ltd (or other consultant nominated by the Principal) and to be provided to SCRC at
the expiry of the maintenance period.
Detailed Maintenance Procedure
Vegetation plays a key role in maintaining the porosity of the filter media of a bio-retention system in
and a strong healthy growth of vegetation is critical to its performance. Therefore the most intensive
period of maintenance is during the plant establishment period (i.e. first two years) when weed
removal and replanting may be required.
It is also the time when high sediment loads may impact on plant growth and infiltration rates. For this
reason, if they are not being used as temporary sedimentation basins, the bio-retention systems are
initially to be turfed, with geotextile fabric protecting the filter media underneath. Vegetation can be
introduced when construction has been completed on an appropriate percentage of the catchment
draining to each bio-retention system. If initial turfing of the bio-retention systems is not considered
practicable, then it is advised that the majority of the vegetation be screened off during the plant
establishment phase. This can be done by installing temporary sedimentation fences or similar
devices to separate the inlet and outlet zone from the remainder of the basin. The inlets and outlets
should be located close together so that this can easily be managed.
Northbrook Corporation Pty Ud 29 November 2012
O:15101-19-03IwpIR3v2 SMPlAppendiceslApp F -
Maintenance Plan.docx Page 1
Page 56
CJ~Cardno
Inflow systems and overflow systems require careful monitoring, as these can be prone to scour and
litter build up. Debris can block inlets or outlets and can be unsightly.
The filter media will be inspected for sediment deposition of the bed of the bio-retention basins and
removed as required.
Inspect for the accumulation of an impermeable layer (such as oily or clayey sediment) that may have
formed on the surface of the filter media. A symptom may be that water remains ponded in the bio-
retention basin for more than a few hours after a rain event. Repair minor accumulations by raking
away any mulch on the surface and scarifying the surface of the filter media between plants. Any leaf
litter should be removed to help maintain the surface porosity of the filter media.
Ensure the perforated pipes are not blocked to prevent filter media and plants from becoming
waterlogged. A small steady clear flow of water may be observed discharging from the perforated
pipe at its connection into the downstream pit some hours after rainfall. Note that smaller rainfall
events after dry weather may be completely absorbed by the filter media and not result in flow. Sub-
soil drainage lines are to be flushed with clean water as required to remove and blockage.
Vegetation Management
Watering
Regular watering of the bio-retention system vegetation is essential for successful establishment and
healthy growth. The frequency of watering to achieve successful establishment will depend upon
rainfall, maturity of planting stock and the water holding capacity of the soil.
The following watering program should be adequate following the installation of vegetation:
. Week 1-2 3 visits/week
. Week 3-6 2 visits/week
. Week 7-12 1 visit/week
After the first three month period, watering may still be required, particularly during the first winter (dry
period). Irrigation shall be undertaken in consultation with the Landscape Architect.
Weed Control and Mulching
Conventional surface mulching of the bio-retention systems with organic material like tanbark, should
not be undertaken. Most organic mulch floats and runoff typically causes this material to be washed
away with a risk of blocking drains. Mulch that is not likely to float should be adopted.
If weeds are observed within the bio-retention system they shall be removed. Weeding will generally
involve manual removal of the species.
Vegetation planting densities are to be in accordance with the Landscape Architect’s design. Where
necessary a biodegradable erosion mat can be applied to the basin batters to help combat weed
invasion and reduce the labour intensive maintenance requirements for weed removal.
Herbicides are not recommended as a means of weed control. If required, however, their application
is to be managed to avoid unintentional destruction of other vegetation or the introduction of chemicals
that may contaminate the stormwater runoff.
Where necessary, in areas that have been extensively weeded, the bio-retention system shall be
replanted with similar planting densities using suitable native species in accordance with the
Landscape Architects design.
Inspection of the existing vegetation is to take place and any dead or diseased vegetation shall be
removed and replaced with suitable native species in accordance with the Landscape Architects
design.
Northbrook Corporation Pty Ud 29 November 2012
O:15101-19-03IwpIR3v2 SMPlAppendiceslApp F -
Maintenance Plan.docx Page 2
Page 57
<..J’) Carclno
The removal of plants, dead or diseased vegetation or weeds shall be disposed offsite at an
appropriate waste management facility.
