Part 9 of 37 Appendix 7 - Stormwater Management MCU12/0208

of 58

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (52.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

   ’-’   .’L....
                   .
                      ",...,;. (’ ’In’’’~r
D..-\......I _,~/II."\.,.,,,
                       ~
                           ;.-~’
                                      l’-’
                                                     ~


                                              ..../....’    I




                       Z 0 D C 20~1
                                                                                                                                 lii~i iji~r
         r
         .J        _.
                        ,- ~,
                           JU
                           ---
                                   ~,
                                    I
                                        "


                                        ,
                                              J.c r~
                                            ....,.   .

                                                         ._,

                                                                -_. --
                                                                         J              Place barcode here
                                                                                                                                              80602696


                                                THIS IS THE NEXT PART OF A
                                                                                                                                                               "
                                    MULTIPLE PART RECORD

                                                                          Part          _3_ Of "61

                             Application number: (V\C\)\2/020~
                                                           C:\Documents and Settings\eje\DesktoplMulti Part Record Cover Sheet NEXT PART
                                                                                                                                           (3).doc




                                                                                                     b ~.SJ.f?.1.. ..~.........I   R:

                                                                                                                                                     I’f"-’t
Full text of the other 57 pages

Page 2

Prepared for
Northbrook Corporation Pty Ltd


29 November 2012




                                 Cardno@
                                 Shaping the Future


[OCR of page images]
Noosa on Weyba

Stormwater Management Plan

5101/19-03

Prepared for
Northbrook Corporation Pty Ltd

29 November 2012

 

 

 

q>

 

Cardna

Shaping the Future

Page 3

Noosa on Weyba
Stormwater Management Plan
                                                                                                      (..r.,CarcJno~
                                                                                                                     Cardno (Qld)Ply Ltd

                                                                                                                      ABN 57 051 074992


                                                                                                    Level 11 Green Square North Tower

                                                                                                                     515 St Paul’s Terrace

                                                                                                               Fortitude Valley Qld 4006


                                                                                                       Locked Bag 4006 Fortitude Valley


                                                                                                             Queensland 4006 Australia


                                                                                                               Telephone: 07 3369 9822

                                                                                                                Facsimile: 07 3369 9722


                                                                                                          International: +61 733699822


                                                                                                                [email protected]

                                                                                                                     www.cardno.com.au




Document Information

Prepared for                     Northbrook Corporation Pty Ltd

Project Name                     Noosa on Weyba

File Reference                   0:\51 01-19-03\wp\R3v2 SMP\SMP_v2.docx

Job Reference                    5101/19-03

Date                             29 November 2012




Document Control

Version         Date                        Author                               Author        Reviewer                               Reviewer
                                                                                  Initials                                            Initials

                31 October 2012             Nadia Gulerres                        NG           Michael Della                          MD


      2         29 November 2012            Nadia Gulerres                                     Michael Della




"@ 2012 Cardno All Rights Reserved. Copyright in the whole and every part of this document belongs to Cardno
and may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or form or in or on

any media to any person without the prior written consent of Card no."




Northbrook Corporation Pty LId                                  Version 2                                              29 November 2012
SMP_v2.docx                                            Commercial in Confidence                                                    Page ii

Page 4

Noosa on Weyba
Stormwater Management Plan
                                                                                   <..J’) Cardno@

Table of Contents
1       Introduction                                                                                    1

2       Site Description                                                                                2

3       Proposed Development                                                                            3

4       Integrated Water Cycle Management Plan                                                          5

5       Water Quality Objectives                                                                        6

        5.1        Stormwater Quality Objectives                                                        6

        5.2        Noosa River Environmental Values and Water Quality Objectives                        7

6       Proposed WSUD Strategy                                                                          9

        6.1        Summary                                                                              9

        6.2        Treatment Device Details                                                           10

                   6.2.1         Rainwater Tanks                                                      10

                   6.2.2         Bio-retention Basins                                                 10

                   6.2.3         Bio-retention Gardens                                                11

                   6.2.4         Bio-retention Swales                                                 12

                   6.2.5         Litter Baskets                                                       13

7       MUSIC Modelling                                                                               14

        7.1        Summary                                                                            14

        7.2        Catchment Areas                                                                    14

        7.3        Treatment Devices                                                                  15

                   7.3.1         Rainwater Tanks                                                      15

                   7.3.2         Bio-retention Basins and Bio-retention Gardens                       16

                   7.3.3         Bio-retention Swales                                                 17

                   7.3.4         Vegetated Swales                                                     18

                   7.3.5         Litter Baskets                                                       19

8       MUSIC Model Results                                                                           20

        8.1        Load Reduction                                                                     20

        8.2        Sensitivity Analysis                                                               20

        8.3        Frequent Flow Objective                                                            21

        8.4        Waterway Stability                                                                 22

9       Conclusion                                                                                    23




Northbrook Corporation Pty Ltd                            Version 2                      29 November 2012

SMP_v2.docx                                        Commercial in Confidence                       Page iii

Page 5

Noosa on Weyba
Stormwater Management Plan
                                                                                                             <..J’) Cardno@

Tables
Table 7-1      MUSIC Sub-catchments..........................................................................................................14

Table 7-2      Rainwater Tank Details ...........................................................................................................16

Table 7-3      Bio-retention Basin and Bio-retention Garden Details ..............................................................17

Table 7-4      Bio-retention Node Details.......................................................................................................18

Table 7-5      Swale Node Details.................................................................................................................18

Table 7-6      Vegetated Swale Details .........................................................................................................18
Table 8-1      Pollutant Load Reductions.......................................................................................................20

Table 8-2      Comparison to Existing Case ..................................................................................................20
Table 8-3      Sensitivity Analysis Results .....................................................................................................21



Figures
Figure 1       Site Location

Figure 2       Sub-catchments

Figure 3       Proposed Storm water Treatment                -
                                                               Areas A to G

Figure 4       Proposed Stormwater Treatment                 -
                                                               Areas H and I

Figure 5       Proposed Stormwater Treatment                 -
                                                               Areas J to L




Appendices
Appendix A         Concept Masterplan
Appendix B         Water Quality Monitoring Of Lake Weyba

Appendix C         Community Information Leaflet
Appendix D         Underground Rainwater Tank Example
Appendix E         MUSIC Model Layouts

Appendix F         Maintenance Plan




Northbrook Corporation Pty Ltd                                     Version 2                                                  29 November 2012

SMP_v2.docx                                               Commercial in Confidence                                                         Page iv

Page 6

Noosa on Weyba
Stormwater Management Plan
                                                                                     ~,.., Cardno@

1              Introduction


The subject site, known as Noosa on Weyba, encompasses the following lots:

The Northbrook Pty Ltd land:

>   Lot 1667 on M3772                      44.4 ha

>   Lot 11 on RP893393                     40.7 ha

>   Lot 12 on RP893393                     0.61 ha

The J & K Hofmann land:


>   Lot 7 on RP46782                       1.99 ha

>   Lot 2 on RP160983                      93.1 ha

>   Lot 2 on SP 179590                     12.5 ha

>   Lot 53 on SP163571                     110.0ha

It is proposed to develop around 19 percent of this site for residential purposes, with 4 percent of the site
used    parks and lake buffer zone and the remaining 77 percent of site dedicated as greenspace and
       as

conservationareas.   The developed areas are contained within Lot 11 and 12 on RP893392, Lot 2 on
SP179590 and Lot 53 on SP163571. The concept master plan for the development is shown in Appendix A.
The development will be conducted under a Community Title Scheme.

The site ultimately drains to Lake Weyba which is a declared Fish Habitat Area. A section of the site is also
located in the Water Resource Catchment Area          as   defined
                                                              by the Maroochy Plan 2000. Therefore the
treatment of stormwater to the best possible standard is of the upmost importance. A significant portion of
the site is currently used for rural purposes, in particular the grazing of cattle.    Consequently the
development provides an opportunity to improve the quality of stormwater being discharged from the site if
appropriate measures are adopted.
To ensure that the impact of the development is minimised, the principles of water sensitive urban design

(WSUD) have been adopted. These principles (sourced from Urban Stormwater Planning Guidelines
Queensland Department of Environment and Heritage Protection (DEHP),2010) include:

>   the protection of existing natural water features;

>   the integration of public open space with stormwater drainage corridors to maximise public access and
    recreation and preserve waterway habitats and wildlife corridors;

>   the maintenance of the natural hydrologic behaviour of catchments by preserving the natural water cycle;

>   the protection of water quality environmental values;

>   the minimisation of the demand on the reticulated water supply system and utilisation of stormwater as a
    valued resource;

>   the minimisation of capital and maintenance costs of stormwater infrastructure; and

>   the integration of water into the landscape to enhance visual, social, cultural and ecological values.

The aim of this report is to determine the overall WSUD          strategy for the site.   Further analysis will be
conducted during the detailed design stage. This report will:

>   Determine the relevant water quality objectives (WQO)for the site;

>   Outline the water sensitive urban design (WSUD)measures that will be adopted for each precinct and the
    site as a whole; and

>   Conduct MUSIC modelling to determine whether WQOs can be met.




Northbrook Corporation Pty Ltd                       Version 2                                    29 November 2012

SMP_v2.docx                                   Commercial in Confidence                                       Page 1

Page 7

Noosa on Weyba
Stormwater Management Plan
                                                                                    ~,.., Cardno@

2              Site Description

The location of the site is shown in Figure 1.

The J & K Hofmann land is bounded       by Hollett Road to the south, Eenie Creek to the north and it includes
lots on both sides of Walter Hay Drive.      Ephemeral tributaries of Eenie Creek run through or adjacent to
these lots. An existing farm dam is also located within this area. The site is currently used for rural purposes
and the majority of the site is densely vegetated with sections that have been cleared for grazing purposes.
The site is relatively steeply sloped, and the tributaries are well defined, except for the area just to the north
of Hollett Road where the ground is fairly flat and flows disperse over a wide area.

The Northbrook    Pty Ltd land is located to the south-east of the J & K Hofmann land and is bounded by
Tidswell Road to the west and Lake Weyba to the east. The site is currently used for rural purposes. The

majority of Lot 11 has been cleared with sections of remnant vegetation. A tributary of Lake Weyba,
historically known as Keyser Creek, is located within Lot 11, and drains from south to north. A dam is also
located in this area. Keyser Creek, within Lot 11 is relatively flat and low lying with levels ranging from 0.7 to
1.1 mAHD. A track located along the northern boundary of the site currently acts as a bund controlling
outflows. It has a minimum level of 1.14 mAHD. At the southern boundary of the site the level of Keyser
Creek rises sharply to a minimum level of around 1.8 mAHD. The western section of Lot 11 is relatively flat
with a grade of around 1 percent and levels from 0.7 to 6.5 mAHD. The central section of Lot 11 drains
towards Keyser Creek and is generally more steeply sloped with levels up to 14.5 mAHD. The eastern
section of Lot 11 drains towards Lake Weyba and is generally moderately sloped with a grade of around 5

percent, and levels from 0.5 to 14.5 mAHD.
Lake Weyba is connected to Noosa River via Weyba Creek.

A   geotechnical investigation of the site was carried out; refer Geotechnical Investigation (Cardno, August
2012). The results of this study concluded that subsurface conditions at the site generally consisted of a
layer of either loose sands or soft to firm clay underlain by stiff or better clays. Weathered rock was
encountered in some of the boreholes. These soils types indicate that infiltration of stormwater will not be a
suitable method of disposal.

The 1 :100000 Gympie Special geological map indicated that the expected subsurface strata across the site
would contain Quaternary alluvium    along with lithofeldspathic labile and sublabile to quartzose sandstone,
siltstone, shale and coal from the late Triassic-Jurassic era. The geology map also indicates a regolith with
deep weathering profile. The quaternary alluvium may indicate a possibility of acid sulphate soil (ASS). Soil
tests conducted showed that actual and   potential ASS was unlikely to be located on the site. However,
further testing and sampling is recommended once the area of disturbance is finalised. An acid sulphate soil

management plan will be required.




Northbrook Corporation Pty Ltd                      Version 2                                    29 November 2012

SMP_v2.docx                                  Commercial in Confidence                                      Page 2

Page 8

Noosa on Weyba
Stormwater Management Plan
                                                                                      ~,.., Cardno@

3              Proposed Development

The concept development plan is shown in Appendix A. A summary of what is proposed in each precinct is

provided below.
Precinct 1

Area A

Area A is located within Lot 12 of the Northbrook site, adjacent to Lake Weyba, and consists of an existing
residence that will be renovated to provide facilities for residents of Noosa on Weyba.

Area B

Area B is located within Lot 11 of the Northbrook site, adjacent to Lake Weyba. It drains to the north-east
and the south-east towards Lake Weyba. This precinct is generally sloped at around 5 percent, with flatter
areas around the crest.      73 premium residential lots are proposed in this precinct.

Area C

Area C is located in the eastern section of Lot 11, and drains north-east towards Lake Weyba. The average

slope in this area is around 2 percent. Apartments and mixed use areas are proposed in this area, with
around 600 m2 of commercial area.

Area 0

Area D is located in the eastern section of Lot 11, and drains north-west towards Keyser Creek. The average

slope in this area is around 3 percent. 83 townhouses are proposed.
Area E

Area E is located in the eastern section of Lot 11, and drains west towards Keyser Creek.        The average

slope in this area is around 3 percent. Retirement living and aged care facilities consisting of 120 residences
are proposed.


Precinct 2

Area F

Area F is located in the western section of Lot 11 and drains west towards Keyser Creek.          This area is

relatively flat and low-lying. Some filling is required in this area to provide sufficient flood immunity.   40
residential lots are proposed.

Area G

Area G is located in the western section of Lot 11 and drains east towards Keyser Creek.          This area is

relatively flat and low-lying, with higher and steeper areas along the boundary with Tidswell Road. Some
filling is required in this area to provide sufficient flood immunity. 124 residential lots are proposed.
Precinct 3

AreaH

Area H is located on the eastern side of Walter Hay Drive, within Lot 53 of the J & K Hofmann site. It drains
north towards Eenie Creek and east towards Keyser Creek. The western section of this area is relatively flat
with grades of around 1 percent, and the eastern section is sloped at around 3 percent. 24 townhouses and
52 residential lots are proposed.

Area I

Area I is located on the western side of Walter Hay Drive, within Lot 53 of the J & K Hofmann site. It drains
west towards a tributary of Eenie Creek. The northern section of Area I drains directly towards Eenie Creek.
The slopes within this area are around 5 percent, except for the northern section where they are around 1

percent. A total of 203 residential lots are proposed.


Northbrook Corporation Pty Ltd                         Version 2                               29 November 2012

SMP_v2.docx                                     Commercial in Confidence                                 Page 3

Page 9

Noosa on Weyba
Stormwater Management Plan
                                                                                     ~,.., Cardno@
Precinct 4

Area J

Area J is located on the western side of Lot 53 and drains east into the tributary of Eenie Creek. One rural
residential lot is proposed.

Area K

Area K is located on the western side of Lot 53, bounded by Hollett Road West to the south. It drains east
towards the tributary of Eenie Creek, upstream of the existing dam. The slopes in this area are around 2

percent. 6 premium residential lots are proposed.

