Original source · versioned page text
Decision Notice MCU16/0112 & OPW16/0209 - 85 Rene St Noosaville
Officer: :Glen Conforti Direct Telephone: 07 53296241 Reference: :MCU16/0112 & OPW16/029 Your Reference: :Z40770 23 January 2017 Raftsea P/L C/- Downes Survey Group Pty Ltd PO Box 39 NAMBOUR QLD 4560 Dear Sir Decision Notice Sustainable Planning Act 2009 I refer to your application and advise that on 19 January 2017, Council decided to approve the application in full subject to conditions. Details of the decision are as follows: application details Application No: MCU16/0112 & OPW16/0209 Street Address: 85 Rene Street, Noosaville Real Property Description: Lot 4 SP 244573 Planning Scheme: The Noosa Plan (16 September 2013) Decision details The following type of approval has been issued: Development Permit for Material Change of Use of Premises - Industrial Business Type 2 & Entertainment & Dining Business Type 1 Development Permit for Operation Works – (Stormwater, landscaping, access and carparking) Relevant period of approval The relevant period for this development approval is 4 years starting the day that this development approval takes effect. assessment manager conditions MATERIAL CHANGE OF USE PLANNING When Conditions must be Complied With Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 02 of 04 K Ground /Site Floor Plan, prepared by Ace Space Design 25.10.16 03 of 04 K Mezzanine Floor Plan, prepared by Ace Space Design 25.10.16 04 of 04 K Elevations, prepared by Ace Space Design 25.10.16 Nature and Extent of Approved Use The Industrial Business Type 2 may operate 24 hours. The Entertainment and Dining Business must not operate outside the hours of 10am to 12 midnight. Any display and retail sale of goods must remain an ancillary component to the approved use and must not exceed 20% of the gross floor area. Building Height The maximum height of the development must not exceed 10 metres above the finished ground level and the natural ground level. Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $15,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to arranging the pre-start meeting. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Building Design All air conditioning units or other mechanical equipment must be fully enclosed or screened such that they are not visible from the street frontages. To improve street appearance the masonry wall to the northern side of the east elevation must incorporate a mix of materials to provide depth and interest to the façade. Amended plans must be to the satisfaction of the Chief Executive Officer and submitted to Council prior to the pre-start meeting for operational works. Water & Sewer Connections An underground connection to reticulated water and sewerage must be provided to the development site in accordance with the standards and requirements of Northern SEQ Distributor–Retailer Authority (Unitywater). A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater) must be submitted to Council that certifies an underground connection to reticulated water and sewerage has been provided to the development site. ENGINEERING A minimum of 26 car parking spaces and 2 motor cycle spaces must be provided on the site which includes 1 disabled space. Bicycle parking spaces and end of trip facilities must be provided in accordance with the approved plans. All car parking areas and access driveways must be line marked and maintained exclusively for vehicle parking and manoeuvring and kept in a tidy and safe condition at all times. Any awnings and/or other structures must not obstruct or impact on the function of the loading zone. Stormwater Drainage Stormwater runoff from the development must be disposed of on-site generally in accordance with the approved engineering plans without causing scour or damage to the subject site or any adjoining property. Electricity and Telecommunication Services Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary conduits, pits and pipes to accommodate the future connection of optic fibre technology telecommunications. Landscaping Works The development site must be landscaped. The works must be undertaken in accordance with the approved landscape plans and Planning Scheme Policy PSP 3 Landscaping Plants and Guidelines. All landscape works must be established and maintained in accordance with the approved design for the life of the development, and in a manner that ensures healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached. ENVIRONMENTAL HEALTH Noise Mechanical plant and equipment, a/c units, motors, refrigeration equipment, compressors, pumps etc. must be situated within the building or suitably provided with noise reduction measures and located as to prevent a noise nuisance beyond the boundary of the site and not exceed the levels specified in Table 1. Table 1 NOISE LIMITS AT A SENSITIVE RECEPTOR (Excludes On-Site Ancillary Dwelling Unit – Caretakers Unit) PERIOD Noise level at noise sensitive place measured as the adjusted maximum sound pressure level (Lamax, adj,T) 7am – 6pm Background noise level (LAbg,T) plus 5 dB(A) 6pm – 10pm Background noise level plus 5 dB(A) 10pm – 7am Inaudible NOISE LEVELS AT COMMERCIAL PLACE PERIOD Noise level at a commercial place measured as the adjusted maximum sound pressure level (Lamax, adj,T) 7am – 6pm Background noise level (LAbg,T) plus 10 dB(A) 6pm – 10pm Background noise level plus10 dB(A) 10pm – 7am Background noise level plus 8 dB(A) When requested by Noosa Council, a Noise Impact Assessment Report (NIAR) showing monitoring and recording of noise levels must be undertaken to investigate any non-vexatious complaint caused by noise emissions from operations at the premises. Such monitoring must be undertaken and completed within a reasonable and practicable timeframe as nominated by council and be performed by a suitably qualified and experienced person. The NIAR must be submitted to Council detailing the results of