2196 - Engineering Plans

of 11

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 10, section 1. The text section number identifies this passage in the reader.

                                                                                          SANDBAGS OVERLAP                                                                                                                                                                                       0.30     1.00               2.00                                                                                                         PHASING OF WORKS
                                                                                          ONTO KERB
                                                                                                                                  4.0 m (min)                                                                                                                                                                                                                                                                                           1. Establish construction site;
                                                                                                                                                                                                                                                                                                                                                                                                                                        2. Demolish & recycle existing buildings & driveways;
                                                                                                                                                                                                                                                                                                                                                       STORMWATER RUN-OFF                                                               3. Set up ESC measures;
                                                                                 Sediment                                                                                                                                                                                            1:2
                                                                                                                                                                                                                                                                                                          1:2
                                                                                                                                                                                                                                                                                                                                                                                                                                        4. Earthworks;
                                                                                                                                                                                                                                                                       F.S.L.
                                                                                 pond                                                                                                                                                                                                                                        1:6                                                                                                        5. Initial building works & reconnect site drainage;
                                                                                                                                                                                                                                                                                                                                     TURF STRIPS (1.0m WIDE) OR                                                                         6. Demolish & reconstruct driveway & verge. Connect all services to site, remove grid & fill
                                                                                                                                                                                                                                                                                                                                     GEOTEXTILE LINING TO INVERT                                                                        in sump;




                                                                                                                                           1M
                                                                                                                                                                                                                                                                                                                                                                                                                                        7. Cover all remainder earth areas with turf or concrete blinding layer if turf will damage;




                                                                                                                                            (M
                                                                                                                                                                                                                                                                                   DIVERSION/DETENTION BUND                                                                                                                             8. Continue & complete building works. Establish permanent, non-erodible ground cover;




                                                                                                                                              AX
                                                                            Run-off                                      SPILLWAY                                                                                                                                                                                                                                                                                                       9. Remove kerb inlet protection & sediment fence when site erosion is no longer an issue.




                                                                                                                                                )O
                                                                                                                                                                                                                                                                                NOT TO SCALE




                                                                                                                                                     N
                                                                                                                                                     PU
                                                                                                                                                                                                                                                                                                                                                                                                                                         ESC MEASURES:




                                                                                                                                                        BL
                                                                                                                                                           IC
                                                                                                                                                           RD
                                                                                                                                                                                                ON GRADE KERB INLET                                                                                                    STABILISE STOCKPILE                                                                                              Access: Cattle grid installed in existing driveway slightly raised. Cut in 300mm deep sump
                                                                                                                            BYPASS FLOW                                                         SEDIMENT TRAP IN                                                                                                       SURFACE                                                                                                          under for collection of sediment.
                                                                                                                                                                                                ACCORDANCE WITH IECA STD                                                                           X.)
                                                                                                                                                                                                                                                        EARTH BANK                              (MA                    2:1                                                                                                              Fence: Install geofabric sediment fence to downstream (front boundary). Anchor bottom of
                                                                                                                      THREE LAYERS OF SANDBAGS                                                  OG-01                                                                                      PE                                SLO
                                                                                                                                                                                                                                                                                     SLO                                                                                                                                                fence mesh against lifting.
                                                                                                                      WITH ENDS OVERLAPPED.                                                                                                                                      2:1                                               PE
                                                                                                                                                                                                                                                                                                                                      (M                                                                                                Drainage: Install filter socks and geofabric mesh around kerb inlets. Temporarily cap or seal
                                                                                                                                                                                                                                                                                                                                        AX
                                                                                                                                                                                                                                                                                                                                             .)                                                                                         any drainage pipes and field inlets on site.
                                                                                                                                                                                                                                                                                                                                                                                                                                        Street: Carry out regular street sweeping during earthworks and initial building works
                                                                                                                                                                                                                                                                                                                                                                                                                                        phases, when there is higher risk of sediment being tracked onto Margit Crescent.
                                                                                                     ON GRADE KERB INLET SEDIMENT TRAP                                                                                                                                                                                          SEDIMENT FENCE                                                                                          Contractor to arrange street sweeping when necessary
                                                                                                                                                                                                                                                             CONSTRUCTION NOTES
                                                                                                                                                                                                                                                             1. PLACE STOCKPILES MORE THAN 2 (PREFERABLY 5) METRES FROM EXISTING VEGETATION,                                                                                              ESC MAINTENANCE
                                                                                                                                                                                                                                                                 CONCENTRATED WATER FLOW, ROADS AND HAZARD AREAS.
                                                                                                                                                                                                                                                             2. CONSTRUCT ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS.                                                                                                                Access: Check grid sump every second day & after rain events for sediment build-up.
                                                                                                              SPACING VARIES WITH SLOPE                          4 m (min)                                                                                                                                                                                                                                                              Vacuum excavate if full.
                                                                                                                                                                                                   SIDE-ENTRY                                                3. WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS THAN 2
                                                                                                                                                           WHEREVER PRACTICAL                                                                                                                                                                                                                                                           Fence: Check installation of fence daily & before all rainfall events. Particularly around the
                                                                                                                                                                                                   INLET                                                         METRES IN HEIGHT.
                                                                                                                                                                                                                                                                                                                                                                                                                                        base and for adequate embedment of posts.
                                                                                   VERGE                                                                                                                                                                     4. WHERE THEY ARE TO BE IN PLACE FOR MORE THAN 10 DAYS, STABILISE FOLLOWING THE
                                                                                                                        SEDIMENT                                                                                    GRATE                                                                                                                                                                                                               Drainage: Check filter measures around kerb inlet daily & before rainfall events, as with
                                                                                                                                                                                                                                                                 APPROVED ESCP OR SWMP TO REDUCE THE C-FACTOR TO LESS THAN 0.10.                                                                                                        fence.
                                                                                                                                                                                                                                                             5. CONSTRUCT CUT-OFF BUND ON THE UP-SLOPE SIDE TO DIVERT WATER AROUND
                                                                                                                   OVERFLOW                                                                                                                                      STOCKPILES AND SEDIMENT FENCES 1 TO 2 METRES DOWN-SLOPE.
                                                                                                                                                                                                                                                                                                                                                                                                                                          WATER QUALITY
                                                                                                                                                                                   ON-GRADE KERB INLET
                                                                                                                                                                                                                                                                                                                                                                                                                                        CONSTRUCTION PHASE RUNOFF SHALL EITHER BE:
                                                                                                                                                                 ROADWAY                                                                                                                                                                                                                                                                 1.      COLLECTED IN THE BASEMENT EXCAVATION AND REMOVED FROM SITE
                                                                                                                                                                                                                                                                                      1000 mm                          TYPICAL 50 X 100 mm                                                                                                       VIA VACUUM TRUCK AND DISPOSED OF IN ACCORDANCE WITH THE
                                                                                                                                                                                                                                                                                      (max)                            TIMBER CROSS MEMBERS                                                                                                      TRUCK OPERATORS ENVIRONMENTAL POLICY, BCC REQUIREMETNS AND
                                                                                                          SANDBAG SEDIMENT TRAP                                                                                                                                                                                                                                                                                                                  EPA GUIDELINES.
                                                                                                                                                                                                                                                                                                                                                                                                                                         2.      DISCHARGED TO THE STORMWATER SYSTEM PROVIDED THAT THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                 WATER IS TREATED TO THE BELOW REQUIREMETNS (IN ACCORDANCE
                                                                               TYPICAL LAYOUT OF ON - GRADE KERB INLET SEDIMENT TRAP                                                                                                                                                                                                                                                                                                             WITH THE EPA) AND TESTED TO CONFIRM PRIOR TO DISCHARGE:
                                                                                                                                                                                                                                                                      SEDIMENT                                                                                                                                                              2.1.      <50mg/L TSS
                                                                                                                                                                                                                                                                      FENCE                                                                                                                                                                 2.2.      pH BETWEEN 6.5 AND 8.5
                                                                                                                                                                                                                   FABRIC                                             FABRIC                                                                                                                                                                2.3.      NTU LESS <10% ABOVE BACKGROUND
                                                                                                                                                                                                                                                                                                                                                  300 mm
                                                                                                                       2m                                                            POST                                                                                                                                                         (min)
                                                                                                                                                                                                                  CLEAN SAND OR
                                                                                                                                      FABRIC                            FABRIC                                    AGGREGATE                                                                                                                                                                                                        SEDIMENT & EROSION CONTROL PROGRAM
                                                                                                                                                                                                                                                                                                                                                  FABRIC BURIED                                                                       OBJECTIVE/TARGET            THE CONTRACTOR MUST COMPLY WITH ALL STATUTORY
                                                                                                                                          POST                                                                                                                                                                                                                                                                                                                    REGULATIONS AND MAINTAIN THEM DURING EARTHWORKS/
                                                                                                                                                                                                                                                                                                                                                  200mm
                                                                                          FINAL BATTER                                                                                                                                                                                                                                                                                                                                                            CONSTRUCTION. ALL PROVISIONS AND SPECIFICATIONS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                  OUTLINED WITH THE APPROVED ENVIRONMENTAL
                                                                                                                                                                             BACK FILL                                                                                                                                                                                                                                                                            MANAGEMENT PLAN MUST BE ADHERED TO, ALONG WITH
                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ALL EROSION AND SEDIMENT CONTROL MEASURES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                  PRESCRIBED WITHIN THESE DRAWINGS BY THE
                                                                                                                                                                                   200 mm                    300 mm                                                                                                                                                                                                                                               SITE ENGINEER
                                                                                                                                                                                                                                                                                FABRIC DROP INLET PROTECTION                                                                                                                          MANAGEMENT                  THE SITE FOREMAN IS TO IDENTIFY AND CHECK THE
                                                                                                                                                                                                                                                                                WITH SPILL-THROUGH WEIR                                                                                                                               STRATEGY                    DIRECTION OF STORMWATER FLOWS AS SHOWN ON PLAN.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                  PROVIDE BARRIERS AND OTHER MEASURES SHOWN ON
                                                                                                                                                                                    SOIL                                                                                                                    NOT TO SCALE                                                                                                                                          PLAN TO PREVENT STORMWATER FLOWS OVER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                  EMBANKMENTS, AND SEDIMENT INTO GULLY PITS