Area L

Area L is located within Lot 2 of SP179590, in the J & K Hofmann site.           It drains north towards another

tributary of Eenie Creek. The southern section of the site is quite flat, which steeper areas of around 5
percent in the northern part of the lot. Retirement living and aged care facilities consisting of 100 residences
are proposed.


The proposed precincts are all located within areas that have been previously cleared for grazing purposes.
The majority of the site will be retained in its natural state and/or revegetated.

Along Lake Weyba a 50 metre buffer area will be provided to the lot boundary, consisting of 40 metres of
open space and 10 metres of stormwater treatment area. This buffer area has mainly been cleared for cattle
grazing purposes. Revegetation of this area is proposed which will provide screening and improve its
ecological value. The buildings within the lots will be set back a further 10 metres, providing a total set back
of 60 metres to the lake. In Precinct 2 a 120 metre wide waterway corridor will be provided, which

encompasses Keyser Creek.        The existing vegetation and dam in this area will be maintained and
rehabilitated.  No compensatory excavation is proposed in this area so as to minimise potential
environmental impacts associated with vegetation clearance and the exposure of disturbed soils within a

waterway corridor. Flood modelling has shown that dense revegetation of this area would also be
achievable with acceptable flooding impacts for the site and surrounding properties, should this be desirable.

The existing dam and vegetated tributary located within Lot 53 will be maintained and rehabilitated.

The  proposed development has reticulated water and sewerage, and will pump effluent to the Noosa
Sewerage Treatment Plant (refer Water Supply and Sewerage Analysis, Cardno, October 2012). Previous
development applications for this site have utilised on-site treatment and disposal of effluent via irrigation.
This development plan therefore reduces the risk of contaminants from effluent being discharged into Lake

Weyba.




Northbrook Corporation Pty Ltd                       Version 2                                   29 November 2012

SMP_v2.docx                                   Commercial in Confidence                                    Page 4

Page 10

Noosa on Weyba
Stormwater Management Plan
                                                                                  ~,.., Cardno@

4               Integrated Water Cycle Management Plan

An Integrated Water Cycle Management Plan (IWCMP)has been prepared by Gilbert and Sutherland as part
of the Noosa on Weyba development (refer IWCMP, Gilbert and Sutherland, August 2012).

The ICWMP considered several servicing options for the development. The Gilbert and Sutherland report
recommends Option 4 as the preferred servicing strategy.       In summary:

"Option 4 assumes sewage is treated off-site at the Noosaville STP and maximises rainwater harvesting at
each residence. It is typical of IWCWMP systems in high rainfall areas which achieve a reasonable reduction
in potable water demands.

>   Domestic water supply: sourced from the municipal supply and domestic rain tanks (for toilet cisterns and
    laundry);
>   Wastewater management: sewerage from development precincts to the Noosaville STP;

>   Domestic garden irrigation supplied from the domestic rain tanks;

>   Roof tank overflow and stormwater flows       through bio-retention swales and basins, prior to creek
                 "

    discharge.

The recommendations of the IWCMP will be adopted as part of the WSUD strategy for the site. Rainwater

harvesting will be maximised through the connection of all available roof area to the tank and the utilisation
of rainwater tank sizes around twice the size prescribed      by the Queensland Development Code (QDC).
Collected rainwater will be used for irrigation, toilet flushing and laundry purposes. This will significantly
reduce the potable water demand of the site. The MUSIC modelling has conservatively assumed that the
tanks would only be used for domestic irrigation purposes for standard residential precincts and open space

irrigation of the other communal precincts. Due to the large size of the rainwater tanks being proposed they
could also be used to irrigate the remaining open space areas on site, which would further reduce the

potable water demand and reduce the volume of stormwater being discharged from the site.
The installation of water efficient devices and appliances has also been assumed.

Stormwater flows will be treated to the required WQOs prior to being released into the gullies and waterway
corridors located within the site. These areas will be rehabilitated and will provide some additional polishing
of stormwater prior to release into Lake Weyba.




Northbrook Corporation Pty Ltd                     Version 2                                   29 November 2012

SMP_v2.docx                                 Commercial in Confidence                                     Page 5

Page 11

Noosa on Weyba
Stormwater Management Plan
                                                                                        ~,.., Cardno@

5              Water Quality Objectives


5.1            Stormwater Quality Objectives

The WQOs for stormwater treatment for the site cover three main components: pollutant load removal

targets; frequent flow management; and waterway stability. These WQOs have been derived from Maroochy
Shire Council Planning Scheme Policy No.6 as well as the Urban Stormwater Quality Planning Guidelines
(DEHP, 2010). Design objectives are specified for both the construction and operational phases of
development.
CONSTRUCTION PHASE

During the construction phase of development, the water quality objectives (WQOs)for the site include:
>   Coarse sediment-coarse sediment is retained on site.

>   Fine sediment (T55)-site discharge during sediment basin dewatering has a TSS concentration less
    than 50 mg/L.      Achieve site discharge water quality through, for example, appropriate sediment basin

    design and operation with flocculation as required.       It is noted that on the Sunshine Coast basins are

    typically designed for 125mm rainfall depth over a five day period.
>   Turbidity-Site discharge during sediment basin dewatering has a turbidity (NTU)less than 10% above
    receiving waters turbidity. A site-specific relationship should be developed between turbidity and
    suspended solids, prior to the commencement of construction.
>   Nutrients (N & P)-Nitrogen and phosphorous are managed through sediment control.

>   pH-Site discharge during sediment basin dewatering has a pH range 6.5-8.5
>   Litter and other waste-Prevent litter/waste entering the site, the stormwater system          or watercourses

    that discharge from the site. Also minimise or sufficiently contain on-site litter and waste production and

    regularly clear waste bins.
>   Hydrocarbons and other contaminants- no visible sheen, no detectable odour. Hydrocarbons and
    other contaminants are       prevented from entering the stormwater system or internal watercourses that
    discharge from the site.
>   Wash down water-Wash down water is prevented from entering the stormwater system                     or   internal
    watercourses that discharge from the site.

>   Cations and anions-Cations and anions including aluminium, iron and sulfate are managed as required
    under an approved acid sulphate soil management plan.

The focus during the construction phase will be erosion and sediment control.          Appropriate measures, such
as silt fences and     berms will be adopted on a lot by lot basis.       The proposed bio-retention and detention
basins can also be utilised as temporary sedimentation basins. The filter media will either be protected or
not installed until the majority of construction within the catchment area has been         completed.   Dedicated

temporary sedimentation basins will be required in some areas. An erosion and sediment control plan will be
required for each stage of the construction.
OPERATIONAL PHASE

Pollutant Load Reduction

During the operational phase the following pollutant load removal targets are specified for the development:
>   Gross Pollutants: 90 percent reduction compared to untreated runoff;

>   Total Suspended Solids (TSS):80 percent reduction compared to untreated runoff;

>   Total Phosphorous (TP):60 percent reduction compared to untreated runoff; and

>   Total Nitrogen (TN):45 percent reduction compared to untreated runoff.




Northbrook Corporation Pty Ltd                        Version 2                                    29 November 2012

SMP_v2.docx                                    Commercial in Confidence                                        Page 6

Page 12

Noosa on Weyba
Stormwater Management Plan
                                                                                                   ~,.., Cardno@
The WSUD features proposed for the site will be modelled with MUSIC to ensure these WQOs are met.

In addition the pollutant load from the site will be compared to the existing case, using MUSIC, to ensure that
the pollutant load from the site is not being increased.

Frequent Flow Management
The impervious percentage of the developed areas is greater than 40 percent.                       Therefore it is required to

capture and manage the first 15mm/day of runoff from all impervious surfaces. The storage volume should
be able to drain within 24 hours.

Waterway Stability

Limit the post-development peak 1 year ARI event discharge within the receiving waterway to the pre-

development peak 1 year ARI event discharge.

5.2            Noosa River Environmental Values and Water Quality Objectives

According to DEHP’s Noosa River Environmental Values and Water Quality Objectives (July, 2010) Lake
Weyba is located in area NME1   Noosa Lakes (middle estuary) and the following environmental values
                                                      -




apply:
>   Aquatic Ecosystems
>   Seagrass
>   Human Consumer

>   Primary Recreation
>   Secondary Recreation
>   Visual Recreation

>   Cultural and Spiritual Values

The applicable water quality objectives for Lake Weyba are to maintain the existing water quality                   (20th, 50th
and 80th percentiles), which are:

>   Turbidity: 2    -
                        5   -
                                8 NTU

>   Suspended Solids (TSS):20                       -
                                                        20   -
                                                                 20 mg/L

>   Chlorophyll a: 0.8          -
                                    1.5     -
                                                2.5 I-Ig/L

>   Total Nitrogen (TN): 150                 -
                                                 240    -
                                                            380 I-Ig/L

>   Oxidised N: 2       -
                            5   -
                                    15 I-Ig/L

>   Ammonia N: 7 -15                -
                                        32 I-Ig/L

>   Organic N: 130          -
                                210     -
                                            320 I-Ig/L

>   Total Phosphorous (TP): 10- 13                          -
                                                                16 I-Ig/L

>   Filterable Reactive Phosphorous (FRP):2                                 -
                                                                                2   -
                                                                                        2 I-Ig/L

>   Dissolved Oxygen: 85                 -
                                             95   -
                                                      105% saturation

>   pH: 8.0   -
                  8.2   8.3
                        -




>   Secchi depth: 1.1           -
                                    1.6     -
                                                2.0 m



Healthy Waterways undertakes regular monitoring of water quality within Lake Weyba under their Ecosystem
Health Monitoring Program. The observed water quality from 2002, compared to the above objectives is
shown in Appendix B. The observed water quality for turbidity, chlorophyll a, TN, ammonia N, organic Nand
secchi depth currently do not meet the DEHP objectives. It should be noted that the target secchi depths are

greater than the average depths of Lake Weyba.



Northbrook Corporation Pty Ltd                                                  Version 2                     29 November 2012

SMP_v2.docx                                                         Commercial in Confidence                            Page 7

Page 13

Noosa on Weyba
Stormwater Management Plan
                                                                                  ~,.., Cardno@
MUSIC modelling will be used to determine the reduction in       pollutant loads for the operational phase of
development.       This is the approach recommended     by  DEHP to determine whether     proposed treatment
devices will be sufficient. The resultant pollutant concentrations in the MUSIC modelling will be dependent
on the assumed default background concentrations within the treatment devices, which are in some

instances higher than the WQOs. For example the background TP concentration in bio-retention systems is
assumed to be 130 I-Ig/L. It is therefore not possible to show through MUSIC modelling that concentration
based WQOs can be met. Regular monitoring of water quality within Lake Weyba, conducted by Healthy

Waterways will be utilised to determine whether there is an impact from development, which will indicate that
the treatment measures being implemented on site should be reviewed.

Water quality monitoring of the existing waterbodies within the site will be conducted prior to development to
determine suitable discharge turbidity levels during the construction phase.   Monitoring of TSS, TP, TN and
gross pollutants is also recommended during this stage to define the existing water quality.

Event based (i.e. greater than 30mm rainfall in 24 hours) water quality monitoring of the waterbodies within
the site should be conducted for TSS, TP, TN and gross pollutants to ensure that the above water quality
concentration objectives are met.




Northbrook Corporation Pty Ltd                     Version 2                                   29 November 2012

SMP_v2.docx                                 Commercial in Confidence                                    Page 8

Page 14

Noosa on Weyba
Stormwater Management Plan
                                                                                             ~,.., Cardno@


6              Proposed WSUD Strategy

6.1            Summary
The proposed WSUD features are shown in Figures 3, 4 and 5. In summary the WSUD strategy for the site
included:

>   Community Education.          The most effective treatment measure is to reduce the source of pollutants.
    Therefore community education is proposed          so that   residents are informed about what they can do to
    reduce their impact on their surrounding environment.           Information signs will be located at stormwater
    devices. An information leaflet will be distributed to each residence prior to the wet season each year.
    An example of the information leaflet is contained in Appendix C. As the development is a Community
    Title Scheme the body corporate will also be able to instigate appropriate measures to reduce pollutant
    loads from communal areas.

>   Reducing Potable Water Demand. Water efficient devices and appliances will be installed in each
    residence. Drought tolerant gardens will also be recommended.

>   Providing an Alternative        Water Source.       All   practically   available roof   area   will be connected to
    rainwater tanks that will be larger than QDC requirements, so as to maximise rainwater harvesting on
    site, minimise potable water demand and reduce the volume of stormwater discharged from site.
    Rainwater tanks will be used for toilet flushing, laundry and irrigation purposes.

>   Bio-retention Basins. Bio-retention basins are located at the end of the stormwater line, upstream of the

    point of discharge from the site. Stormwater ponds in the basins before slowly percolating through the
    vegetated filtration media and being treated through bio-filtration processes. Filtered stormwater is
    collected by perforated pipes and the discharged from site. Coarse sediment forebays will be located at
    the inlet points to capture sediment and prevent blockage of the filter media.

>   Bio-retention Gardens. Bio-retention gardens are small bio-retention basins that double as landscaped
    areas within     the road reserve.   They will treat runoff through bio-filtration before it is discharged to the
    stormwater system. Bio-retention gardens are suitable is relatively flat areas.

>   Bio-retention Tree Pits.  Bio-retention tree pits are trees located within filter media within the road
    reserve. They can provide some pre-treatment of runoff from the road prior to it being discharged to the
    stormwater system. Additional treatment will be required downstream. Tree-pits can be located in

    moderately sloped areas.
>   Bio-retention Swales.        Bio-retention swales are like standard vegetated swales but with a filter media

    layer to provide additional treatment of stormwater.        They are typically located along road-sides and can
    be used in flat to moderately sloped areas (around 2 percent).

>   Vegetated Swales. Vegetated swales will be used where underdrainage or slope requirements make the
    use of bio-retention swales
                            impractical.
>   Litter Baskets. Bio-retention basins and gardens are generally sufficient to capture any gross pollutants
    or litter from   urban areas. However, as an additional treatment measure litter baskets will be installed on
    the field inlets of bio-retention    gardens, swales and basins, as well as any other stormwater outlet
    discharging to the receiving waterways.
>   Revegetation of Lake Weyba Buffer Area.              A 40 metre wide lake buffer will be located along Lake

    Weyba.     This will   provide additional treatment of stormwater that may overflow from the adjacent bio-
    retention swales located in the 10 metre stormwater treatment zone. The buffer area, which has mostly
    been cleared of  vegetation for use as cattle grazing, will be revegetated, which                    will   improve its
    performance as a buffer treatment area, and improve bank stabilisation.




