Skip to the record
Every meeting, every word.

Original source · versioned page text

Reference Documents - 5 School Street, Pomona - MCU24/0165 & OPW24/0222

of 49

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 8, section 1. The text section number identifies this passage in the reader.

                                                                                                                    ABN 51 640 311 842
                                                                                                                              CONTACT
                                                                                                                      arcosgroup.com.au
                                                                                                                               OFFICES
                                                                                                  Sunshine Coast | Brisbane | Gold Coast




                 FIGURE 6: SCHOOL STREET GRASS VERGE, EAST OF THE SUBJECT SITE LOOKING WEST TO POMONA
                 CONNECTION ROAD

                 5.3       Lawful Point of Discharge
                 The existing lawful point of discharge is the southern boundary of the lot where runoff water exits the
                 lot as sheet flow into 22 Rifle Street. It is proposed that this lawful point of discharge is maintained post
                 development which is compliant with Section 3.9.1 requirements of QUDM. Pipe flows are proposed
                 direct to the drainage channel in Rifle Street with surface flows beyond the minor storm discharging to
                 22 Rifle Street conservation lot.

                 5.4       Flooding
                 The site is not identified to be impacted by flooding inundation event as per NSC Flood Hazard Overlay
                 Mapping as shown in Figure 7. Whilst the subject lot is not identified to be affected by the flood extents,
                 consideration of the surrounding flood conditions has been made as the adjacent lot to the south is
                 shown to be inundated during flood events. A flood search certificate was obtained which indicated that
                 the Defined Flood Event being the 1% AEP Climate Change flood level is 90.3m AHD. The building
                 levels have been designed to be above this minimum FFL (DFE +0.3m Freeboard).




                  15 November 2024                                                                                             Page 8
Document Set ID: 23679130
Version: 1, Version Date: 08/04/2025
Log in to download the original file

REFERENCE DOCUMENTS - 5 SCHOOL STREET, POMONA - MCU24_0165 & OPW24_0222.pdf · 3.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.