Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Appendix G

of 67

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Department of Main Roads
Road Planning and Design Manual

Turn Volume ‘Qa’ or 'Q,' (Veh/h)

H 2

 
   
  
 

Chapter 13
Intersections at Grade

 

 

 

 

 
   

 

 

 

80 5
Refer next page for
notes to diagram.

60 5

40 5

CHRI(AUL or CHL)
CHR(S)/
204 AUL(S)
BARIBAL
0 T T T T ; 1
0 200 400 600 800 1000

Major Road Traffic Volume 'Qy' (Veh/h)

1200

Figure 13.22 Warrants for Turn Treatments on Roads with a Design Speed 2100km/h

foe]
oO
J

a
oO
1

NO
oO
1

Turn Volume ‘Q,’ or 'Q,' (Veh/h)
bh
oO

a e]

 
   
 

CHR(S)/
AUL(S)

BAR/BAL

 

 

Refer next page for
notes to diagram.

 

 

 

CHRI(AUL or CHL)

  
 
    

 

0 T T T
0 200 400 600

T T

800 1000

Major Road Traffic Volume 'Qy' (Veh/h)

1200

Figure 13.23 Warrants for Turn Treatments on Roads with a Design Speed < 100km/h

- Right tren - 2022 Bemgm
~ Ridnt turn _ 2022 Oenlen PM Peak

AM Peak

October 2006

13-39

 
Log in to download the original file

Appendix G.pdf · 4.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.