Council archive · source document
07/2106 - MCU - Entertainment and Dining Business Type 1 - Food & Beverages [As Published] · 132007.2106
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
State-controlled road matters 2. The application involves: (tick applicable boxes)
Uo yo formato see oe — (1 @ development on tand contiguous" to a State controlled road and for -
the application tigers referral to the Department UO (a) material change of use assessable against the planning scheme;
ua Reads OR) anneaiien (1 (b) reconfiguring a fot unless -
agency, whie in her a creumstences OMR “at « the total number of lots is not increased; and
be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased;
Schotute 2 ofthe [F Remulation wil assist you to O(c) operational work (not associated with a material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above)}-
¢ associated with access to a State-controlled road; or
¢ for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
CO (ii) development on land not contiguous to a State-controlled road and -
O(a) material change of use -
assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
(1 (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regutation
and exceeding the thresholds set by that schedule;
(1) (©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)-
« assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
EX (iii) none of the above
Clearing vegetation 3. The application involves: (tick applicable box/es)
For more information refer to Guide 12. Ol (i) material change of use -—
Unless you answered "none of the above” to Q3, . . .
the aplication requires assessment by the (a) assessable against the planning scheme;
Repariant ofNehrel Resources end Weer (b) on alot containing =
ifan agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRW is a « if there is no property map of assessable vegetation for the lot - remnant vegetation;
fonourrence agenty forthe apptcation in relation (c) where the existing use of the land is a rural or environmental use; and
it you ticked 034) of (), your application requires (d) where the size of the tand is 2 hectares or larger - complete Part J of Form 1
referral to NRW for assessment regardless of oO (ii) reconfiguring a lot -
whether vegetation clearing is proposed or not. we
(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
CO (iii) operational work -
{a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1
(iv) none of the above.
Strategic port land 4. The application involves:
For more information refer to Guide 11.
Ht you ticked (i) - the relevant Port Authority is the
assessment manager for the application.
if you ticked (i) Queensland Transport is a
concurrence agency for the application.
(1 (i) devetopment on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part | of Form 1
Oi (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - comptete Part { of Form 1
EX (iii) none of the above
4 Land contiguous to a State-centrolled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlled road; or that is part of a future State-
controlled road.
Page2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2106 - MCU - Entertainment and Dining Business Type 1 - Food & Beverages [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.