such monitoring and recommendations for any measures to achieve compliance with limits outlined in Table 1 of this Decision Notice. Measurement of sound pressure levels (adjusted for tonality and impulse) must be in accordance with Australian Standard AS1055.1 “Acoustics – Description and measurement of environmental noise – General procedures”. For the purpose of measuring and certifying relevant noise conditions and reporting (eg. mechanical plant and equipment, a/c units, motors, refrigeration equipment, compressors, pumps etc), a suitably qualified person is either: a Registered Professional Engineer of Queensland, or an environmental consultant with a minimum of 3 years current experience in the field of acoustics. Outdoor Lighting Devices Lighting associated with the use must be designed, sited, installed and tested to comply with Table 2.1 & 2.2 of Australian Standard AS4282-1997 “Control of the obtrusive effects of outdoor lighting” using a control level of 1. Certification must be submitted to Council from a qualified person which certifies that all outdoor lighting devices comply with the requirements of this Decision Notice at the time of commissioning. For the purpose of certifying outdoor lighting devices for the development, a qualified person is: a Registered Professional Engineer of Queensland; an environmental or electrical design consultant with a minimum of 3 years current experience in the field of outdoor lighting. Odour Odour emissions must be managed in accordance with the Noise and Odour Assessment Noosa Micro Brewery prepared by GHD Pty Ltd and dated 17 August 2016. Waste Disposal The developer must provide waste storage and disposal facilities in accordance with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises”. The facilities must include an external impervious area correctly sized for all refuse and recycling containers and suitably screened from public places and neighbouring properties. A bin wash area is required with a cold-water tap, hose and drain outlet connected to sewer, via a bucket trap. The drain outlet must be designed to prevent storm water entry to the sewerage system. This can be achieved with a nib wall 50mm high and up to 700mm x 700mm wide (max 0.5m²), or alternatively the waste area can be roofed, or any other design approved by Council. Refuse containers must be provided in accordance with the requirements of the Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management) Regulation 2000, for the storage and collection of refuse. OPERATIONAL WORKS Approved Plans Development undertaken in accordance with this operational works approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 02 of 04 - Project No: 15.253 K Ground/Site Plan, prepared by Ace Space Design 25.10.16 26232 – 0W3 Operational Works: Earthworks & Retaining Wall Plan, prepared by SCG Consulting Engineers Aug 2016 26232 – 0W4 Operational Works: Driveway & Access Plan, prepared by SCG Consulting Engineers Aug 2016 LD 1 A Specifications, prepared by Anembo Consultants 8.9.16 LD 2 A Details, prepared by Anembo Consultants 8.9.16 LD 3 A Schedules & Legend, prepared by Anembo Consultants 8.9.16 LP 1 A Landscape Plan, prepared by Anembo Consultants 8.9.16 LP 5 A Landscape Plan, prepared by Anembo Consultants 8.9.16 Landscaping Works Four (4) suitable native trees with a pot size of 45 litres must be planted evenly spaced to the garden adjoining the front boundary (between the entry and exit points). All landscape works must be constructed and undertaken generally in accordance with the approved plans and conditions detailed in this Decision Notice. Turfed areas within the Rene Street road reserve must: Join smoothly and level with adjoining surfaces. Be free of disease, pest, weeds, rock and debris. Landscape works must: In accordance with Planning Scheme Policy PSP 3 Landscaping Plants and Guidelines. Take all measures to prevent Fire Ants (or any stages of the fire ant life cycle) entering the work site. Take all measures to prevent Myrtle Rust infection. Not obstruct overland flow paths and must include adequate drainage to minimise ponding. Mulch or any floatable material must not be located in swales, overland flow paths or around grated drains. Not encroach onto kerb and channel, footpaths, pedestrian or vehicular/ circulation areas. Not restrict access to service meters. Delineate all garden to grassed area interfaces with a hard edge. Ensure sales signage and ancillary infrastructure is not installed within the road reserve. Ensure permanent irrigation is not installed within the road reserve. Ensure all weeds and debris are removed from planting areas prior to planting. Ensure mulch is aged, comprised of leaf and limb material of varying sizes, free of foreign matter including anthropogenic waste, rock, soil / sediment contamination and is applied to ensure a minimum 100mm depth once settled. Soil provided for landscaping must provide for the site specific vegetation performance objectives. All landscape works must be completed prior to the commencement of use. PRIOR TO COMMMENCENT OF WORKS Engineering At least 5 working days prior to any works commencing, written advice must be provided to Council detailing: The name, contact details and ACN for the supervising Registered Professional Engineer of Queensland (RPEQ) and Principal Contractor. Proposed dates for commencement and completion of construction. The principal contractor must have all the appropriate insurance and public liability documentation to carry out the works. The principal contractor is also responsible to ensure that any subcontractors also have the appropriate insurance and public liability documentation. