Monday, 18 December 2023

Our Ref: 17197
Your Ref: MCU23/0134 & OPW23/0159


       NOOSA COUNCIL
       PO BOX 141
       TEWANTIN QLD 4565


       ATTENTION: Mark Lewis
       VIA EMAIL: [email protected]


Dear Mark

INFORMATION RESPONSE


9 WYUNA DRIVE, NOOSAVILLE


Further to your information request for the abovementioned development application we now
respond to all of the information requested.

1. Indicate on the plans any existing vegetation within the waterway in the frontage of the site.

Please find attached amended plans showing the existing palm tree (on the land) and
mangrove tree (in the canal) at the frontage of the site.

2. Provide additional detail on how any existing vegetation is to be protected during the
   construction works.

The proposed pontoon has been shifted to ensure that it does not interfere with either of these
pieces of vegetation. Please refer to the amended plans showing the location of each. Any
mangrove branches that may extend towards the pontoon will be gently pulled aside
(remaining intact) to ensure the plant is not disturbed.

3. Provide sufficient detail to demonstrate how the proposed works achieve compliance with
   The Waterways Works code – Performance Outcome PO1 (a, b & c).

   (a) The proposed pontoon is consistent with the type, design and materials of construction
       when compared to newer pontoons in this immediate area including the neighbouring
       structure to the left. No adverse effects to light, views, air quality and noise are expected
       with the installation of this pontoon when others already exist in this canal.
   (b) There are already a number of existing pontoons and jetties in this section of canal.
       The proposed pontoon is of a similar sizing to others and is in keeping with the marine
       amenity.
   (c) The repositioning of the pontoon will ensure that the mangrove in the waterway is not
       affected. The palm tree is well clear of the proposed land anchor.
Full text of the other 2 pages

Page 2

4. Provide amended plans that are in accordance with The Waterways Works Code –
   Acceptable Outcome AO9.1 and indicate a 3m setback from the prolongation of the
   boundary.

Please find attached amended plans showing the pontoon the required 3m setback from the
prolongation of the boundary.

We trust that this information provides evidence that the proposed pontoon is in keeping with
the amenity of the canal maritime structures and ensures that vegetation is not adversely
affected.

Should you have any questions with respect to the above, please do not hesitate to contact
me direct.

Yours faithfully
PROJECT URBAN




Trish Belt
Senior Approvals Officer
Email: [email protected]

Page 3

Used in these records

About this file

File size
104 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Bakaric - Information Response.pdf · 104 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.