3.0 Energex DBYD
Attached to the e-mail Development Application - Survey Plans MCU16/0098 & OPW16/0183.
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
DEVELOPERS SURVEYOR
- NOTES
22/08/2016 ELECTRICAL CONTRACTOR
The works detailed on this drawing shall be constructed in accordance with Robin Russell & Associates'
General Specification for Installation of Electricity Reticulation and Street Lighting - Issue 'Y'.
LEGEND: ELECTRICAL
EXISTING UNDERGROUND CABLE
1. PROPOSED LOT 17 - S.E. CORNER NEXT TO
THE DRAINAGE RESERVE IS TO HAVE A MINIMIUM PROPOSED UNDERGROUND CABLE
2m x 2m TRUNCATION TO ALLOW FOR THE
CIVIL CONTRACTOR
INSTALLATION OF ELECTRICAL SERVICE PILLAR TO COMPLY WITH THE BORED The installation of all electrical conduits shall be supervised by the holder of an electrical work licence PROPOSED NBN CONDUIT ON COMMS ALIGNMENT
CLEAR OF S/WATER AND S/WATER PITS. CONDUITS SHALL BE INSTALLED AT A MINIMUM DEPTH - Electrical Safety Act 2002. COMMS CONDUIT IN SHARED TRENCH
OF 900mm. AT EACH END, WHERE THE CONDUIT RISES
2. THE TRUNCATED PROPERTY BOUNDARY LINE TO A DEPTH OF LESS THAN 900mm, A TRENCH SHALL Energex conduits and transformer site retaining walls shall be installed strictly in accordance with
Energex's specifications (see below). They will be inspected for compliance upon completion. BORED CONDUIT
OF VENTURE DRIVE AND PROJECT AVENUE IS BE EXCAVATED AND PROTECTIVE COVERS AND MARKER
TO BE STAKED FOR NEW ELECTRICAL WORKS TAPE SHALL BE LAID ABOVE THE CONDUIT. GAS IN SHARED TRENCH
TO BE INSTALLED.
The civil contractor shall install enveloping conduits under retaining walls behind pillars - two 100mm
conduits into each lot (one for Electricity, one for Telstra), 600mm deep behind the pillar, near ground
TUNNEL BORING SHALL BE REQUIRED AT
STN'S 24B-28.
TELSTRA - NOTE level inside the lot. 12 STATION NUMBER
RELOCATION WORKS REQUIRED.
PROPOSED TO MOVE SMALL PIT TO Relevant specifications in Energex's Underground Distribution Construction Manual are found at - C PADMOUNT TRANSFORMER
DETAIL WORKS PLAN
ALLOW FOR ELECTRICAL WORKS IN Section C1: Conduits
FRONT OF PADMOUNT SC21257 PROPOSED POLE TRANSFORMER
Section C2: Excavation
Section C3: Transformer Sites METER BOX / LV SWITCHBOARD
Lot 13 These sections of the manual can be downloaded from the following Energex web site:
PROPOSED SERVICE PILLAR
S0104679 REV D
DANGER http://www.energex.com.au/about_energex/asp/technical_documents.asp
IN VENTURE DRIVE, EXISTING Civil engineers who have registered for access to the following RRA website may download extracts EXISTING SERVICE PILLAR
M80 MAJOR SERVICES IN ALL LOCATIONS. DETAIL 'A' - SH2 from Energex's manual at:
CONFIRM AND POT HOLE BEFORE EXCAVATING. http://www.robrus.com.au FUTURE SERVICE PILLAR
240LV The civil contractor shall ensure that all conduits have been installed before constructing retaining EXISTING LINK PILLAR
walls, paths, driveways & water services. The civil contractor shall please inform the electrical
Lot 10 12 DRAINAGE Lot 5
Lot 15 contractor of any 'as constructed" departures from the civil design. PROPOSED C&I PILLAR
N A/B/C RESERVE REINSTATE VERGE &
100 LANDSCAPE AS REQUIRED 240 LV SC21257 Care! Lighting of new or altered existing roads might not comply with specified standards EXISTING OVERHEAD ELECTRICITY MAINS
240 LV
Lot 4 until new road lighting has been commissioned. The civil contractor shall ensure that PROPOSED OVERHEAD ELECTRICITY MAINS
71
IN. Lot 3 necessary warning signs are installed and speed restrictions are applied if necessary.