Northbrook Corporation Pty Ltd                          Version 2                                         29 November 2012

SMP_v2.docx                                      Commercial in Confidence                                            Page 9

Page 15

Noosa on Weyba
Stormwater Management Plan
                                                                                        ~,.., Cardno@
>     Rehabilitation of Keyser Creek       Waterway Corridor.        Rehabilitation will include the stabilisation of
      banks where required, weed removal and revegetation. A dam already exists in Keyser Creek, upstream
      of the crossing linking Areas F and G in Precinct 2. Rehabilitation of this area will improve its functionality
      as a   public open space, and also improve its ecological value.
>     Wastewater Management. The proposed development has reticulated water and sewerage. Previous

      development applications for this site have utilised on-site treatment and disposal of effluent via irrigation.
      This development plan therefore reduces the risk of contaminants from effluent being discharged into
      Lake Weyba.

The   impact of community education, bio-retention tree pits, litter baskets, buffer area revegetation and
rehabilitation has not been included in the MUSIC modelling, unless stated otherwise. Therefore the MUSIC
results are a conservative assessment of the improvement in stormwater quality that can be achieved on
site.

The proposed treatment devices have been located outside of ecologically constrained areas and outside of
the 100 year ARI extent of inundation.


6.2              Treatment Device Details

6.2.1            Rainwater Tanks

All practically available roof area will be connected to the proposed rainwater tanks so that stormwater
harvesting on site is maximised.
10 kL tanks are proposed for each residential lot. 5 kL rainwater tanks are proposed for each townhouse or
retirement villa.     These tanks will likely be combined into a smaller number of larger tanks for irrigation of
communal areas. A 120 kL tanks is proposed for the apartment buildings. These proposed rainwater tanks
sizes    are   around twice the standard rainwater tank sizes        currently required by QDC and the former
Maroochy Shire Council.
Due to the large size of the proposed rainwater tanks it is likely that they will be underground systems. An

example of this kind of set-up from a local manufacturer (Action Tanks) is shown in Appendix D.
Pre-treatment of roof water via a litter screen is recommended, as shown in Appendix D. This litter screen
has not been included in the MUSIC modelling.


6.2.2            Bio-retention Basins

End-of-line bio-retention basins will be utilised in areas where the slopes are too steep or there is insufficient
area for bio-retention     gardens within the road reserve.    Bio-retention tree-pits will also be utilised in these

areas, where practical, to provide some pre-treatment of runoff.           However, these were not included in the
MUSIC modelling (refer Section 7).

The proposed bio-retention basins and gardens will provide some minimal attenuation of peak flows. Most of
the attenuation of major peak flows on site will be provided        by the proposed road culvert crossings (refer
Flood Study, Cardno, October 2012). The bio-retention basins for catchments 3_1_4, 3_1_5 and 4_L will be
combined into the detention basins proposed for these sub-catchments.               The design of these detention
basins will be conducted at detail design stage, however, indicative sizes are shown in Figure 3, 4 and 5.
The     remaining bio-retention basins will only be utilised for stormwater quality purposes.         Therefore the
basins will not be as deep.

For the detailed civil design of each basin the following elements should be included.

>     The overflow pits and weirs should ideally be located near the inlet points, so that during major rainfall
      events the scouring of bio-retention vegetation is minimised.

>     Access ramps should be provided for each basin so that maintenance vehicles can gain access to the
      base.

>     Coarse sediment forebays or sedimentation ponds should be installed at inlet points.

>     The perforated pipe underdrainage should be spaced at approximately 2 metre intervals.



Northbrook Corporation Pty Ltd                         Version 2                                     29 November 2012

SMP_v2.docx                                     Commercial in Confidence                                      Page 10

Page 16

Noosa on Weyba
Stormwater Management Plan
                                                                                                     <..f) Carcln                            @




>   Clean out points should be provided for all underdrainage.

>   Litter baskets should be installed on the overflow pits.

The bio-retention filter media was assumed to be sandy loam with a saturated hydraulic conductivity of 200
mm/hr. The extended detention depth was assumed to be 0.3 metres. The filter depth assumed was either
0.6 or 0.8 metres. Transition and drainage layers will also be required underneath the filter media. In areas
outside of the Asset Protection Zone (APZ)the bio-retention basins can be planted with suitable trees such
as melaleucas.           These require a filter depth of 0.8 metres. The advantage of planting trees in bio-retention
basins is that they improve the aesthetics and bio-diversity.                    They also reduce the likelihood of blockage of
the filter media. Recent studies have shown they do not increase the risk of blockage of the underdrainage.

A typical bio-retention basin cross-section is shown in Image 1.




                                                                                                                   Overflow Weir
                                                                                                             ~

                                Clean Out Point



 Inlet Pipe

                                                                                                      0.3m Extended Detention Depth




              Concrete Lined
              Coarse Sediment                                                                         0.6m Filter Media (Sandy Loam)
              Forebay



                                                                                                      0.1 m Transition Layer (Coarse Sand)


                                                                                                     ~0.2m Drainage Layer (Fine Aggregate)



                                Geotextile Fabric
                                                                Underdrainage          Outlet Pipe

                                                                (0.50/0 slope)




Image 1                  Typical Bio-retention Basin Cross-section

6.2.3              Bio-retention Gardens

Bio-retention gardens are similar to bio-retention basins, except that they are smaller in size and located
within the road reserve, and so can be incorporated into the landscaping. They treat runoff from surrounding
areas before it is        discharged to the stormwater pipes.

They are effective treatment devices in relatively flat and low-lying areas as they do not need as much
vertical differentiation.

The bio-retention filter media was assumed to be sandy loam with a saturated hydraulic conductivity of 200
mm/hr. The extended detention depth was assumed to be 0.15 metres. The filter depth assumed was 0.8
metres, to allow for the planting of trees.            Transition and drainage layers will also be required underneath
the filter media.

A typical bio-retention garden will have a filter area of 9 m2 and a surface area of around 20 m2 to allow for

batters, coarse sediment forebay and field inlet. They will each treat runoff from every two lots on average.
Larger gardens will be positioned in areas where there is sufficient space.
The location and               design of the bio-retention gardens will be detailed during the design of the Precincts.
Road reserve widths of at least 15 metres will be necessary to accommodate them. They can be utilised as
traffic calming devices.

To improve the treatment efficiency of the bio-retention gardens the overflow from the rainwater tanks will be
connected directly to the underground               drainage.     This will ensure that relatively clean roofwater is not re-
contaminated, it will improve the drainage efficiency of the road reserve and so reduce the risk of local
flooding. A sensitivity analysis looking at the impact of draining the rainwater tanks to the bio-retention
gardens will be conducted.
For the detailed civil design of each basin the following elements should be included.



Northbrook Corporation Pty Ltd                                   Version 2                                          29 November 2012

SMP_v2.docx                                            Commercial in Confidence                                                    Page 11

Page 17

Noosa on Weyba
Stormwater Management Plan
                                                                                                                                ~,.., Cardno@
>      Coarse sediment forebays on the inlet point.

>         Batters should be densely vegetated to deter pedestrian/vehicle access. The batter slope should be at
          least 1 in 2.

>         Inorganic mulch laid over the filter media surface improves moisture retention.                                           The mulch used should
          not float during rainfall.

>     The overflow pit invert will be 150 mm above the base to provide for extended detention. The total depth
       of the bio-retention garden will be around 250 mm to prevent ponding within the road.

>         Litter baskets should be installed on the overflow pits.

>      Clean out points should be provided for all underdrainage.

>     A flat pedestrian         refuge area of around 300mm width should be provided along the boundary with the
          road.

A typical bio-retention garden cross-section is shown below in Image 2 and an example is shown in Image 3.


 WSUD garden bed type 2                     -

                                                plan                                     Section A-A


                                 1A                                                                                                                       150m m thick COrlOr.t. apron,
                                                                                                                                                          SL62 me,h. 50 to~ co.er, 1 in +
                                                                                                                                                          max. Ge1:ltechn c<1I engineer to

                                                                                                                                                          confirm   com paction   requirements
AOjacent      road
                                                       Type ’D’ kerb
SUr’f t                                                                                                                                                   or   subsoil.
          ,                                            and channel.


                                                                                        Coarse sediment
Concrete apron.
                                                                                        10reOOy, reler note 1.

                                                                                        Vegetated bioretention
Planted b<JUer,                                        Side drClins un<ler kerb (]nd    pod finished surface l-evel.
refer note 4.                                          channel to connect to inlet      refer notes 5 and 6.
                                                       p~ sepc rotely to bioretention
                                                       under-df(]in ge.
Coarse sediment
forebay, refer nate 1.                                                                  Bior-ete-ntion filter medic.
                                                       Field inlet Type 1 in            Refer UI.IS 160.
Under drainage,                                        accord(]nce with UMS 337.        (Removing "B oretention
refer note 2.                                                                           filter me<lio. For details                  ~ ~er clotm   and/or i m pe,mea bl.
                                                                                        refer IPI’lEAO Std   Ilwgs                  liner to be,e and ,ides. Pin
                                                                                        WSUD-OO 1 and                               filter clotll to i nsitu soi I (]nd
8ioreterrtion
filter med Q,                                                                           WSUD-002).                                  lay concrete onto filter cloth,
                                                                                                                                    refer note 3.
                                 ..JA

Image 2                  Typical Bio-retention Garden (Water Sensitive Urban Design: Streetscape Planning and
                         Design Package, Brisbane City Council, 2011)




Image 3                  Bio-retention Garden


6.2.4                    Bio-retention Swales

Bio-retention swales are similar to bio-retention basins, except that they are long and narrow systems with
no extended              detention depth.   They have a shallow longitudinal grade of 2 percent or less. Field inlets are
located along the length of the swale to drain excess flows.                                                  Litter baskets should be installed on all field
inlets.




Northbrook Corporation Pty Ltd                                                   Version 2                                                                29 November 2012

SMP_v2.docx                                                      Commercial in Confidence                                                                                         Page 12

Page 18

Noosa on Weyba
Stormwater Management Plan
                                                                                    ~,.., Cardno@
Batter slopes of 1 in 6 have been assumed for bio-retention swales adjacent to roads.           For other bio-
retention swales batter slopes of 1 in 4 have been used.

Bio-retention swales are proposed adjacent to the lake buffer zone in Area B. To better simulate natural flow

patterns several underdrainage outlets will be located along the length of the swale, which will discharge
treated stormwater directly to the lake. Several rock check dams will be located along the length of the swale
where some of the overflow will be discharged across the adjoining lake buffer.    Appropriate scour protection
will be required in these areas. The stormwater treatment zone has a width of 10 metres. Based on natural
surface levels the width of the swale required would be around 7 to 8 metres. Further details are provided in
Section 8.


6.2.5          Litter Baskets

As the proposed    development is a community title scheme the maintenance of stormwater quality devices
will be the responsibility of the body corporate. In standard residential developments litter baskets would not
be used due to their ongoing maintenance requirements.               For further details of the maintenance

requirements refer to Appendix F.
Litter baskets have been         proposed on all inlets discharging to downstream waterways so that any excess
litter and gross pollutants not captured by the other proposed WSUD measures is retained on site and not

discharged downstream. Litter baskets will therefore be required in bio-retention gardens, bio-retention
gardens, bio-retention swales and vegetated swales.

They have an advantage over in-ground gross pollutant traps (GPTs)in that litter is stored in a dry state,
which reduces the risk of dissolved       pollutants being discharged downstream. The maintenance of litter
baskets is also more straightforward. They are designed not to impact on the hydraulic efficiency of the gully
or field inlets in which they are installed.


The Ecosol RSF 100 is a typical example of a litter basket that could be used on site.




Northbrook Corporation Pty Ltd                          Version 2                              29 November 2012

SMP_v2.docx                                      Commercial in Confidence                               Page 13

Page 19

Noosa on Weyba
Stormwater Management Plan
                                                                                          ~,.., Cardno@

7                MUSIC Modelling


7.1              Summary
MUSIC Version 5.1.16 was used in the               analysis.     The MUSIC      Modelling Guidelines for South East
Queensland (Healthy Waterways, 2010) were used as the main reference to set up the models.

The rainfall data was taken from Cooroy Composite (40059)for the 10 year period from the 1/1/1973 to
31/12/1982. A 6 minute time step was adopted.

The MUSIC model layouts for each precinct are shown in Appendix E.


7.2              Catchment Areas

The sub-catchment areas are shown in Figure 2.

The rainfall runoff parameters and pollutant export parameters were taken from Tables 3.7 and 3.8 of the
MUSIC Modelling Guidelines.

For the  existing case a rural-residential node was used, with a 0 percent impervious value. For the
developed case an urban-residential nodes were used, except for a small area of commercial development
in Area C. The residential areas were assumed to be 60 percent impervious, townhouses, apartments and
retirement living areas were assumed to be 70 percent impervious.

The breakdown of road, roof and ground area was based on the concept masterplan layout. For precincts
where the layout has not been specified typical surface type splits from Table 3.3 of the manual were used.
The roof       area   of   premium   residential lots was assumed to be 250 m2, and the roof       area   for standard
residential lots was assumed to be 215 m2 in accordance with Table 3.3. All of the available roof area will be
connected to rainwater tanks so as to maximise stormwater harvesting on site.

The new access roads have been included in the MUSIC modelling. The upgrade of existing Council roads
will be undertaken on behalf of Councilor by Council, at a cost to the development. These roads will be

provided with best practice stormwater quality treatment. These road upgrades have not been included in
the MUSIC modelling.

The breakdown of each sub-catchment is shown in Table 7-1.

Table 7-1        MUSIC Sub-catchments

  ~l~                                            ~                              ~                      (ft            I
      ~                    (JlE1]      t::mE     ~1l                   ~        ~lI           llmE        ~0
                                       (Iffi1l   ~                     (JlE1)   ~             [liEt]       ~
                                                 ~                              ~                          ~
      1 _B_1               1.200       0.425         100               0.161        60        0.614           32

      1 _B_2               1.948       0.525         100               0.566        60        0.857           36

      1 _B_3               0.555       0.225         100                                      0.330           33

      1 _B_4               1.280       0.325         100               0.490        60        0.465           32

      1 _B_5               0.895       0.325         100               0.112        60        0.458           32

      1 _B_6               0.139                     100               0.139        60

      1_C_1                1.264       0.442         100               0.379        70        0.442           30

      1 _0_1               3.911       1.369         100               1.173        70        1.369           30

      1 _0_2               0.833                                       0.833        60

      1 _0_3               0.278                                       0.278        60

      1 _E_1               3.174       1.111         100               0.952        70        1.111           30




Northbrook Corporation Pty Ltd                             Version 2                                   29 November 2012

SMP_v2.docx                                       Commercial in Confidence                                     Page 14

Page 20

Noosa on Weyba
Stormwater Management Plan
                                                                                                    ~,.., Cardno@

    C!lll@11l1:OO     ~t::mE                    ~                                    ~                         (               I
      WilliE
                        (Jmtl         o:mt?J       [it9;ui3tiHDIlii        0lEn       lR9J iiDlJn      ~          ~gJllmlii
                                      (Jm1]         ~                      [Jffi1)     ~               (Jml)       ~
                                                    ~                                  ~                           [JQ]
       2_F_1            3.240         0.860             100                1.005          60           1.375          35

      2_G_1             8.273         2.666             100                1.995          60           3.612          30

      2_G_2             0.716                                              0.716          60

      3_H_1             0.607         0.212             100                0.182          60           0.212          30

      3_H_2             1.049         0.298             100                0.364          60           0.387          35

      3_H_3             1.963         0.618             100                0.476          60           0.869          36

      3_H_4             1.981         0.323             100                0.620          60           1.038          48

      3_H_5             1.190                                              1.190          60

       3_1_1            4.018         1.118             100                0.906          60           1.994          38

       3_1_2            2.891         0.723             100                0.596          60           1.572          42

       3_1_3            3.427         1.011             100                0.634          60           1.782          37

       3_1_4            5.242         1.226             100                1.707          60           2.309          39

       3_1_5            1.147         0.258             100                0.294          60           0.595          43

        4_K             0.665         0.150             100                0.154          60           0.361          43

        4_L             4.473         1.566             100                1.342          60           1.566          30




Area J is a large rural residential lot. The layout for this area has not yet been defined, but the developed
area    is likely to only take up     a   small   part of the area.          The most suitable treatment measures will be
determined when this area has been more clearly defined.                       It is likely that the most appropriate treatment
measures would         be rainwater tanks and vegetated swales.

