Skip to the record
The only place to find full transcripts.

Original source · versioned page text

DA Form 1 & Drawing

of 13

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Section 2 — Further development details
7) Does the proposed development application involve any of the following?

 

 

 

 

 

Material change of use C1 Yes — complete division 1 if assessable against a local planning instrument
Reconfiguring a lot CJ Yes — complete division 2

Operational work [A Yes — complete division 3

Building work C1 Yes — complete DA Form 2- Building work details

 

 

Division T= Material change of use

Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a
local planning instrument.

8.1) Describe the proposed material change of use

 

Provide a general description of the Provide the planning scheme definition | Number of dwelling | Gross floor
proposed use (include each definition in a new row) units (if applicable) area (m?)
(if applicable)

 

 

 

 

 

 

8.2) Does the proposed use involve the use of existing buildings on the premises?
(Yes
CI No

Biviston 2 — Reconfiguring a lot

Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.
9.1) What is the total number of existing lots making up the premises?

 

 

 

 

 

9.2) What is the nature of the lot reconfiguration? (tick all applicable boxes)

 

 

Cd Subdivision (complete 10) (Dividing land into parts by agreement (complete 11)
C Boundary realignment (complete 12)) (J Creating or changing an easement giving access to a lot
from a constructed road (complete 13))

 

 

 

 

10) Subdivision

 

10.1) For this development, how many lots are being created and what is the intended use of those lots:

Intended use of lots created Residential Commercial Industrial Other, please specify:

Number of lots created
10.2) Will the subdivision be staged?

CI Yes — provide additional details below
LINo

How many stages will the works include?

 

 

 

 

 

What stage(s) will this development application
apply to?

 

 

 

 

Page 4
DA Form 1 — Development application details
Version 1.4— 15 December 2023
Log in to download the original file

DA Form 1 & Drawing.pdf · 6.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.