2006/2356 Page 12 of 26 [OCR of page images] 2006/2356 mor e Final ground levels should slope gently to the edge of the easement or the proposed kerb or surrounding area such that pooling of water on the easement is avoided and conductor ground clearances are not decreased. « 10 metres clear access must be provided around all towers and pole structures. « Stockpiling of spoil on the easement is prohibited. « — Lighting structures are not permitted in the easement without prior written consent of ENERGEX. « Underground services should be kept to the outer edge of the easement and any crossing of the easement should be clearly marked. Please submit the relevant design drawings to the Principal Mains Design Engineer for review. The identification, assessment and mitigation of any possible hazards in the service due to electromagnetically induced voltages, is the responsibility of the developer. ° Any cut in the vicinity of a structure or between a structure and the road kerb will need to be stabilised by a retaining wall. The retaining wall design and location is to be submitted to ENERGEX for approval. «Any further proposal for works or development on the easement including those involving changes in ground level and retaining wall designs around towers and poles must have prior approval from ENERGEX. Please submit the relevant civil designs to the Principat Mains Design Engineer for approval. « Access to the easement and access along the easement must be available to ENERGEX personnel and heavy equipment at all times. ENERGEX will require the developer / owner to supply and install gates where fencing prohibits access to and along the easement area. To enable travel along the easement at anytime the gates must be series locked with an ENERGEX padlock. Both the padlock and a design drawing of an acceptable gate will be provided by ENERGEX,. e Any costs incurred by ENERGEX as a result of the works on the easement are to be met by the property developer / owner. « ~ Atall times the following minimum clearance must be maintained from the top of any machinery moving in the vicinity of energised conductors: — 132kV and 110kV conductors — 4.5m minimum clearance — 33kV and 11kV conductors — 3m minimum clearance ~ Should it be necessary to transport equipment or extend any equipment, such that these clearances cannot be confidently maintained, you are required to contact our office to ascertain whether a Safety Officer is required on-site. All operators of machinery are to be made aware of the presence of high voltage conductors. * Any proposal for landscaping on the easement must have prior approval from ENERGEX. Please submit the relevant landscaping design to the Principal Mains Design Engineer for approval. When considering landscape designs the planting of trees must be kept to the edges of the easement and not under any overhead conductors. When mature, plants or trees must not grow in excess of 4 metres in Reference: HBD331064 NSID:07/L0064 Page 12 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2006.00002356.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.