Area A has not been included in the modelling as it is the renovation of an existing building. However, it is
recommended that larger rainwater tanks be installed in this area to reduce the potable water demand.


7.3                 Treatment Devices

7.3.1               Rainwater Tanks

The rainwater tanks         were   set up      using the Healthy Waterways MUSIC Modelling Guidelines.                  It   was

assumed that a 10 kL tank would be provided for each residential lot and a 5 kL tank would be provided for
each townhouse or retirement villa.      For the proposed apartment buildings a 120 kL tank was used.                         A

sensitivity analysis will be conducted to determine the impact of only providing half of this tank size.
The rainwater tank usage rates assumed that full water saving devices would be adopted (i.e. 21 LIp/day for
toilet flushing and 26 LIp/day for laundry).         The following occupancy rates were assumed:

>    2.8 people per residential lot;

>    2.0 people per townhouse or retirement villa; and

>     1 .7 people per apartment.

For outdoor uses it was assumed that 70 percent of the ground area would be irrigated at 548 mm/year,
which is the rate recommended for               private gardens (refer MUSIC Guidelines).              The   ground area was
assumed to be 300 m2 for premium residential lots and 235 m2 for standard residential lots.                      For the other

types of development the ground area was taken from the MUSIC model sub-catchment area. The outdoor
use was scaled by PET and rainfall. Therefore on days where there is sufficient rainfall no irrigation would

be applied.

The details of each rainwater tank are shown in Table 7-2.



Northbrook Corporation Pty Ltd                                 Version 2                                       29 November 2012

SMP_v2.docx                                           Commercial in Confidence                                          Page 15

Page 21

    Noosa on Weyba
    Stormwater Management Plan
                                                                                               ~,.., Cardno@
    Table 7-2        Rainwater Tank Details


     $f~I"I~                                         ~~

I                          I         ~~
                                     (J!
                                     170
                                                       ~
                                                       ~
                                                         1956.7
                                                                                ~00:1?l
                                                                                ~
                                                                                 2.237
            1_B_1

            1_B_2                    210                 2417.1                  2.764

            1_B_3                    90                  1035.9                  1.184

            1_B_4                    130                 1496.3                  1.711

            1_B_5                    130                 1496.3                  1.711

            1_C_1                    120                 1697.3                  4.000

            1_D_1                    415                 5251.1                  7.802

            1_E_1                    600                 4261.5                  11.280

            2_F_1                    400                 3604.0                  5.264

            2_G_1                    1240                11172.4                 16.318

            3_H_1                    60                   814.8                  1.128

            3_H_2                    140                 1611.2                  1.955

            3_H_3                    290                 3337.5                  4.042

            3_H_4                    150                 1351.5                  1.974

             3_1_1                   520                 4685.2                  6.843

             3_1_2                   350                 3153.5                  4.606

             3_1_3                   470                 4234.7                  6.185

             3_1_4                   570                 5135.7                  7.501

             3_1_5                   120                 1081.2                  1.579

             4_K                     60                   690.6                  0.790

              4_L                    500                 6005.4                  9.400




    7.3.2            Bio-retention Basins and Bio-retention Gardens

The bio-retention basins were set up using the Healthy Waterways MUSIC Modelling Guidelines. The filter
    area and   surface area were assumed to be the same, so as to allow for future changes in the batter design.
This is a conservative assumption as it underestimates the storage volume available. The indicative sizes of
the basins shown in Figures 3, 4 and 5 allow for a depth of 1 metre and a batter slope of 1 in 4. The bio-
    retention/detention basins assumed a depth of 1.5 metres. Sufficient area for coarse sediment forebays and
field inlets was also provided.

A saturated hydraulic conductivity of 200 mm/hr was assumed. This is typical of sandy loam filter media.
The TN content of the filter media             was   assumed to be 800 mg/kg.            The
                                                                          orthophosphate content was
    assumed to be 50 mg/kg. The bio-retention devices were assumed to be planted with effective nutrient
    removal plants.

A sensitivity analysis was conducted where the saturated hydraulic conductivity was reduced to 50 mm/hr, to
    determine the potential impact of filter blockage.

    No exfiltration was assumed.          The overflow width   was   assumed to be one tenth of the surface area as
    recommended by the guidelines.

The extended detention depth of the bio-retention basins was assumed to be 0.3 metres.                The extended
    detention depth for bio-retention gardens was assumed to be 0.15 metres.

The bio-retention gardens in each sub-area were combined into the one treatment node.


    Northbrook Corporation Pty Ltd                          Version 2                                29 November 2012

SMP_v2.docx                                          Commercial in Confidence                                Page 16

Page 22

Noosa on Weyba
Stormwater Management Plan
                                                                                        ~,.., Cardno@
The details of each bio-retention basin and bio-retention garden are shown below in Table 7-3.

Table 7-3       Bio-retention Basin and Bio-retention Garden Details


  ~ ~~                              ~                           ~~ ~ ~ ~
     mm               (JTIfi]           nIDil                    (lITO ~ ’iMttJ~ ~
                                                                              ~               (Jml             am)
                                 ~          ~
                                                                              (Jm)
                                 ~          ~
                                                ~
                                                 Bio-retention Gardens

     1_B_4             120        120               270               0.80     0.15            0.25            12.0

     1_C_1             120        120               270               0.80     0.15            0.25            12.0

     2_F_1             243        243               540               0.80     0.15            0.25            24.3

     2_G_1             558        558               1240              0.80     0.15            0.25            55.8

                                                    Bio-retention Basins

     1_B_1             110        110               350               0.60     0.30            1.00            11.0

     1_B_5             75         75                280               0.60     0.30            1.00             7.5

     1_D_1             370        370               720               0.80     0.30            1.00            37.0

     1_E_1             270        270               630               0.80     0.30            1.00            27.0

     3_H_3             180        180               460               0.60     0.30            1.00            18.0

     3_H_4             180        180               460               0.60     0.30            1.00            18.0

      3_1_1            350        350               690               0.60     0.30            1.00            35.0

      3_1_2            260        260               620               0.60     0.30            1.00            26.0

      3_1_3            300        300               680               0.60     0.30            1.00            30.0

                                          Bio-retention/Detention Basins                                                   I
      3_1_4            450        450               1640              0.60     0.30            1.50            45.0

      3_1_5            100        100               530               0.60     0.30            1.50            10.0

        4_L            400        400               1550              0.60     0.30            1.50            40.0




7.3.3           Bio-retention Swales

The bio-retention swales were set up using the Healthy Waterways MUSIC Modelling Guidelines.    They were
set up    as   two treatment nodes in
                                    series;     a   bio-retention node with   no   extended detention
                                                                                              depth and a
vegetated swale with a  low flow bypass equal to the filter media treatment rate. The vegetated swale was
assumed to be half the actual length as recommended by the guidelines.

The same filter media details as for the bio-retention basins were used.              The filter depth   was   typically
assumed to be 0.6 metres, but this can be made deeper if preferred to allow for the planting of trees.

The details of the MUSIC treatment nodes are shown in Table 7-4 and 7-5.




Northbrook Corporation Pty Ltd                            Version 2                                   29 November 2012

SMP_v2.docx                                     Commercial in Confidence                                        Page 17

Page 23

    Noosa on Weyba
    Stormwater Management Plan
                                                                                                           ~,.., Cardno@
    Table 7-4        Bio-retention Node Details


        Cil:f~ III ~i]J       ~~[Jnfb                      ~emEJ                    ~Bn                                     ~~

I          mmm
                          I                            I    [Inti]          I
                                                                            .
                                                                                                       ==
                                                                                                 I.~~~.I                     ~[JrQ]

            1 _B_2                   300                    300                     0.6                    0                    30.0

            1 _B_3                   140                    140                     0.6                    0                    14.0

            1 _D_2                   195                    195                     0.6                    0                    19.5

            2_G_2                    125                    125                     0.6                    0                    12.5

            3_H_1                     80                     80                     0.6                    0                     8.0

            3_H_2                    105                    105                     0.6                    0                    10.5

             4_K                      90                     90                     0.6                    0                     9.0




    Table 7-5        Swale Node Details

      ~                             ~                       l1m!l100!l!lJ       ~Wltm          ’i~              ~(JIT             ~
         mmm                                                                                    (lITO
                          ~
                                    (lTII}
                                                             .
                                                             0                                                                    ~
                                               ~
                          1lgJ’t1l             IlgJ’

         1 _B_2               50                 100           0.017               3.0            5.4                 0.3              1.5

         1 _B_3               70                 140           0.008               1.0            3.4                 0.3              1.4

         1 _D_2               195                390           0.011               0.5            4.1                 0.3              2.0

         2_G_2                125                250           0.007               0.5            4.1                 0.3              0.5

         3_H_1                80                 160           0.004               0.5            4.1                 0.3              0.5

         3_H_2                105                210           0.006               0.5            4.1                 0.3              2.0

          4_K                 45                  90           0.005               1.0            4.6                 0.3              0.5




    The actual widths of the bio-retention swales may be wider than shown in Table 7-5 to allow for appropriate

    battering.

    7.3.4            Vegetated Swales
    The details of the proposed vegetated swales are shown in Table 7-6.                         Vegetated swales were proposed in
    areas    considered       to be    too      steep for bio-retention swales            or   where    there   was    insufficient vertical
    differentiation for underdrainage to be installed. The batter slopes were assumed to be 1 in 6 as they are

    adjacent to roadways.
    Table 7-6        Vegetated Swale Details

      ~                             ~                       l1mw00!l!lJ         ~Wltmll        wm~              ~OIT              ~
         mmm                                                                                    Oim
                          ~
                                      [lri1}
                                                             .
                                                             (lITO                                                                ~
                                               ~
                          ~                    ~
         1 _B_6               65                 130            0.0                0.0            3.6                 0.3              3.0


         3_H_5                260                520            0.0                0.0            3.6                 0.3              0.5




    Northbrook Corporation Pty Ltd                                     Version 2                                            29 November 2012

    SMP_v2.docx                                              Commercial in Confidence                                                  Page 18

Page 24

Noosa on Weyba
Stormwater Management Plan
                                                                                    ~,.., [email protected]          Litter Baskets

Litter Baskets will be installed   on   all inlets discharging to downstream   waterways. They have not been
included in the MUSIC model, except for sub-catchment 1_D_3, which is the proposed culvert crossing of

Keyser Creek, where it is the sole treatment device. Other WSUD measures are not practical in this location,
which is the low-point of the road.

The litter basket was assumed to remove 100 percent of gross pollutants and 50 percent of total suspended
solids. No removal of nutrients was assumed.




Northbrook Corporation Pty Ltd                        Version 2                                29 November 2012

SMP_v2.docx                                    Commercial in Confidence                                Page 19

Page 25

   Noosa on Weyba
   Stormwater Management Plan
                                                                                                         ~,.., Cardno@

   8                  MUSIC Model Results


   8.1                Load Reduction

   The resultant load reduction with the proposed treatment train in place is shown in Table 8-1. The results
   show that the load reduction targets are met for all precincts. For the site as a whole the WQOs are easily
   met.

   Table 8-1          Pollutant Load Reductions


 [it1J1!I}J;1l                                                   [;trgjJ’G=WIbmlt!l ~f1" uw::D
                                                                                 ~                                                                I
                      ~                                                         ll’rm                                                   ~
                                                                                                                                           cmJ
                                 ID         C!l     [!)        [3          ~            @          rn     D          [3         [b
    Total             80.0      84.7       82.4    82.4       80.7       80.2       81.3          84.9   80.8       90.2       81.5       82.2
 Suspended
Solids (TSS)

    Total             60.0      64.5       63.0    62.1       63.7       61.1       61.8          67.1   62.4       67.9       63.0       63.2
Phosphorous
    (TP)
Total Nitrogen        45.0      53.0       46.3    52.8       57.5       45.8       45.1          48.2   55.7       45.5       56.5       51.9
    (TN)

    Gross             90.0      100.0      100.0   100.0      100.0      100.0      100.0        100.0   100.0     100.0      100.0       100.0
  Pollutants
    (GP)


   The developed         case   pollutant loads were also compared to the existing case.                   The results are shown in
   Table 8-2. The results show that the developed case pollutant loads are less than or equal to the existing
   case pollutant loads for all pollutants modelled. Therefore the proposed development provides                                          an

   improvement in stormwater quality being discharged from site, based on the pollutants modelled.
   Table 8-2          Comparison to Existing Case

                                                      1ft:1JJiIDC!h
                                                                                 ~{!hE
                                                                                 (  ,mm
          Total Suspended Solids (kg/yr)                   117000.0                     114640.0                 20435.0

                 Total Phosphorus (kg/yr)                    106.0                       228.3                    83.9

                  Total Nitrogen (kg/yr)                     814.0                       1258.5                   605.6

                 Gross Pollutants (kg/yr)                     0.0                       14264.0                    0.0




   It should be noted that only the developed areas of the site were modelled in MUSIC. The remaining areas
   will be designated as parks, buffer areas and conservation zones and rehabilitated and/or revegetated as

   appropriate.        As some of these areas are currently used for cattle grazing it is expected that the resultant
   stormwater quality from these areas will also improve.


   8.2                Sensitivity Analysis
   Several sensitivity analyses were run to determine the potential impact of filter media blockage; the impact of
   having only half the tank volume and the impact of connecting roof area to the bio-retention gardens, rather
   than directly to underground drainage. The results are shown Table 8-3.




   Northbrook Corporation Pty Ltd                                   Version 2                                              29 November 2012

   SMP_v2.docx                                             Commercial in Confidence                                                   Page 20

Page 26

Noosa on Weyba
Stormwater Management Plan
                                                                                                 ~,.., Cardno@
If the filter media     hydraulic conductivity reduces from 200 mm/hr to 50 mm/hr the WQOs are not met.
However, it should be noted that a significant reduction in pollutant loads, close to the WQO targets, is still
achieved and the resultant pollutant load would still be less than the existing case.  Proper maintenance of
the filter media will be required to ensure that the hydraulic conductivity does not significantly reduce over
time.