240(11)
HV POLE
4 SL
Lot 9 ON-SITE SERVICES CHECKS
Lot 14 39 240 LV
HV + LV POLE
13 95 Cu (11)
240LV 15 16 17 Robin Russell & Associates gives no warranty regarding the presence or location of buried services, LV or STREET LIGHT POLE
A/B/C 240 LV including newly-installed services. "As Constructed" locations may differ from what is drawn on this
N A/B/C A/B/C A/B/C U71338
24
24
0L
works plan. Contractors shall be responsible to identify and locate all buried services. Initial PROPOSED STREET LIGHT
0L
V
V S/L 1m U71336 U71335 identification can be obtained from:
17
240 LV EXISTING STREET LIGHT
Lot 8 240LV U71339 Dial Before You Dig Service
240LV 50
4SL Telephone 1100 FUTURE UNDERGROUND STREET LIGHT
M80 14 240LV
Fax 1300 652 077
IN. Lot 33 RECOVER STREET LIGHT
A/B/C 240(11)
24 32 4 U71337 On-line enquiries can be made at:
U4199
24 0L 4S 4SL
0L V L 29 http://www.1100.com.au. EARTH
)
V
24 0 LV (11
18A
Notice
1)
240(1
24 5 Cu
Z
IN. Lot 4 240 LV Having determined which services may be present, on-site locations should then be arranged with EXISTING RATE 3 STREETLIGHT CABLE
V
9
Lot 35
Z
0L
Lot 7
N
25L
240 LV
240(11)
240 LV
240(1
1)
S70
U453520
relevant service authorities.
GATEWAY DVE
U453521 PROPOSED RATE 3 STREETLIGHT CABLE
18L 26L F 65 Sewerage and water plans for the subdivision may be obtained on request from the Superintendent.
S70 240LV S70 24B 240 LV) 240 LV) Lot 36
16L VENTURE DRIVE EXISTING RATE 3 STREET LIGHT
S70 N
2A
240 LV Lot 18 Lot 1 This record provides details of ENERGEX
INSTALLATION proposed Underground
OF TELECOMMUNICATIONS CONDUITS BY TELSTRA PROPOSED RATE 3 STREET LIGHT
N
works to be or being carried
Telstra'sout inwillthe
install area of your DBYD request.
N
N
95 (11) contractor telecommunications conduits in shared trenches and other excavations
Lot 6 U71340
240 LV
Lot 1 provided by the electrical contractor. In commercial subdivisions, or where more than 2xP100 conduits EXISTING CONSUMERS OVERHEAD CABLE
REC.240LV
Lot 19 The cable voltages detailed may include, Low Voltage, 11KV, 33KV
L
15L 240 LV
4S
Z IN. 240LV
S70 are required, the conduits may not be installed above Energex conduits. They shall be laid in a PROPOSED CONSUMERS OVERHEAD CABLE
95 (11)
240 LV
240LV Lot 13
240 LV
Lot 2 or 110KV Transmission andseparatePilot
trench on (Fibre Optic) underground
the standard communications alignment specified.
EXISTING CONSUMERS UNDERGROUND CABLE
DANGER 240LV Contractors shall notify Telstra's contractor:
240LV
240(11)
24
240(11)
Lot 3 Cables. The details of thexunderground workstrenches plan provided, is for
V
0L
0L
one week before road crossing will be open.
24
1)
240LV
V
PROPOSED CONSUMERS UNDERGROUND CABLE
24
0(1
0L
AT SC1389563 - LIVE 11kV/LV 240(11)
N
V
x two days before footpath trenches will be open.
24
V
0L
SC754851
AND SERVICES. HAND EXCAVATE Lot 4 information only as the works may not be constructed at this time.
1)
24
11
0(1
1 U71341 PROPOSED CONSUMERS SWITCHBOARD
ONLY AT THIS LOCATION. N Lot 200 Telstra's contractors are:
24
V
1)
Lot 0 U453522
240L
240LV
240(1
RESTORE SITE WHEN COMPLETED. A/B/C A/B/C Lot 0 south of Brisbane River: Silcar Communications
Lot 14 EXISTING CABLE
AVENUE
USE BARRIER AND SIGNS. 240(11)
Lot 0Lot 5
elsewhere: Service Stream Communications
Lot 12 As the details shown on this works plan may differ from the final PROPOSED CABLE
Lot 5 M80 10 U71342
Lot 15
9 Lot 7 Lot 8
N
4SL SC2069511 BIKE PATH CLEARANCES
240LV
A/B/C A/B/C 3L
Lot 6 construction details, no responsibility is incurred by ENERGEX for 32/40mm HD CONDUIT
25m
S70
240(11)
Lot 11
240 LV
Lot 201 Lot 16 "Austroads Guide to Road Design Part 6A: Pedestrian & Cyclist Paths" specifies a minimum
REINSTATE VERGE AS the accuracy or See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.