Skip to the record
For the highest quality transcripts.

Council archive · source document

Part 9 of 37 Appendix 7 - Stormwater Management MCU12/0208

of 58

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (52.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Noosa on Weyba
Stormwater Management Plan
                                                                                     ~,.., Cardno@
Precinct 4

Area J

Area J is located on the western side of Lot 53 and drains east into the tributary of Eenie Creek. One rural
residential lot is proposed.

Area K

Area K is located on the western side of Lot 53, bounded by Hollett Road West to the south. It drains east
towards the tributary of Eenie Creek, upstream of the existing dam. The slopes in this area are around 2

percent. 6 premium residential lots are proposed.

Area L

Area L is located within Lot 2 of SP179590, in the J & K Hofmann site.           It drains north towards another

tributary of Eenie Creek. The southern section of the site is quite flat, which steeper areas of around 5
percent in the northern part of the lot. Retirement living and aged care facilities consisting of 100 residences
are proposed.


The proposed precincts are all located within areas that have been previously cleared for grazing purposes.
The majority of the site will be retained in its natural state and/or revegetated.

Along Lake Weyba a 50 metre buffer area will be provided to the lot boundary, consisting of 40 metres of
open space and 10 metres of stormwater treatment area. This buffer area has mainly been cleared for cattle
grazing purposes. Revegetation of this area is proposed which will provide screening and improve its
ecological value. The buildings within the lots will be set back a further 10 metres, providing a total set back
of 60 metres to the lake. In Precinct 2 a 120 metre wide waterway corridor will be provided, which

encompasses Keyser Creek.        The existing vegetation and dam in this area will be maintained and
rehabilitated.  No compensatory excavation is proposed in this area so as to minimise potential
environmental impacts associated with vegetation clearance and the exposure of disturbed soils within a

waterway corridor. Flood modelling has shown that dense revegetation of this area would also be
achievable with acceptable flooding impacts for the site and surrounding properties, should this be desirable.

The existing dam and vegetated tributary located within Lot 53 will be maintained and rehabilitated.

The  proposed development has reticulated water and sewerage, and will pump effluent to the Noosa
Sewerage Treatment Plant (refer Water Supply and Sewerage Analysis, Cardno, October 2012). Previous
development applications for this site have utilised on-site treatment and disposal of effluent via irrigation.
This development plan therefore reduces the risk of contaminants from effluent being discharged into Lake

Weyba.




Northbrook Corporation Pty Ltd                       Version 2                                   29 November 2012

SMP_v2.docx                                   Commercial in Confidence                                    Page 4

Used in these records

About this file

File size
52.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 9 of 37 Appendix 7 - Stormwater Management MCU12_0208.pdf · 52.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.