Protection of trees to be retained:
To preserve the retained trees within this site tree exclusion zones must be determined. To
calculate these zones the formula has been used from the Australian Standard AS4970-2009
Protection of trees on development sites. This is the “Tree Protection Zone”.
Any encroachment, disturbance, or compaction of the soil within the Tree Protection Zone
can damage or destroy the fine absorbing roots. Injury caused by cutting, crushing,
suffocation, poisoning, or moisture stress by inundation or dehydration can result in damage
to a tree. The effects of some Injuries may not be apparent for some time.
The following guidelines are minimum standard I recommended for the preservation of these
trees. These guidelines should be incorporated in construction contracts, and the details made
available to all parties involved with work on the site, including equipment operators. Other
guidelines and protective measures may also be appropriate, in addition to those listed below.
1. Protection Barrier: A suitable protection barrier is to be installed around the trees to
be preserved. The barrier shall be constructed of durable fencing material, such as
plastic construction fencing or chain-link fencing. The barrier shall be installed at
the Tree Protection Zone perimeter. The fencing is to be maintained in good repair
throughout the duration of the project, and should not be removed, relocated, or
encroached upon without permission of the consulting arborist.
2. Storage of Materials: There is to be no storage of materials or supplies of any kind
within the area of the protection barriers. Concrete and cement materials, block,
stone, sand and soil are not being placed within any Tree Protection Zones.
3. Fuel Storage: Fuel storage will not be permitted within 30 meters of any tree to be
preserved. Refueling, servicing and maintenance of equipment and machinery will
not be permitted within 30 meters of protected tree.
4. Debris and Waste Materials: Debris and waste from construction or other activities
cannot be permitted within the Tree Protection Zones. Wash-down of concrete or
cement handling equipment, in particular, will not be permitted within 30 meters of
protected tree.
5. Altered Site Hydrology: No changes in soil surface hydrology, any grade changes
proposed that will impact on the Tree Protection Zones should be approved by the
consulting Arborist before construction begins.
6. Damages: All precautions should be taken to mitigate any potential injuries to the
protected trees and any damages or injuries should be reported to the project arborist
as soon as possible. Severed roots shall be pruned cleanly to healthy tissue, using
sharp clean pruning tools. Broken branches or limbs are to be pruned in accordance
with the Australian Standard AS4373-2007 Pruning of Amenity Trees.
Assessed by: David Hawthorne Dip Arb AHC50510
Consulting Arborist AQF5 Dip Hort/Arb RTF50203
Dip Hort RTF50103
MQAA / ISA QTRA
AIH RH0150
Document Set ID: 23679128
Version: 1, Version Date: 08/04/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.