                                                                                                                                                                                                                                                                                                                                                                                                                                      TASKS / ACTIONS             ERECT SEDIMENTATION BARRIERS AS DETAILED.
                                                                            (a) LOCATION OF FENCE RELATIVE TO BASE OF SLOPE                                        (b) ANCHORING BASE OF FABRIC                                                                                                                                                                                                                                                                   STRATEGICALLY PLACE CHECK DAMS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                  AROUND GULLY PITS

                                                                                                                                                                                                                                                                                                                                                                                                                                      PERFORMANCE                 THE SITE FOREMAN IS TO CHECK FOR EROSION AND
                                                                                                                                                                                                                                                                                                                                                                                                                                      INDICATORS                  SEDIMENT FLOWS AT THE BASE OF EMBANKMENTS AFTER
                                                                                                                                                                                                                                                               50 − 75 mm, OR                                                MINIM
                                                                                                                                                 ‘RETURNS’ PLACED AT 20 M SPACING (MAX) IF                                                                                                                                             UM LE                                                                                                                      SIGNIFICANT RAINFALL AND SHOULD ASCERTAIN THE
                                                                                                                                                                                                                                                               100 − 150 mm                                                                        NGTH                                                                                                           WORKING EFFECTIVENESS OF CHECK DAMS DURING
                                                                                                                                                 FENCE IS LOCATED ALONG THE CONTOUR,                                                                                                                                                                        15m (M                                                                                                THIS WET WEATHER
                                                                                                                                                                                                                                                               CRUSHED ROCK                                                                                              IN)
                                                                                              3 m (max) WITH WIRE BACKING,                       OTHERWISE 5 TO 10 M DEPENDING ON SLOPE.
                                                                                              OTHERWISE 2 m (max)                                                                                                                                                                                                                                                                                                                     FREQUENCY /                 SITE FOREMAN TO MONITOR PERFORMANCE AFTER
                                                                                                                                                                                                                                                                                                                                                                                                                                      DEADLINE                    EVERY HEAVY DOWNFALL