Equipment Needs
The equipment required to undertake regular maintenance to the bioretention systems will be standard
hand held landscaping tools. No specific mechanical equipment is expected to be required for the
maintenance of the basins unless resetting is required.
Occupational Health and Safety
The maintenance activities are to be undertaken in accordance with all current occupational and
workplace health and safety legislation, regulations, codes of practice or manufacturers guidelines.
For maintenance access, pathways have been provided for in the design of the bio-retention basins.
As noted above no mechanical equipment is required unless resetting is required. The batter grades
are considered to be acceptable and do not pose an occupational health and safety issue given proper
training to maintenance personnel.
The application of pesticides or herbicides in response to any weed outbreak, which cannot be
controlled via manual removal, is to be undertaken by maintenance personnel in accordance with
manufacturer’s guidelines in consultation with the Landscape Architect. Protective measures are to be
implemented so as to minimise exposure to personnel, with personal protective measures to be the
final hierarchical option.
While maintenance is being undertaken consideration of pedestrians and cyclists is to be made due to
the close proximity of the footpaths. To avoid any safety concerns it is recommended that temporary
warning signs be placed at a sufficient distance to allow pedestrians and cyclists to become aware of
possible maintenance vehicles / personnel when maintenance is being undertaken.
North brook Corporation Pty Ltd 29 Novem ber 2012
O:\5101-19-03\wp\R3v2 SMP\Appendices\App F -
Maintenance Plan.docx Page 3
Page 58
!5b
r=b:I
r .
tEcosol’M TECHNICAL SPECIFICATION
The RSF 100 Solid Pollutant Filter
WASTEWATER FILTRATION SYSTEMS
9.0 Cleaning an RSF 100 Solid Pollutant Filter
The RSF 100 Solid Pollutant Filter can be cleaned manually or by vacuum using street-sweeping vehicles. The steps
to be followed for each method are similar and are as follows:
Place appropriate signage, and any necessary traffic
control measures, around the work area and ensure safe
access to the unit
Open and secure the pit access cover or grate
(Manual method) -lift the intemal filtration bag holding the
captured pollutants from the pit (lifting handles are
attached to the removable liner to avoid contact with the
~~ _
.r.,__, .__
pollutants)
(Vacuum method) -
insert snorkel from suction vehicle and
remove the pollutants from the capture basket
Place the captured material into a receptacle and cover it
ready for transportation to an approved waste disposal
facility
(Manual method) prior to reinstalling the liner ensure that
-
no obstructions exist in the bottom of the gully pit. Remove
obstructions, if any, and carefully re-install the liner into the
aluminium slots
Ensure that the by-pass flap(s) is functioning properly and
make sure that the liner is firmly fitted and not obstructing
the by-pass flap(s)
Secure the pit access cover or grate and remove all
equipment and signage
Ensure any affected areas are restored to their original
condition
Street-cleaning equipment can be used to clean
Dispose of all captured pollutants at an approved waste
the RSF 100 quickly and efficiently with no manual
disposal facility handling of pollutants
Ecosol has a very competitive cleaning service. After each clean we provide a full report detailing the volume
and type of pollutants removed. We believe that it is in your best interests for Ecosol staff to clean and maintain
the unit, not only because we are specialists, but also because proper monitoring and maintenance enhances
the unit life significantly. Should you use another company to clean the unit, or undertake this work yourself, we
request that it be conducted according to Ecosol’s specifications. Otherwise, you may invalidate your warranty,
as damage caused by inappropriate cleaning procedures is not covered.
The cleaning frequency, and the cost, depend heavily on the surrounding environment, the unit’s proximity to a
waste facility, the number of units, their location, and the type of pollution collected. The advantages of using
Ecosol to clean and maintain your unit are:
regular inspections of your unit;
comprehensive cleaning service with the removal and disposal of all captured pollutants;
a detailed report provided on completion of each clean;
trained and experienced staff; and
remedial work completed, if required.
Your Ecosol representative can provide you with the necessary information to clean your RSF 100. More details are available in
Ecosol’s RSF 100 Operation and Maintenance Manual
Page 161
NATURAL ECOLOGICAL SOlUTIONS
Used in these records
About this file
- File size
- 52.0 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.