Original source · versioned page text
Tewantin and Doonan Locality Code
COLUMN 1 COLUMN 2 ASSESSMENT
SPECIFIC OUTCOMES PROBABLE SOLUTIONS
Roof form
O13 S13.1 Complies with the Probable Solution
Roof forms The main roof of the building has a roof pitch no The roof will have a maximum pitch of 10 degrees.
a) contribute positively to the local skyline; less than 12 degrees and has roof forms a
b) complement the character of the locality; minimum of 600mm wide;
c) use soft and articulated, pitched, skillion or And
curved roof forms;
d) avoid low pitched (i.e. less than 12 degrees) or S13.2 Complies with the Probable Solution
box profiles without eaves; and Roof top terrace areas to buildings and structures There are no roof top terrace areas proposed.
e) do not create opportunities for residents to are avoided.
overlook the private open space areas of
neighbouring properties.
Flooding and drainage
O14 S14.1 Complies with the Probable Solutions
Buildings and other works are designed and sited Floor levels for habitable rooms are not less than The proposed development is located well above
to the specified minimum floor levels; the Q100 flood line. The drainage over the site will
a) provide flood free access to premises and And not be impeded by the development.
flood free habitable areas; Species identified in Table 6.1 of PSP3 Landscape
b) allow only minor, short term and infrequent Plants;
flooding of non-habitable areas; a) grouping plants in mulched beds;
c) ensure drainage does not adversely impact b) minimising impervious surfaces;
upon other premises; and c) using semi-pervious paving types as a
d) ensure filling or excavation does not adversely alternative to pervious surfaces; and
impact upon other premises by d) draining hard surfaces areas to pervious areas.
i. causing ponding of water on the site or S14.2
nearby land; Where Council infrastructure is available
ii. increasing flooding, which adversely a) any drainage (from buildings and land) flows
affects the safety or use of any land to that infrastructure; and
upstream and downstream; and b) the infrastructure has the capacity to accept
iii. adversely affecting the flow of water in any any additional loading.
overland flow path.
Sloping sites and ridgelines
O15 S15.1 Not Applicable
Development on sloping sites Buildings and associated accessways are not Whilst the site is sloping, the building platform will
a) is responsive to the natural topography of the constructed on land with a slope greater than 1 in not be sloping.
site, by stepping along or with the slope of the 3;
site without the need for extensive cut and fill; and
Tewantin and Doonan Locality Code Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.