If only half of the tank size is implemented then the WQOs are still met for all pollutants, for the site as a
whole. Therefore if necessary, the QDC minimum size tanks could be adopted on site. It should be noted
that for Areas C, F, G and K the TN WQO is not met. It is therefore recommended that these precincts adopt
the larger tank sizes. The proposed tank sizes supply around 82 percent of the non-potable water demand.
If the tank sizes are halved this reduces to around 66 percent.             The larger tank sizes therefore supply an
additional 23 ML/yr of non-potable water.     Non-potable water demand is generally estimated to be around 65
percent of the total water demand. Therefore around 53 percent of the total water demand of the site can be
supplied by rainwater tanks. It is therefore recommended that the proposed larger tank sizes be maintained
so that the water demand of the site is minimised. It should be noted that irrigation of park areas outside of

the precinct areas has not been assumed in the MUSIC modelling. The larger tank sizes will potentially also
allow for irrigation of these areas, therefore further reducing the water demand of the site.

The proposed bio-retention gardens will have the rainwater tank overflow directly connected to underground

drainage. This was found to improve the efficiency of the bio-retention gardens as it allows them to better
treat the runoff from the road and  ground nodes. A sensitivity analysis was conducted to determine the
impact  of having rainwater tank overflow draining to the kerb. The results show that for the site as a whole
that the WQOs are still met. For the effected precincts there was a reduction in the removal of TSS and TP
below the WQO and an improvement in the TN removal. It is therefore recommended that these areas
maintain the direct connection to underground drainage. However, if this is not possible in some areas, the
WQOs for the site as a whole are still met if tank overflow is directed to the kerb.

Table 8-3         Sensitivity Analysis Results

                  ~                                                 ma g~i ru c:wl!mml ~i uNA D
                                                                                .
                                                                                             I


                                                                                                                             I
                                           wm!l           ~ ~~                                   mrrn~       ~mID
                                                             ~               @ll’iIim:IDi1        rID         @:rl!l:H""     I
     Total Suspended Solids (TSS)           80.0              82.2              77.5               81.7          80.8

        Total Phosphorous (TP)              60.0              63.2              59.2               62.1          62.6

              Total Nitrogen (TN)           45.0              51.9              42.5               49.9          53.3

          Gross Pollutants (GP)             90.0             100.0              100.0             100.0         100.0




The impact of community education, bio-retention tree pits, litter baskets, buffer areas and rehabilitation of
the waterway corridors has not been included in the MUSIC modelling, unless stated otherwise. Therefore
the MUSIC results are a conservative assessment of the improvement in stormwater quality that can be
achieved on site.


8.3               Frequent Flow Objective
The developed area of the site is 56.36 hectares, and is on average 62.5 percent impervious. The first 15
mm    of runoff from impervious surfaces is therefore 5.28 ML/day. Based on the 10 years of rainfall data used
in the MUSIC modelling, the average annual runoff from the first 15mm of runoff from impervious surfaces is

equivalent to 317.2 ML/year. The total average annual runoff was 607.8 ML/year.
The MUSIC model was used to determine how much of the runoff was being treated by the bio-retention
basins and swales.         The rainwater tanks were removed from the modelling, so that there were no other
outflows.       The amount of runoff being treatedby the bio-retention basins and swales alone was 364.7
ML/year. This is greater than the amount of runoff generated from the first 15mm of rainfall from impervious
surfaces, and therefore the frequent flow objectives are met.




Northbrook Corporation Pty Ltd                          Version 2                                         29 November 2012

SMP_v2.docx                                      Commercial in Confidence                                         Page 21

Page 27

Noosa on Weyba
Stormwater Management Plan
                                                                                          ~,.., Cardno@
The proposed rainwater tanks have             a   total volume of 6.375 ML.     The daily usage is on average 0.282

ML/day,       or   103.1   ML/year.   The proposed tanks supply around 84.5 ML/year of this non-potable demand.
Therefore the total flow being treated or removed will be greater than that modelled without the rainwater
tanks in place.


8.4                Waterway Stability
The waterway stability objective is met as the peak flows from the site have been reduced to existing case
levels for all ARI events up to and   including the 100 year ARI event (refer Flood Study, Cardno, October
2012). This is due to the attenuation being provided by the proposed road crossings and detention basins.
The attenuation provided by the rainwater tanks and bio-retention basins was not included in this analysis.
Therefore the attenuation, particularly for minor events, will likely be greater than reported.

Bio-retention basins and rainwater tanks provide some attenuation of minor peak flows, typically up to the 2

year ARI event. The outlets of the bio-retention basins and gardens should have adequate scour protection
installed to prevent downstream erosion.




Northbrook Corporation Pty Ltd                              Version 2                                29 November 2012

SMP_v2.docx                                          Commercial in Confidence                                Page 22

Page 28

Noosa on Weyba
Stormwater Management Plan
                                                                                          ~,.., Cardno@

9              Conclusion

Due to the ecologically sensitive location of the site, appropriate stormwater quality treatment is of the

upmost importance. For this reason the best available stormwater treatment measures have been proposed.
The proposed WSUD strategy for the site includes:

>   Community education.
>   Reducing potable water demand through use of water efficient devices and appliances
>   Large rainwater tanks (around twice the QDC size requirements) connected to all practically available
    roof area to maximise rainwater harvesting, reduce stormwater flows and reduce potable water demand.

>   Bio-retention basins.

>   Bio-retention gardens within the road reserve.

>   Bio-retention tree pits within the road reserve.

>   Bio-retention swales.

>   Vegetated swales.
>   Litter baskets.

>   Buffer areas.

>   Revegetation and rehabilitation of Lake Weyba buffer area.
>   Rehabilitation of Keyser Creek waterway corridor.

>   Reticulated water and sewerage, which will minimise the risk of contaminants from effluent                  being
    discharged into Lake Weyba.
The proposed development will maximise the use of alternative sources of water. The proposed rainwater
tanks will be able to provide around 82 percent of the non-potable water demand and around 53 percent of
the total water demand of the site.

MUSIC modelling has shown that the water quality objectives and frequent flow objectives for the site can be
met.     The reduction in        pollutant loads being   achieved     by the proposed   stormwater treatment train is

significantly greater than the reduction typically provided by standard residential developments.
The resultant pollutant loads from developed areas of the site are less than those resulting from the existing
rural use of these areas. Other areas of the site will be converted from rural uses to park areas and densely

vegetated areas will become designated conservation areas, and rehabilitated as required. Therefore the
overall stormwater quality being discharged from the site will likely be improved, and there will not be an

impact on the water quality of Lake Weyba.

Regular water quality monitoring will be used to ensure that stormwater being discharged from site is of
suitable quality.




Northbrook Corporation Pty Ltd                            Version 2                                   29 November 2012

SMP_v2.docx                                       Commercial in Confidence                                    Page 23

Page 29

Noosa on Weyba




Figure 1 Site Location
Figure 2 Sub-catchments
Figure 3 Proposed Stormwater Treatment
        -Areas A to G

Figure 4 Proposed Stormwater Treatment
        -
          Areas H and I

Figure 5 Proposed Stormwater Treatment
        -
          Areas J to L




                                         <.J., Cardno@
                                              Shaping the Future

Page 30

NOOSA ON WEYBA
STORMWATER MANAGEMENT PLAN
                                                                                                                                               <._Dc:ardn

                                                                                                                                                         ~
                                                                                                                                                   ~




                                                                                                                                                   LEGEND


                                                                                                                                                   c:J       Site boundary




                                                                                                                                                    NP




                                                                                                                                                                   NP




                                                                                                                                               Stradbroke Island
                                                                                                                                               h
Aerial image soreed from GoogleEarth
                                                                                               250    250   500   750   1000   1250m
                                                                                                ---                              I   125,000
@ Cardno (Old)Pty Lid All Rights Reserved 2012                                                                                                           Scale 1 :25,000 (A3)
Copyright in the whole and every part olthis drawing belongslo Cardno (Old)Ply LId and
may not be used, sold, transferred, copied or reproduced in whole orin partin any manneror
form   or on   any media, to any person olher than   by agreemenlwilh Cardno (Old)Ply Ltd.                                                                    FIGURE                        1
This document is produced      by Cardno (Old) Ply LId solely forthe benefit of and useby
the client in accordance wilh the terms ofllle relainer.Cardno (Qld)Pty LId doesno\
and shall not assume any responSibility orliabilily whalsoeverloany thrd party arising auto!                                                   SITE LOCATION
any use orreliance by Il’Iird party on tl’lecontenloftl’lisdocumenl.


Rev: 0 I Drawn: J.M.I Checked: N.G,I Date: 23/10/2012                                                                                                     Project No.:       5101/19/3
                                                                                                                                                         PRINT DATE: 240dober, 2012       11:00am
Northbrook Corporation Pty Ltd
                                                                                                                                                                                      -




CAD FILE: 0:\5101-19-03\Figures\R3vl SMP\Figure I        -   Site lo<ation.dwg
XREF’s: OC08; site

Page 31

NOOSA ON WEYBA
STORMWATER MANAGEMENT PLAN
                                                                                                          <._Dc:ardn




       LEGEND


       c:J Site boundary
                         Sub-catchment boundary


                         1m contour                                                                                                      /)



                                                                                               75    75   150   225       300        375m
                                                                                               ...                                          17500

@ Cardno (Old)Pty Lid All Rights Reserved 2012                                                                        Scale 1 :7,500 (A3)
Copyright in the whole and every part olthis drawing belongslo Cardno (Old)Ply LId and
may not be used, sold, transferred, copied or reproduced in whole orin partin any manneror
form   or on   any media, to any person olher than   by agreemenlwilh Cardno (Old)Ply Ltd.                             FIGURE 2
This document is produced      by Cardno (Old) Ply LId solely forthe benefit of and useby
the client in accordance wilh the terms of the relainer.Cardno (Old)Ply LId does not
and shall not assume any responSibility orliabilily whalsoeverloany thrd party arising auto!         SUB-CATCHMENTS
any use orreliance by Il’Iird party on thecontentofthisdocument.


Rev: 0 I Drawn: J.M.I Checked: N.G.I Date: 9/10/2012                                                                  Project No.:     5101/19/3
                                                                                                                  PRINT DATE: 26 November, 2012       5:10pm
North broo k Co rp Pty Ltd and J& K Holm ann
                                                                                                                                                  -




CAD FILE: O:\5101-19-03\Figures\R3v2 SMP\Figure 2         -   Sub-catchmenls. wg
XREF’s: 0(08; dev_plan; site; WQ_c<ltchments_2410

Page 32

NOOSA ON WEYBA
STORMWATER MANAGEMENT PLAN
                                                                                                                                                          <._Dc:ardn

                                                                                                                                                                    ~
                                                                                                                                                                 ~




                                                                                                                                                          LEGEND


                                                                                                                                                          c=J Site boundary
                                                                                                                                                                   Sub-catchment boundary



                                                                                                                                                          <Q>     Detention/bio-retention basin



                                                                                                                                                          <Q>     Bio-retention basin



                                                                                                                                                          -       Blo-retentlon Swale



                                                                                                                                                          -

                                                                                                                                                                  Vegetated Swale
                                                                                                 Rehabilitated
                                                                                               DJWaterway
                                                                                                 Co rrid 0r




                                                                                                                                             40      40     80      120          160         200m
                                                                                                                                              ---                                                14000

@ Cardno (Old)Pty Lid All Rights Reserved 2012                                                                                                                            Scale 1 :4,000 (A3)
Copyright in the whole and every part olthis drawing tlelongslo Cardno (Old)Ply LId and
may not be used, sold, transferred, copied or reproduced in whole orin partin any manneror
form   or on   any media, to any person other than   by agreemenlwilh Cardno (Old)Ply Ltd.                                                                            FIGURE 3
This document is produced      by Cardno (Old) Ply LId solelyforthebenefitofand useby
the client in accordance with the terms of the relainer.Cardno (Qld)Pty LId doesnol
and shall not assume any responSibility orliabilily whalsoeverloany thrd party arising auto!                     PROPOSED   S TOR M W ATE R T REA T MEN T   -
                                                                                                                                                                 ARE A S A to G
any use orreliance by third party on thecontentofthisdocument.


Rev: 0 I Drawn: J.M.I Checked: N.G.I Date: 26/11/2012                                                                                                                      Project No.:        5101/19/3
                                                                                                                                                                          PRINT DATE: 26 November. 2012       4:59pm
North broo k Co rp Pty Ltd and J& K Holm ann                                                                                                                                                              -




CAD FILE: 0:\5101-19-03\Figures\R3v2 SMP\Figure 3         -
                                                              Proposed rreatment A to G.dwrg
XREF.s: 0(08; dev_plan; site; WQ_catchments_0910; WU_devices_0910; WQ_catchments_2410

Page 33

NOOSA ON WEYBA
STORMWATER MANAGEMENT PLAN
                                                                                                                                  <._DCardn
/


                                                                                                                                            ~
                                                                                                                                         ~

                   "J

                  o              \)
~
               ~


r
o




                                                                                                                                  LEGEND
                    17


                                                                                                                                  c=J Site boundary
                                                                                                                                           Sub-catchment boundary



                                                                                                                                  <Q>    Detention/bio-retention basin



                                                                                                                                  <Q>    Bio-retention basin



                                                                                                                                         Blo-retentlon Swale



                                                                                                                                  -

                                                                                                                                         Vegetated Swale




                                                                                                                             40     80      120          160         200m
                                                                                                                                                                       I 14000

@ Cardno (Old)Pty Lid All Rights Reserved 2012                                                                                                    Scale 1 :4,000 (A3)
Copyright in the whole and every part olthis drawing tlelongslo Cardno (Old)Ply LId and
may not be used, sold, transferred, copied or reproduced in whole orin partin any manneror
form   or on   any media, to any person olher than   by agreemenlwilh Cardno (Old)Ply Ltd.                                          FIGURE 4
This document is produced      by Cardno (Old) Ply LId solelyforthebenefitofand useby
the client in accordance with the terms of the relainer.Cardno (Old)Ply LId does not
and shall not assume any responSibility orliabilily whalsoeverloany thrd party arising auto!   PROPOSED   STORMWATER TREATMENT -AREAS H and I
any use orreliance by third party on Iheconlenloflhisdocument.