                                                                                DIRECTION OF FLOW                                                                                                                       1.5 m (min)                                                                                                                                                                                                   RESPONSIBILITY              THE SITE FOREMAN IS RESPONSIBLE FOR ALL INSPECTIONS
                                                                                                                                                                                                                                                                                                                              Width 3.0 m (min)                                    ry                           Kerb
                                                                                                                                                                                                                                                                                                                                                                                  a
                                                                                                                                                                                                                                                                                                                                                                               nd                                                     REPORTING REVIEW            SITE WORKMEN ARE TO ADVISE THE FOREMAN IF ANY
                                                                                                                                                                                                                                                                                                                                                                           ou
                                                                                                                                                                                                                                                              UP-SLOPE RUNOFF                                                                                       rt   yb                                                                                       SEDIMENT & EROSION CONTROL DEVICES ARE FAILING
                                                                                                                                                                                                                                                                                                                                                                 pe
                                                                                                                                                                                                                                                              DIRECTED TO A                                                                                  Pro                Footpath                                              CORRECTIVE ACTIONS          THE SITE FOREMAN IS TO REPORT AND ORDER THROUGH
                                                                                                                                                                                                                                                                                                                                                                                                                                                                  SUPERVISOR, EXTRA BARRIER OR CHECK DAMS AS
                                                                                                                                                                                                                                                              SEDIMENT TRAP                                                                                                                                                                                       REQUIRED
                                                                                                                                                                                                                                                                                                                                                                                                      Roadway
                                                                                                                                                                                                                                                                                                 GEOTEXTILE FILTER CLOTH                       MAKE SAFE FOR
                                                                                                                                                                                                                                                                                                 (MANDATORY WHEN WORKING                       PEDESTRIAN
                                                                                                                                                                                                                                                                                                 ON CLAYEY SOILS)                              TRAFFIC
                                                                                                                                                                                     ALL SUPPORT POSTS PLACED
a:\2196-no. 6 margit cres, sunrise beach\acad civil opw\2196-opw.dwg




                                                                       FABRIC BURIED                                                                                                 DOWN-SLOPE OF FABRIC
                                                                       200 mm                                                                                                                                                                                                                                                                                                                                               NOTE:
                                                                                                                              SEDIMENT FENCE FABRIC, NOT
                                                                                                                                                                                                                                                                                                                                                                                                                            REFER TO IECA STANDARD DRAWINGS FOR NOTES AND
                                                                                                                              FILTER CLOTH OR SHADE                                                                                                                                                      VIBRATION GRID (ENTRY/EXIT)                                                                                        CONSTRUCTION DETAILS.
                                                                                                                              CLOTH                                                                                                                                                                      NOT TO SCALE
                                                                                                                                                                                                                                                                                                         CONSTRUCTION EXIT - VIBRATION GRID REFER TO IECA STD Exit -04
                                                                                                                        INSTALLATION OF SEDIMENT FENCE
                                                                                                                         NOT TO SCALE
                                                                                                                                                                                                                                                                                                                                                                                                           PROJECT:                                                                                         JOB NUMBER
                                                                       REV DATE DESCRIPTION                                         BY     CHKD DRAWN
                                                                                                                                                    I GDETAL
                                                                                                                                                           IS                                                       SCALE                                                       APPROVED                                                                                                                   PROPOSED DUAL OCCUPANCY DEVELOPMENT                                                                 2196
                                                                        A      04-04-23    FOR APPROVAL                              JL         CL                                                                                                                                                                                                                                                         AT 6 MARGIT CRESCENT, SUNRISE BEACH
                                                                                                                                                         DATUM               AHD
                                                                                                                                                                                                                                                                                                                                                                                                           FOR SUNSHINE ENTERPRISES PTY LTD (QLD)                                                    SHEET:      10    OF    10
                                                                                                                                                      DESIGN                  JL
                                                                                                                                                                                                               AS NOTED
                                                                                                                                                                                                                                                                           .................                                                                                                               DRAWING TITLE:                                                                           DRAWING NUMBER              REV
                                                                                                                                                      DRAWN                   JL

                                                                                                                                                      DESIGN CHECK
                                                                                                                                                                                                                                                                        Director: CAMERON LANDRETH
                                                                                                                                                                                                                                                                                                                                           p 07 5443 8285                                                  EROSION AND SEDIMENT CONTROL DETAILS                                                            R10                    A
                                                                                                                                                                              CL                                                                                                 (RPEQ 19358)
                                                                                                                                                                                      This drawing is not to be copied or amended without written permission from                                                                          e [email protected] w www.barlowshelley.com.au
                                                                                                                                                      DATE              MARCH 2023    Barlow Shelley Consulting Engineers                                                                                                                  a PO Box 899 Maroochydore 4558 ABN 89 215 591 077
Log in to download the original file

2196 - Engineering Plans.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.