Original source · versioned page text
Appendix G
6
2.5 Future Forecast Base Traffic Volumes
For the purposes of this traffic analysis, the “Base Year” for assessment of the impact of the
proposed redevelopment is 2012; as this represents the most likely completion date of the
proposed redevelopment. The 10-year planning horizon has therefore been taken as 2022.
1
The DTMR traffic census data indicates that a forecast growth rate of 3% p.a. (compound)
(compound
would be appropriate along Cooroy-Noosa Road in the vicinity of the subject site.
This growth rate has been adopted to estimate the 2022 horizon year traffic volume. It is noted
that growth on the surrounding network has only been applied to “background” through traffic.
The forecast future volumes for the Cooroy-Noosa Road / Carramar Access / Access to local
development intersection for the 2022 scenarios are illustrated on Figure B2 in Appendix B of
this report.
1
DTMR traffic census data – Cooroy-Noosa Road - Road 142:
http://131940.qld.gov.au/TrafficCensus/Traffic%20Census%20Data/NCHD%20Data/Combined%20Data/Z055_142_T&
S-C_NC_2008.pdf,
4516 - TIA - 004(1) .doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.