Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Approved Document OPW24-0047 Noosa Springs Golf & Spa Resort Turf & Vegetation Management Plan 2024-25

of 97

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Managing wetlands/Lakes in Noosa Springs involves several critical tasks to ensure the
health and sustainability of these ecosystems. Here’s an overview of the key aspects of
wetland/Lakes management at Noosa Springs:

1. Weeding

Weeding is crucial for maintaining the balance of native plant species. It involves:

• Manual Removal: Hand-pulling invasive species to prevent them from outcompeting
native plants.
• Mechanical Methods: Using tools or machinery to remove larger infestations.
• Chemical Control: Applying herbicides selectively to target invasive species without
harming native plants.

2. Native Plants

Introducing and maintaining native plant species helps preserve the ecological
balance. Key activities include:

• Planting Native Species: Lepironia articulata, Isolepis nodosa, Carex appressa
• Rehabilitation Projects: Restoring disturbed areas with native vegetation.
• Monitoring: Regularly checking the health and spread of native plants.

3. Maintenance Methods

Maintaining wetlands involves:

• Regular Monitoring: Keeping track of water quality, plant health, and wildlife.
Quarterly Nutrient water testing is carried out through ALS (Australian Laboratory
Services) Strategic placement of Aerators (Currently 3 have been added in 2024). Use of
Probiotics - BioStim (Biology)
• Hydrological Management: Ensuring proper water levels and flow to support wetland
functions. (As per weir on the 5th hole)
• Erosion Control: Implementing measures to prevent soil erosion and sedimentation.
Continued planting along the water edges with native wetland plants (To create habitat,
food and help with erosion issues) and use of rocks through fast flow areas and on
corners/bends where we have erosion evident.
Targeted areas to plant out (Water edge) in 2024, 25, 26 and 27 financial years in red on
map below.

Log in to download the original (Approved Document OPW24-0047 Noosa Springs Golf & Spa Resort Turf & Vegetation Management Plan 2024-25.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.