Council archive · source document
PM Submission - Jodi Armstrong - MCU25/0118
7. Loss of Future Community Infrastructure Capacity
Converting land intended for community and social infrastructure to residential use
compromises Council’s ability to deliver necessary community facilities in the future and
risks further similar encroachments on other Community Facilities sites.
Conclusion
• The development is inconsistent with the long-term planning intent for the site.
• It is out of scale with the local area and incompatible with Cooroy’s desired character.
• Approval would jeopardise future community infrastructure, contribute to social
inequity, and place additional burden on local roads.
For these reasons, I respectfully request that Council refuse the application.
Name:
Signature: Q A f h/vcrl <(
Address: j 15 IZAOfg/ <3 l CZ-SS I
/ 7
Email (optional)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
PM Submission - Jodi Armstrong - MCU25/0118Related documentApplication case desk ↗
About this file
- File size
- 937 KB (small file)
- File type
No other editions are linked here.