Rev: 0 I Drawn: J.M.I Checked: N.G.I Date: 26/11/2012                                                                                              Project No.:        5101/19/3
                                                                                                                                                  PRINT DATE: 26 November, 2012       5:02pm
North broo k Co rp Pty Ltd and J& K Holm ann                                                                                                                                      -




CAD FILE: O:\5101-19-03\Figures\R3v2 SMP\Figure l.        -
                                                              Proposed Treatment Hand Ldlo’g
XREF’s: 0(08; dev_plan; site; WQ_catchments_0910; WU_devices_0910; WQ_c<ltchments_2410

Page 34

NOOSA ON WEYBA
STORMWATER MANAGEMENT PLAN
                                                                                                                                                          <._Dc:ardn
                                                                                                ~
                                                                                                                                                 o
                                                                                                                                                                    ~
                                                                                                                                                                 ~



                                                                                                     /JD       <)




                                                                                                      C>




                                                                                                     9     o




                                                                                                                                                          LEGEND


                                                                                                                                                          c=J Site boundary
                                                                                                                                                                   Sub-catchment boundary



                                                                                                                                                          <Q>    Detention/bio-retention basin



                                                                                                                                                          <Q>    Bio-retention basin



                                                                                                                                                                 Blo-retentlon Swale



                                                                                                                                                          -

                                                                                                                                                                 Vegetated Swale




                                                                                                ()




                                                                                                                                            40       40     80      120          160         200m
                                                                                                                                            ---                                                I 14000

@ Cardno (Old)Pty Lid All Rights Reserved 2012                                                                                                                            Scale 1 :4,000 (A3)
Copyright in the whole and every part olthis drawing tlelongslo Cardno (Old)Ply LId and
may not be used, sold, transferred, copied or reproduced in whole orin partin any manneror
form   or on   any media, to any person olher than   by agreemenlwilh Cardno (Old)Ply Ltd.                                                                          FIGURE 5
This document is produced      by Cardno (Old) Ply LId solely forthe benefit of and useby
the client in accordance with the terms of the relainer.Cardno (Old)Ply Ltd does nol
and shall not assume any responSibility orliabilily whatsoevertoany thrd party arising auto!                    PROPOSED   S TOR M W ATE R T REA T MEN T     -
                                                                                                                                                                 ARE AS J to L
any use orreliance by third party on Iheconlenloflhisdocument.


Rev: 0 I Drawn: J.M.I Checked: N.G.I Date: 26/11/2012                                                                                                                      Project No.:        5101/19/3
                                                                                                                                                                          PRINT DATE: 26 November, 2012       5:04pm
North broo k Co rp Pty Ltd and J& K Holm ann                                                                                                                                                              -




CAD FILE: O:\5101-19-03\Figures\R3v2 SMP\Figure 5         -
                                                              Propo!;ed rreatment J to L.dYlg
XREF’s: 0(08; dev_plan; site; WQ_catchments_0910; WU_devices_0910; WQ_catchments_2410

Page 35

Noosa on Weyba




                 ~,..,Carcln
                      Shaping the Future
                                           @


[OCR of page images]
Noosa on Weyba

 

APPENDIX

Concept Masterplan

 

cJy Cardnoa

Shaping the Future

 

Page 36

I                                                                                                                                                                                                                                                                                                                                                  I




                                                                                              ,    ’




                                                                                                  ,.
                                                                                                               .,.




                                                           ,   I




                                                                                     I   I
                                                                               I     r



                                                                   I

                                                               .;.
                                                                                                                                                                                                                                                                                                                             \’




                                                                                                                                                                                                                                                                                                                                  ,


                                                       I
                                                   .




                                                                                                                                           L__-...._..,



                                                                                             ~                                                                L                                                                                                 \
                                                                                                                                                                                                                                                                   I

                                                                                                                                                                                                                                                                   \

                                                                                                                                  (                                                                                                                                    \
                                                                                                                                       -t
                                                                                                                                                                                                                                                                            Legend
                                                                                                                                       ~                                                                                                                                    [===:J Noosa on Weyba Site Boundary
                                                                                                                                                                                                                                                                                 -::::::I Open Space Conservation Zone


                                                                                                                                       l
                                                                                                                                      ,~
                                                                                                                                                                                                                                                                            _ Precinct 1

                                                                                                                                                                                                                                                                            r        Precinct 2

                                                                                                                                                                                                                                                                            [c::     Precinct 3




                                                   ’~                                                                             rf                                                                                                                                        Ii       . Precinct 4




                                                                                                                                                                                                                                                                                            -
                                                                                                                                                                                                                                NOOSA ON WEYBA                                                                   -
                                                                                                                                                                                                                                                              ~/       ~~                      ..


                                                                                                                                                                                         NORTH BROOK CORP PTY LTO AND J & K HOFMANN
                                                                                                                                                                                                                                                              I1~00/Sa
                                                                                                  .PRECINCT PLAN
                                                                                                                                                                                                                                                                   on   weyba          -
                                                                                                                                                                                                                                                                                                                        Design
                                                                                                                                                                                                                                                                                                    -
    MlDesignPtyltd                                                                                         0         SO.O   100                                                                                                                                                        architecture I master planning I urban design I interior design
    ACN100492304                                                                               ~
    ABN   89159048228


    Plot Date: 23il1/2()12
                                                                                               "V~                                             SCALE-1:10000@A3   APPROVED FOR ISSUE:_      23/11/2012@ ML Design Ply. Ltd.   JOB NO: NORT0001   MP-006-[D]                                    -
                                                                                                                                                                                                                                                                                                        .

L   File Path:   P:INORTOOO1_Lake Weyba’B_Oocumentation\81~Production\81_Drawings\ArchiCAD\Layoots\NORTOOO1_Layoul.pIn
                                                                                                                                                                                                                                                                                                                                                   _j

Page 37

Noosa on Weyba




                 CJ,.., Carclno@
                       Shaping the Future


[OCR of page images]
Noosa on Weyba

 

APPENDIX

Water Quality Monitoring Of Lake Weyba

 

cJy Cardno’

Shaping the Future

 

Page 38

                                            Beach




Legend                     MAROOCHY RIVER
                             CATCHMENT
’\._   Catchment border

’-, Sub-catchment border
.
State fo rest

Protected areas
.
.
Urban areas

o Estuarine/marine sites
o Freshwater sites

Page 39

                                                                                                                                                        <..J") Carclno

              Table B 1            Healthy Waterways lake Weyba Water Quality Monitoring 2002                         -
                                                                                                                          2012

                                          Susp-                                                                                   Total
                                                           Choloro-        Total     Oxidised      Ammonia     Organic                                                    Secchi
                                          ended                                                                                   Phos-     FRP        DO
                     Turbidity                              phyll a       Nitrogen      N              N             N                                         pH         Depth
                                          Solids                                                                                 phorous    (l1gfL)   (%sat)
                                                             (l1gfL)       (l1gfL)    (l1gfL)        (l1gfL)       (l1gfL)                                                 (m)
                                          (mgfL)                                                                                  (l1gfL)
                                                                                                Lake Weyba 1624

      Max                78.0                n/a               6.7         1789.2     367.8          546.7         1780.3         43.6       9.9      158.0    8.5          1.5

      80%)               14.0                n/a                2.3        487.1       9.9           60.0          381.7           16.9      1.9      109.1    8.2          1.0

      50%)                6.0                n/a                1.3        328.0       2.0           23.4          299.2           10.9      1.9       99.9    8.0          0.2

     20010                2.5                n/a                0.8        278.3       2.0            8.9          241.5           7.9       1.9       91.9    7.8          0.2

      Min                 0.0                n/a                0.3        149.1       2.0            2.0          70.6            4.0       1.9       75.4    6.2          0.2

                                                                                                Lake Weyba 1625

      Max               277.0                n/a                9.5        934.4      328.0          516.9         884.7          228.2     178.6     152.1    8.5          1.0

      80010              20.0                n/a                3.2        497.0       10.9          83.5          403.6           17.9      1.9      106.6    8.2          1.0

      50010              11.0                n/a                2.0        367.8       2.0            15.9         342.0           11.9      1.9       98.8    8.0          0.2

     20010                5.0                n/a                0.9        278.3       2.0            4.0          259.5           7.9       1.9       91.4    7.8          0.2

      Min                 1.0                n/a                0.3        198.8       2.0            2.0          178.9           4.0       1.9       68.5    6.5          0.2

                                                                                                Lake Weyba 1626

      Max                90.0                n/a                9.2        994.0      526.8          566.6         781.3          327.4     267.8     139.8    8.6          1.5

      80010              22.0                n/a                3.1        516.9       9.9           119.3         384.7           16.9      1.9      106.8    8.2          1.0

      50010              12.0                n/a                1.9        367.8       2.0            11.9         325.1           10.9      1.9       97.5    8.0          0.2

     20010                5.0                n/a                1.0        288.3       2.0            4.0          264.4           8.9       1.9       92.0    7.8          0.2

      Min                 0.0                n/a                0.1        198.8       2.0            2.0           7.0            4.0       1.9       44.2    6.7          0.2

                                                                                                Weyba Creek 1611                                                                    I
      Max                58.0                n/a               6.0         586.5       39.8          159.0         971.1           66.5      4.0      130.7    8.4          3.5

      80010              10.0                n/a                2.4        347.9       8.7            36.8         301.2           16.9      1.9      103.9    8.2          1.5

      50010               6.0                n/a                1.4        278.3       4.0            17.4         242.5           12.4      1.9       96.2    8.1          0.2

     20010                3.0                n/a                0.9        208.7       2.0            9.9          187.9           8.9       1.9       89.6    7.9          0.2

      Min                 1.0                n/a                0.4        139.2       1.8            3.0          129.2           4.0       1.6       65.1    6.3          0.2



North brook Corporation Pty Ltd                                                                                                                                      29 November 2012
0:\51 01-19-03\wp\R3v2 SMP\Appendices\AppB_2 WQ Monitoring Summary.docx                                                                                                       Page 1


[OCR of page images]
Cc Cardno

 

Table B1 Healthy Waterways Lake Weyba Water Quality Monitoring 2002 - 2012

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Susp- 7 : : Total A
rurbicty | 289° | “Shyla | nitrogen | WN | N | ww | Phos | FRE | DO | oy | Depth
(mgt) | #9) | wot) | wot) | wot) | wot) | Poor (m)
Lake Weyba 1624
Max 78.0 n/a 6.7 1789.2 367.8 546.7 1780.3 43.6 9.9 158.0 8.5 1.5
80% 14.0 n/a a3 487.1 9.9 60.0 381.7 16.9 1.9 109.1 8.2 1.0
50% 6.0 n/a 1.3 328.0 24 23.4 299.2 10.9 1.9 99.9 8.0 o2
20% 2.5 n/a 0.8 278.3 2.0 8.9 241.5 7.9 1.9 91.9 7.8 0.2
Min 0.0 n/a 0.3 149.1 2.0 2.0 70.6 4.0 1.9 75.4 6.2 0.2
Lake Weyba 1625
Max 277.0 n/a 9.5 934.4 328.0 516.9 884.7 228.2 178.6 152.1 8.5 1.0
80% 20.0 n/a 22 497.0 10.9 m4 403.6 17.9 1.9 106.6 8.2 1.6
50% 11.0 n/a 2.0 367.8 2.0 15.9 342.0 11.9 14 98.8 8.0 0.2
20% 5.0 n/a 0.9 278.3 2.0 4.0 259.5 7.9 1.9 91.4 7.8 0.2
Min 1.0 n/a 0.3 198.8 2.0 2.0 178.9 4.0 1.9 68.5 6.5 0.2
Lake Weyba 1626
Max 90.0 n/a 9.2 994.0 526.8 566.6 781.3 327.4 267.8 139.8 8.6 1.5
80% 22.0 n/a 3.1 516.9 9.9 119.3 384.7 16.9 1.9 106.8 8.2 1.0
50% 12.0 n/a 1.9 367.8 2.0 11.9 325.1 10.9 1.9 97.5 8.0 0.2
20% 5.0 n/a 1.0 288.3 2.0 4.0 264.4 8.9 1.9 92.0 7.8 0.2
Min 0.0 n/a 0.1 198.8 2.0 2.0 7.0 4.0 1.9 44.2 6.7 0.2
Weyba Creek 1611
Max 58.0 n/a 6.0 586.5 39.8 159.0 971.1 66.5 4.0 130.7 8.4 3.5
80% 10.0 n/a 2.4 347.9 8.7 36.8 301.2 16.9 1.9 103.9 8.2 1.5
50% 6.0 n/a 1.4 278.3 4.0 17.4 242.5 12.4 1.9 96.2 8.1 0.2
20% 3.0 n/a 0.9 208.7 2.0 9.9 187.9 8.9 1.9 89.6 7.9 0.2
Min 1.0 n/a 0.4 139.2 1.8 3.0 129.2 4.0 1.6 65.1 6.3 0.2
Northbrook Corporation Pty Ltd 29 November 2012

©:\5101-19-03\wp\R3v2 SMP\Appendices\AppB_2 WQ Monitoring Summary.docx Page 1

Page 40

                                                                                                                                                  <..J") Carclno
                                          Susp-                                                                              Total
                                                           Choloro-        Total       Oxidised   Ammonia     Organic                                                Secchi
                                          ended                                                                              Phos-     FRP        DO
                     Turbidity                              phyll     a   Nitrogen        N           N           N                                       pH         Depth
                                          Solids                                                                            phorous    (l1gfL)   (%sat)
                                                             (l1gfL)       (l1gfL)      (l1gfL)     (l1gfL)    (l1gfL)                                                (m)
                                          (mgfL)                                                                             (l1gfL)
                                                                                     Average of 1624, 1625, 1626 and 1611
      Max               125.8                n/a                7.8        1076.0       315.6       447.3      1104.4        166.4     115.1     145.2    8.5          1.9

      80%)               16.5                n/a                2.7        462.2         9.9        74.9        367.8         17.1      1.9      106.6    8.2          1.1

      50%)                8.8                n/a                1.7        335.5         2.5         17.1       302.2         11.5      1.9       98.1    8.0          0.2

     20010                3.9                n/a                0.9        263.4         2.0         6.7        238.3         8.4       1.9       91.2    7.8          0.2

      Min                 0.5                n/a                0.3        171.5         1.9         2.2        96.4          4.0       1.8       63.3    6.4          0.2

                                                                                           Water Quality Objective

      80010               8.0               20.0                2.5        380.0         15.0       32.0        320.0         16.0      2.0      105.0    8.3          2.0

      50010               5.0               20.0                1.5        240.0         5.0         15.0       210.0         13.0      2.0       95.0    8.2          1.6

     20010                2.0               20.0                0.8        150.0         2.0         7.0        130.0         10.0      2.0       85.0    8.0          1.1
# Sourced from Healthy Waterways Ecosystem Health Montformg Program
# Bolded average values do not meet WQO
# If recorded data was at the test threshold assumed to be value equal to test threshold




North brook Corporation Pty Ltd                                                                                                                                 29 November 2012
0:\51 01-19-03\wp\R3v2 SMP\Appendices\AppB_2 WQ Monitoring Summary.docx                                                                                                  Page 2

Page 41

Noosa on Weyba




                 ’-f)Cardn
                     Shaping the Future
                                          @


[OCR of page images]
Noosa on Weyba

 

APPENDIX

Community Information Leaflet

 

cy Cardna

Shaping the Future

 

Page 42

Stormwater Quality
                                                                                           nFb           sa
and the Community                                                                                on    weyba
Working at the continual im-
provement of stormwater quality
                                                                                           Clean
will help to protect the natural

environment and ensure that         .
                                                                                           Stormwater
Noosa on Weyba remains a

beautiful place in which to live.
                                         .
                                                                                           Strate
                                     ~
                                             f"-
                                    I_   ..._,



Using the helpful and practical
                                     j
tips provided, every member of                     "C



the community can make a sig-                           ....
                                                                                           What is already being done and
nificant contribution to the on-         ,,_
                                                        I’                                 what you can do to help.

going best practice stormwater           r’(       ~
                                         ~




quality treatment at Noosa on
Weyba.




                                                               <..r., CSh ~~h dF     no
                                                                          apmg t e uture

Page 43

                                                                                       What is          being provided?

nlo sa                                                                                The stormwater quality treatment train employs a range of
                                                                                       innovative measures to ensure the best results. These in-
                                                                                                                                                            What      can       You     do?
                                                                                                                                                            Eliminating the source of pollutants is the most effec-
      on    weyba                                                                      clude:                                                               tive method of stormwater quality management.


Nooso on Weybo & You                                                             "’.            1 0 kilolitre rainwater tanks for each residential lot.     These are some easy steps that you can take to en-
                                                                            ~/,
                                                                                 ...,           (This is more than twice the requirement of Queens-         sure you are   contributing to the sustainable nature of
                                                                                                                                                            Noosa on Weyba:
                                                                             ~~.                land Development Code)

Noosa on Weyba is an environmentally friendly residen-                                .\ ~      Bio-retention street trees and bio-retention gardens
                                                                                  -
                                                                                                                                                            .      Minimise use of chemical cleaning products,
                                                                                       ~
tial and retirement living development. It is situated on                         ~, .1         incorporated into the road reserve                                 particularly outdoors.
Lake Weyba which is a Fish Habitat Reserve and sur-
                                                                                  ’.            Bio-retention basins
rounded by Noosa National Park. Due to the close                                           \                                                                .      Service motor vehicles regularly and look for
proximity of these natural ecosystems, it is important to             ,
                                                                                  ’.            Vegetated bio-retention swales                                     signs of leaking oil. brake fluid or other chemi-
                                                                           ’_.../
ensure that   everything possible is being done to im-                                                                                                             cals
                                                                                      .1        Litter baskets
prove the ecological footprint of the community.

As part of the sus-
                                                                  "._,..     f
                                                                           ..,
                                                                                                Natural wetland
                                                                                                                                                            .      Wash motor vehicles on lawn or in car wash-
                                                                                  I.....
                                                                  /~                            areas
                                                                                                                                                                   ing bays.
tainable design of                                                               ’rt
                                                              ).
                                                              ~
                                                                      J      "         -




Noosa on Weyba,                                                    ~i’1_/             ;-        Buffers to envi-                                            .      Minimise use of fertilizers and avoid applying
best practice water
                                                                                                ronmentally                                                        pesticides to plants and gardens, especially if
sensitive urban de-                                                                             sensitive areas                                                    rain is expected.
sign (WSUD)
                                                                                      These state of the art storm-      A bio-retention garden
measures have
                                                                                                                                                            .
                                                                                                                                                                   Sweep up and compost garden waste.
                                                                                       water quality improvement
been adopted. This                                                                                                                                                 Dumping of green waste along creeks or
                                                                                       devices work as an integrated, sustainable system in order
is to help ensure                                                                                                                                                  down the drain spreads weeds and promotes
                                                                                       to produce high quality stormwater in compliance with the
that runoff is treated                                                                                                                                             algal growth.
                                                                                      South East Queensland Healthy Waterways Guidelines.
                          Noosa on Weyba is an
to the best possible
                                                                                                                                                            .      Ensure all house-
quality before it is      ecologically sensitive area                                  Bio-retention               systems
                                                                                                                                                                   hold rubbish is
discharged from site.                                                                  Bio-retention systems are particularly efficient in removing
                                                                                                                                                                   properly disposed
Even with such efficient stormwater quality treatment in                               pollution from stormwater run-off. Water ponds over the
                                                                                                                                                                   of.
place further improvements can be made by eliminat-                                    vegetated surface and slowly infiltrates through the under-

ing the sources of pollution. Individuals throughout the                               lying filter media. The plants and filter media are specifical-      .      Never dispose of

community have an important role in improving storm-                                                                           ly chosen to ensure high            chemicals down
                                                                                                                               levels of nutrient remov-           the stormwater
                               water quality and general
                                                                                                                               al. Sediments and litter            drain.
                               environmental health.
                               There are a number of
                                                                                                                               remain in the forebay
                                                                                                                                                            .      Plant native, ground
                                                                                                                                                                                             Waterwise gardens
                                                                                                                               area for easy   disposal.
                               simple and easy ways to
                                                                                                                               Treated stormwater is               covering plant spe-       prevent soil erosion
                               ensure that each house-
                                                                                                                               then discharged down-               cies and mulch to
                               hold can contribute to
                                                                                                                               stream.   Any excess                prevent soil erosion and conserve water
                               protecting their local envi-
                                                                                                                               litter will be captured by
                                           ronment.
                                                                                                                               the litter baskets.
                                                                                                                                                            .      Dispose of pet droppings by sealing them in a
   Sweeping up leaves is one easy                                                                                                                                  bag and depositing into a waste bin
                                                                                           The Bio-retention process
   way to improve storm water quality

Page 44

Noosa on Weyba




                 <..f)Cardn
                     Shaping the Future
                                          @


[OCR of page images]
Noosa on Weyba

 

APPENDIX

Underground Rainwater Tank Example

 

CcJ> Cardna

Shaping the Future

 

Page 45

                                                                                                                                                                     TAP
                                                                                                                                                                           OUTSIDE
                                                                                                                                                                     ~
                                                                                                  RE-USE                                          we
                                                                                                   WATER
                                                                                                  PUMPED   ~




                               Concret                                                            FROM
                                                                                                                                                   LAUNDRY
                                                                                                           Lb-U~                                                                                                                                            For
                 on
                                                                                                   AWC
                 Base Locking
                 Course Ring
                 of
                                 with
                 Blue min. Cut-of Pump Conduit
                                              Submersil
                                                                                DeHv’)                     ~
                                                                                                                                                  (I)""0       -g.

                                                                                                                                                                     ~     ~~
                                                                                                                                                                                                                                                        w.actionksmu ~Jif
                                                                                                                                                                                                                                                         technial
                                                                                                                                                                                                                                                         enquires
                                                                                                                                                                                                                                                           call
                                                                                                                                                                                                                                                           1800
                                                      and to                                                                                                                                                                                               066
                 Crushed 20 m Float AWC Electrial                                 Pipe                                                                                                                                                                     587

                                         switch Low-lev
                                                                                  J

                 Metaldepth,                                                             1"
                                                                                              ~                                                                                                                                                                      Check d SPLIT SPLIT
                                                                                    Delivry                                                                                                                                                                          by
                                                                           pipe
                                                                                                                                   olted             max./15                                                         No


                                                                                                                                                                                                                     Visble(Optional autom ic
                                                                                                                                                                                                                                                Split                JM       MASTER
                                                                                                                          Screw Trap 150m                                            (e.g house Can First
                                                                                                                                                                                                                   Pipes Testable Mains
                                                                                                                                                                                                                                        System
                                                                                                                                                                                                                                                                    I
                                                                                                                                                                                                                                                                             System    MASTER
                                                                                                                                                                                      Garden and Flush Water Control
                                                                                                                                                                                                   be
                                                                                                                                                         ct                                                                                                          Drawn
                                                                                                                                                                Tank                         T a n k l o c a t e d        D o u b l e    Box                                           Twin-
                                                                                                                                                                                       Bed)                 Divert             Check diverson with
                                                                                                                                                                                                                                                                     BM

                                                                                                                                                                                                                                                                                       Tank
                                                                                                                                                                                                  anywher Leaf&



                                                                                                                                                                                                                                Valve)
          50m                                                                                                          Openig with One-way                                                       suitable Straine
                                                                                                                                                                                                                                                         CD

                                                                                                                                                                                                                                                         2008                          Instal
                                                    AWe   50 lt 45 0lt 30 lt .t_:                                                                                                                                                                        ACTION
interco                                                                                                                                                                                             betw n
                                                               or                                               if      to
                                                                                                                                           Flap
                                                                                                               required Surface Inspectio Valve                                                                                                          TANK NTS Scale
                                                                                                                                                                                                                                                                    .L.
                                                                                                                                                                                                                                                                                         -

                                                                                                                                                                                                                                                                                               REV

          pipe
                                                                    Pipe
                                                                                                                                                                                                                                                        INDUSTRIE She t 3017/08
                                                                                                                                                                                                                                                                     1




                                                                                                                                                                                                                                                                     of
                                                                                                                                                                                                                                                                     1
                                                                                                                                                                                                                                                                                               Date

                                                                           Overflow 10m                                                                                                                                                                  P/L _)
                                                                                                                                                                                                                                                                             W

Page 46

Noosa on Weyba




                 ~,..,Carclno@
                      Shaping the Future


[OCR of page images]
Noosa on Weyba

 

APPENDIX

MUSIC Model Layouts

 

cy Cardna

Shaping the Future

 

Page 47

                                                                                                                                                                                                                                                  6~a




                                         [iittI"’-Tr’ Pre~_Rd                                                                    Ij
                                                                                                                                        m~I         SwalE-I
                                                                                                                                                    PreB6       1
                                                                                                                                                                         1



                                                                                                                                                                         T




                                                                                                                                                  V

                             iPreB5_Rd                                                                                                                            ’;/~
                                                                                                                                          ;:!~iI /~ PreBS_io ~l-1’
                                                                                                                                                                1




                                                                                                                                ~
                                         iPreS


                                       I                                                                                        i/V.1   TO’ Rainwter
                                                                                                                                               1
                                                                                                                                                        Tanir
                                                                                                                                                                V

                                                                                                                                                                         V"

                                                                                                                                                                                            V
                                                                                                                                                                                                V
                                                                                                                                                                                                          /’"
                                                                                                                                                                                                                     ~

                                                                                                            Gar ens                                                                                 ~

                                                                                                                                                                                                    ./7                               ~/
                                                                              Ii-pret:l4
                                                                                                                      _

                                                                                                            Bio                                                                                                    /
                                                                                                                          -/I
                                                                                                                                                                                                                         /1
                                                                                                                                                                                                                                                        17./,
                                       1-                                           ~                             ~nw.terT’1                              PreB4
                                                                                                                                                                  Ii
                                                                                                                                                                                 /
                                                                                                                                                                                            /




                                                                                                                                                                                                    \
                                                                                                                                                                                                                               /




                                                                                                                                                                                                                               \
                                                                                                                                                                                                                                           /
                                                                                                                                                                                                                                            ~V,. /:..
                                                                                                                                                                                                                                           . ,"_ iU~
                                                                                                                                                                                                                                           \
                                                                                                                                                                                                                                             \
                                                                                                                                                                                                                                                I




                                        -PreB3_G’
                                       {i                                     iiJPreBJ_io                                                         ._ . PreB3
                                                                                                                                                                S\’Iale ’\
                                                                                                                                                                  -
                                                                                                                                                                                \




                                                                                                                                                                                                          ,\ ’ . . . ~ ’ ,    ’
                                                                                                                                                                                                                                 ~~
                                                                                                                                                                                                                                           "~

                                                                                                                                                                                                                                           ~,
                                        ’reB3_R
                                       [j                                     Yr        n_:.IT   I
                                                                                                                                                                              1\.,
                                                                                                                                                                                  "
                                                                                                                                                                                               ,

                                                                                                                                                                                                                              .....
                                                                                                                                                                                                                                      ,

                                                                                                                                                                         "                                        r-. . ._


                                                                                                                                              S-bJi: \’Iale~                                   N~
                                                                                                                                                                                                          .....



                                                                                                 PreB2_io                       _                  PreB2                                    --...
                                                                                                                                                                                   r-....
                                                                                                                                                                               i""’-.
                                                                                                                                                                         K
                                                                                                     Tank
                                                                              L
                                                                                  1Qwaler
                                                                                                     Ra
                                                                                                                                                                ~
                                                                                                                                                    iB o~
                                                                                                                                It
                                                                                                                                                 "ank

                                                                                                                                =frgRainwter
                            3 co CD              ~                      "’C ..,CD(") :::l (").... [I]


   0          0                .....   0ru 0:::J     :2         . . . . c..                                                                                                                                                                                     I’-) <D Zo<CD 30’"
oz ~;: l.O: J’-";-"0’" 8~:f()"S-o(. )"’0 :5:~
  :.;.        c;;             ;:0 ~ C/)         "’U :
                                                    :g
                                                        ~’<9:r
                                                       ()CD $;"0"0 m :5:cC/)(53oc.CD (Jj C.o()><
                                                                                                                                                                                                                                                                                     -u~ wI’(00
                                                                                                                                                                                                                                                                                            -) CD. .lo1’-l)o.


[OCR of page images]
Cc Cardno

g
ie
3
=
&
e

PreB3_Bio
PreB3_Swale

Rainwater Tank

Rainwater Tank

 

Rainwater Tank

Image 1 Precinct B

 

Northbrook Corporation Pty Ltd

29 November 2012
©:\5101-19-03\wp\R3v2 SMP\Appendices\App E MUSIC models.docx

Page 1

Page 48

                                                                                                                                     <..J’) Carclno
                           1 j             I       1                                        I
                          I~              I~                         ~                  ~-
                          ~
             -I--r---Pr’eC 1    ,R-f--PreC1 r-                      preC1_Rd_r-preC1 CQmm-- _




                                                       ~                                V
                                                       \                                /
                                                           ,
                                                                                    /
                                                               \                    v
                                                                \               /
                                                                ~               /
                                                                               If
                                                                    \
                                                                     I:’~!I!
                          rijl
                          ~                                          IltiJ
             -r-
                       Rainwater Tank
                                                                    pr~BiOl
                                1\                                  /
                                 \                                 V
                                   \
                                                                /
                                        ~                      /
                                         \                 1/
                                          \                /
                                               ~       /
                                               111’-1
                                               _I
                                        R,ec-eivingl Node
                                           I       r       I
                                           I       I       I

             Image 2                    Precinct C

                   I       I       _L._                               1                                                  I                                   1


              .                                                     I~                                               l4tl
              .~                                                                                                     ~                                  ~           -




              f--PreD1_R-_p r<eD1 G                                 Pf’~1_Rd                                        Pr       _R.ii                      Pr’eD3_Rd   -




                                           _,


                                                   \
                                                       \                                                             ~I’~
                                                           \                                                         ID
                                                                                                                     ~
                                                            \                                                       PreD2_Bi!l

                                                                \
                                                                    \
                                                                      Ir_                                                                                   ~ ,.
                                                                                                                     ~I’~
              ~
             R.a irtw ater Tan k
                                                                1id                                                 ~                                    lilt
                                                                                                                                                         r--r--
                                                                                                                                                                    -




                                                                    preD1_BiO<\                                      Sw,ale                        i
                                                                                                                                                       Litter B.asket

                                                                                    "
                                                                                        \                                                          V
                                                                                        \                                                      V
                                                                                            \                                                 /
                                                                                             \                                            /
                                                                                                "\                                        ~

                                                                                                     \.                                  /
                                                                                                      \                              /V
                                                                                                          r\.


                                                                                                            ’\                       V
                                                                                                                             W
                                                                                                                    a
                                                                                                                Reoeiving No.de

                                                                                                                I        I     I
             Image 3                    Precinct D

North brook Corporation Pty Ltd                                                                                                                        29 Novem ber 2012
O:\5101-19-03\wp\R3v2 SMP\Appendices\App E MUSIC models.docx                                                                                                            Page 2

Page 49

                                                               <..J’) Carclno




             Image 4               Precinct D




             Image 5               Precinct E




North brook Corporation Pty Ltd                                       29 Novem ber 2012
O:\5101-19-03\wp\R3v2 SMP\Appendices\App E MUSIC models.docx                    Page 3

Page 50

                                                               <..J’) Carclno




             Image 6               Precinct F




             Image 7               Precinct G




North brook Corporation Pty Ltd                                       29 Novem ber 2012
O:\5101-19-03\wp\R3v2 SMP\Appendices\App E MUSIC models.docx                    Page 4

Page 51

                                                                                                      6~a




                            3 CO CD CO                              "’C ..,CD(") :::l (").... :::I:




   0          0                .....   0ru 0:::J    :2      . . . . c..                                I’V <D Zo<m 30’" .....
oz ~;: l.O: J’-";-"0’" 8~:f()"S-o(. )"’0 :5:~
  :.;.        c;;             ;:0 ~ C/)         "’U :
                                                    :g
                                                       ~’<9:r
                                                       ()CD $;"0"0 m :5:cC/)(53oc.CD (Jj C.o()><
                                                                                                                         " Om (OI’V mO c:.n~
                                                                                                                                Q)


[OCR of page images]
 

3pon Suazooy

  
 

‘OF 3. on
aIBAS PEOY IG PHO Yue, Jaye Aue yur, sayenuiey EMS Hed | vhs solemuey AIRS" Led | yURy JayemuIEY

8 8 eB 8

PuSH@ld = i
ZHedd |W HA PY LHAd | OS LHaig Y Hed

Page 5

29 November 2012

Precinct H

Image 8

 

0:\5101-19-03\wp\R3v2 SMP\Appendices\App E MUSIC models.docx

Northbrook Corporation Pty Ltd

Page 52

                                                                                                                                                            6~a



                                                 Prel5_Rd                                  lW
                                                                 ~
                                                 prel5_~
                                             PreIS_R                                                      nwaterTn ~
                          ~Prel4
                                                Rd
                                                            -1
                                                                                                                 aR~   I




                                              G
                                                                                                                           c: : F
                                                       ~
                          ~Prel4
                                                                                                                                    ~
                          ~Prel4_R

                                           P’jl3_Rd
                                                                                                        ~BO                JJ                           I




                                                                                                                                    ~             Nod

                                                                                                        Tan
                                                                                                                                            ~Recivng    I




                                                                                                                                                        I




                                                                                           tGlRainwter
                                                                                                                       \
                                                                                                                           ~~           "


                                                                                       iPrel2_Bi~                                   ffi
                                                                                                         Tanl(
                                                                                            gwater
                                                                                                         Ra      M
                                                                 ~


                                                                                           1*




                            3 CO CD <D                                         "’C .,CD(") :::l (")r+




   0          0                .....   0ru 0:::J                 :2    . . . . c..                                                                           I’V <D Zo<m 30’" .....
oz ~;: l.O: J’-";-"0’" 8~:f()"S-o(. )"’0 :5:~
  :.;.        c;;             ;:0 ~ C/)           "’U :
                                                      :g ()CD $;
                                                                  ~’<9:r
                                                                "0"0 m :5:cC/)(53oc.CD (Jj C.o()><
                                                                                                                                                                               " Om (OI’V mO (J)~
                                                                                                                                                                                      Q)


[OCR of page images]
Cc Cardno

ie
3
&
@

 

—Rainwater Te

Image 9 Precinct |

Northbrook Corporation Pty Ltd 29 November 2012
©:\5101-19-03\wp\R3v2 SMP\Appendices\App E MUSIC models.docx Page 6

Page 53

                                                               <..J’) Carclno




             Image 10              Precinct K




             Image 11              Precinct L




North brook Corporation Pty Ltd                                       29 Novem ber 2012
O:\5101-19-03\wp\R3v2 SMP\Appendices\App E MUSIC models.docx                    Page 7

Page 54

Noosa on Weyba




                 ~,..,Carclno@
                      Shaping the Future


[OCR of page images]
Noosa on Weyba

 

 

APPENDIX

Maintenance Plan

 

cy Cardno

Shaping the Future

 

Page 55

                                                                                  CJ~Cardno

INTRODUCTION
         The water quality treatment proposed for the Noosa on Weyba development includes a number of bio-
         retention basins and gardens. This appendix provides an overview of their maintenance requirements.
         The litter baskets installed on the field inlets will also need   regular maintenance.    An example of a
         manufacturer’s maintenance requirements for litter baskets is attached.




Bio-retention Basin and Gardens Maintenance Requirements


Inspection Frequency
         Routine inspections should be undertaken on the bio-retention basins and gardens after every
         significant rainfall event (30mm of rainfall in a 24 hour period) or on a three (3)monthly basis within
         the first twelve (12) months and on a six (6) monthly basis thereafter. The requirements of the
         inspection for the bio-retention basins shall include the following:
              .     Check for build-up of sediment at pipe inlet structures, remove as required;

              .     Check all concrete structures for damage and deterioration;

              .     Check for the build-up of vegetation matter on the bed surface and removal of vegetation
                    matter to ensure minimal blockage to media; and

              .     Check achieved flow rate through the media is maintained in accordance with the design
                    requirements.


Maintenance Frequency
         The bio-retention basins and gardens treat stormwater runoff through the principles of sedimentation
         and filtration. The systems are subject to deposition of sediment that is filtered through the media.


         Any accumulated litter including leaves and other debris shall be removed for the surface of the filter
         surface on an as required basis. Inspection and maintenance of the litter baskets should also be
         conducted at this stage. As noted above, the basins are to be inspected after every significant rainfall
         event (30mm of rainfall in a 24 hour period) or on a three (3)monthly basis within the first twelve (12)
         months and on a six (6)monthly basis thereafter.


Data Collectionl Storage Requirements

         Inspection records will be required for comparison of the performance of the system. In order to assist
         this process it is proposed that the Bio-retention Basin Maintenance Checklist prepared    by Healthy
         Waterways be adopted for the site. Copies of the completed checklist are to be forwarded to the
         Cardno (Old)Pty Ltd (or other consultant nominated by the Principal) and to be provided to SCRC at
         the expiry of the maintenance period.



Detailed Maintenance Procedure
         Vegetation plays a key role in maintaining the porosity of the filter media of a bio-retention system in
         and a strong healthy growth of vegetation is critical to its performance. Therefore the most intensive
         period of maintenance is during the plant establishment period (i.e. first two years) when weed
         removal and replanting may be required.


         It is also the time when high sediment loads may impact on plant growth and infiltration rates. For this
         reason, if they are not being used as temporary sedimentation basins, the bio-retention systems are
         initially to be turfed, with geotextile fabric protecting the filter media underneath. Vegetation can be
         introduced when construction has been completed on an appropriate percentage of the catchment
         draining to each bio-retention system. If initial turfing of the bio-retention systems is not considered
         practicable, then it is advised that the majority of the vegetation be screened off during the plant
         establishment phase. This can be done by installing temporary sedimentation fences or similar
         devices to separate the inlet and outlet zone from the remainder of the basin. The inlets and outlets
         should be located close together so that this can easily be managed.


Northbrook Corporation Pty Ud                                                                       29 November 2012

O:15101-19-03IwpIR3v2 SMPlAppendiceslApp F   -
                                                 Maintenance Plan.docx                                       Page 1

Page 56

                                                                                 CJ~Cardno

         Inflow systems and overflow systems require careful monitoring, as these can be prone to scour and
         litter build up. Debris can block inlets or outlets and can be unsightly.


         The filter media will be inspected for sediment deposition of the bed of the bio-retention basins and
         removed as required.


         Inspect for the accumulation of an impermeable layer (such as oily or clayey sediment) that may have
         formed on the surface of the filter media. A symptom may be that water remains ponded in the bio-
         retention basin for more than a few hours after a rain event.      Repair minor accumulations by raking
         away any mulch on the surface and scarifying the surface of the filter media between plants.   Any leaf
         litter should be removed to help maintain the surface porosity of the filter media.


         Ensure the   perforated pipes are not blocked to prevent filter media and plants from becoming
         waterlogged. A small steady clear flow of water may be observed discharging from the perforated
         pipe at its connection into the downstream pit some hours after rainfall. Note that smaller rainfall
         events after dry weather may be completely absorbed by the filter media and not result in flow. Sub-
         soil drainage lines are to be flushed with clean water as required to remove and blockage.



Vegetation Management
         Watering

         Regular watering of the bio-retention system vegetation is essential for successful establishment and
         healthy growth. The frequency of watering to achieve successful establishment will depend upon
         rainfall, maturity of planting stock and the water holding capacity of the soil.

         The following watering program should be adequate following the installation of vegetation:

              .     Week 1-2                       3 visits/week

              .     Week 3-6                       2 visits/week

              .     Week 7-12                      1 visit/week


         After the first three month period, watering may still be required, particularly during the first winter (dry
         period). Irrigation shall be undertaken in consultation with the Landscape Architect.

         Weed Control and Mulching


         Conventional surface mulching of the bio-retention systems with organic material like tanbark, should
         not be undertaken. Most organic mulch floats and runoff typically causes this material to be washed
         away with a risk of blocking drains. Mulch that is not likely to float should be adopted.

         If weeds are observed within the bio-retention system they shall be removed. Weeding will generally
         involve manual removal of the species.


         Vegetation planting densities are to be in accordance with the Landscape Architect’s design. Where
         necessary a biodegradable erosion mat can be applied to the basin batters to help combat weed
         invasion and reduce the labour intensive maintenance requirements for weed removal.


         Herbicides are not recommended as a means of weed control. If required, however, their application
         is to be managed to avoid unintentional destruction of other vegetation or the introduction of chemicals
         that may contaminate the stormwater runoff.


         Where necessary, in areas that have been extensively weeded, the bio-retention system shall be
         replanted with similar planting densities using suitable native species in accordance with the
         Landscape Architects design.

         Inspection of the existing vegetation is to take place and any dead or diseased vegetation shall be
         removed and    replaced with suitable native species in accordance with the Landscape Architects
         design.

Northbrook Corporation Pty Ud                                                                        29 November 2012

O:15101-19-03IwpIR3v2 SMPlAppendiceslApp F   -
                                                 Maintenance Plan.docx                                         Page 2

Page 57

                                                                                             <..J’) Carclno

         The removal of   plants, dead or diseased vegetation                      or   weeds shall be   disposed offsite at an
         appropriate waste management facility.



Equipment Needs
         The equipment required to undertake regular maintenance to the bioretention systems will be standard
         hand held       landscaping tools.                No specific mechanical equipment is expected to be required for the
         maintenance of the basins unless resetting is required.




Occupational Health and Safety
         The maintenance activities are to be undertaken in accordance with all current occupational and
         workplace health and safety legislation, regulations, codes of practice or manufacturers guidelines.

         For maintenance access, pathways have been provided for in the design of the bio-retention basins.
         As noted above no mechanical equipment is required unless resetting is required. The batter grades
         are considered to be acceptable and do not pose an occupational health and safety issue given proper

         training to maintenance personnel.

         The  application of pesticides or herbicides in response to any weed outbreak, which cannot be
         controlled via manual removal, is to be undertaken by maintenance personnel in accordance with
         manufacturer’s guidelines in consultation with the Landscape Architect. Protective measures are to be
         implemented so as to minimise exposure to personnel, with personal protective measures to be the
         final hierarchical option.


         While maintenance is being undertaken consideration of pedestrians and cyclists is to be made due to
         the close proximity of the footpaths. To avoid any safety concerns it is recommended that temporary
         warning signs be placed at a sufficient distance to allow pedestrians and cyclists to become aware of
         possible maintenance vehicles / personnel when maintenance is being undertaken.




North brook Corporation Pty Ltd                                                                                 29 Novem ber 2012

O:\5101-19-03\wp\R3v2 SMP\Appendices\App F   -
                                                 Maintenance Plan.docx                                                    Page 3

Page 58

!5b
r=b:I
r      .
          tEcosol’M                                                             TECHNICAL SPECIFICATION
                                                                                     The RSF 100 Solid Pollutant Filter
WASTEWATER FILTRATION SYSTEMS



9.0 Cleaning an RSF 100 Solid Pollutant Filter

The RSF 100 Solid Pollutant Filter can be cleaned manually or by vacuum using street-sweeping vehicles. The steps

to be followed for each method are similar and are as follows:


    Place appropriate signage, and any necessary traffic
    control measures, around the work area and ensure safe

    access to the unit



    Open and secure the pit access cover or grate

    (Manual method) -lift the intemal filtration bag holding the
    captured pollutants from the pit (lifting handles are
    attached to the removable liner to avoid contact with the
                                                                         ~~    _
                                                                                   .r.,__,   .__
    pollutants)

    (Vacuum method)       -
                              insert snorkel from suction vehicle and

    remove the     pollutants from the capture basket

    Place the captured material into a receptacle and cover it

    ready for transportation to an approved waste disposal
    facility

    (Manual method) prior to reinstalling the liner ensure that
                         -




    no obstructions exist in the bottom of the     gully pit. Remove
    obstructions, if any, and carefully re-install the liner into the
    aluminium slots


    Ensure that the by-pass flap(s) is functioning properly and
    make sure that the liner is firmly fitted and not obstructing
    the by-pass flap(s)


    Secure the pit access cover or grate and remove all

    equipment and signage

    Ensure any affected areas are restored to their original
    condition

                                                                            Street-cleaning equipment can be used to clean
    Dispose of all captured pollutants at an approved waste
                                                                           the RSF 100 quickly and efficiently with no manual
    disposal facility                                                                        handling of pollutants

Ecosol has a very competitive cleaning service. After each clean we provide a full report detailing the volume
and type of pollutants removed. We believe that it is in your best interests for Ecosol staff to clean and maintain
the unit, not only because we are specialists, but also because proper monitoring and maintenance enhances
the unit life significantly. Should you use another company to clean the unit, or undertake this work yourself, we

request that it be conducted according to Ecosol’s specifications. Otherwise, you may invalidate your warranty,
as   damage caused by inappropriate cleaning procedures is not covered.

The cleaning frequency, and the cost, depend heavily on the surrounding environment, the unit’s proximity to a
waste facility, the number of units, their location, and the type of pollution collected. The advantages of using
Ecosol to clean and maintain your unit are:


    regular inspections of your unit;
    comprehensive cleaning service with the removal and disposal of all captured pollutants;
    a detailed    report provided on completion of each clean;
    trained and experienced staff; and
    remedial work completed, if required.


 Your Ecosol representative can provide you with the necessary information to clean your RSF 100. More details are available in
                                         Ecosol’s RSF 100 Operation and Maintenance Manual



 Page 161
 NATURAL ECOLOGICAL SOlUTIONS

Used in these records

About this file

File size
52.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 9 of 37 Appendix 7 - Stormwater Management MCU12_0208.pdf · 52.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.