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart meeting*. The contact number to arrange a prestart meeting is 5329 6291. The prestart meeting must include the relevant parties for the following aspects of the works: Civil engineering works. Landscape works. Erosion and sediment control works. * (Refer to Advisory Note) Copies of the approved plans duly signed by the consultant Registered Professional Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer Construction at the “prestart” meeting. A detailed condition report including photographs of the frontage of the site and the access driveway for construction must be completed and submitted to Council prior to the prestart meeting. A condition report including photographs of all fences and retaining walls bordering the site and any buildings, structures, pathways, landscaping features etc on adjoining properties that could potentially be impacted on by the proposed earthworks and construction works must be completed and submitted to Council prior to the prestart meeting. A Construction Management Plan must be submitted to Council for approval prior to the prestart meeting and must specifically include/address the following: Traffic Management during all aspects of the construct phase including: A Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures to be installed prior to construction. Fencing to the work site during the construction phase to ensure the safety of the public and the road users. Sufficient parking arrangements for trucks, machineries and construction workers without adversely impacting on traffic movements on the shared driveway on the access easement and/or the public road. Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures. Works programme identifying key components of the works and their respective durations. The proposed dates for the commencement and the completion of the works. Effective procedures and measures to minimise adverse environmental impact on other properties and roads users including noise and dust emission. Establishment of a communication protocol with the adjoining owners (particularly the users of the shared access driveway) and any other affected parties to advise of construction times, impacts on traffic and services and any other relevant issues. Identification of communication and complaint management procedures including: Contact details for the on-site manager. Dispute resolution procedures. Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring. Any alteration to existing services or conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works. General The developer must meet any costs to repair damage to any Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit. Where municipal works are involved, such confirmation must be submitted for the respective hold points prior to any site inspection by Council Officers. All works must be constructed and work procedure undertaken in accordance with: The approved plans and conditions detailed in this Decision Notice. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines, particularly PSP 5 – Engineering Design Standards – Roads, Drainage and Earthworks. The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site. DURING CONSTRUCTION Driveways and parking The following must be complied with during the construction of the required driveways and parking areas: The driveway must be constructed so as not to concentrate stormwater runoff or ponding onto other properties and/or the road verge. Parking areas must be line marked in accordance with the approved plans For public safety, the finish levels of crossover must ensure smooth transition to existing surfaces such as the grassed verge and existing concrete driveway. Where applicable, underground service conduits for water supply, electricity and any other services must be provided as part of the access driveway works. Have a minimum clearance of 500mm from any Unitywater/Telstra asset, unless a written approval is obtained from Unitywater/Telstra and submitted to Council. Pavement design for privately owned works must be undertaken in accordance with the relevant standards and be designed and constructed to comply with the Disability Discrimination Act (DDA), Access to Premises Standard and relevant sections of AS1428 Design for access and mobility. Structural integrity of the driveway and car park areas will remain the responsibility of the property owner/developer and must be certified by an RPEQ. Earthworks All earthworks associated must be undertaken in accordance with the provisions of AS 3798 Guidelines on Earthworks for Commercial and Residential Development, with geotechnical supervision and testing undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 2’ as defined in Appendix B and the approved plans. All Earthworks and construction works must be carried out taking into consideration the protection of any existing above and below surface services, and the stability and protection of fences and any buildings and structures on the adjoining properties. Damage to Services and Assets Any damage caused to existing services, streetscape and assets (including kerb and footpath) as a result of the development works must be repaired at no cost to the asset owner at the following times: Where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or Where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. Erosion & Sediment Control A construction hold point must be established with a council delegate and supervising RPEQ prior to commencement of cut to fill earthworks for each stage of the development. The hold point must be held as soon as reasonably practical and prior to the first rain event forecast following initial tree clearing or removal of soil stabilising material for each stage. At the hold point inspection, all required sediment basins, drains and bunds to divert waters away from disturbed soil or soils about to become exposed through cut to fill activities must be installed. All areas that will not require earthworks in the imminent cut to fill operation must be stabilised to prevent entrainment of sediments into receiving waters. Cut to fill earthworks must not commence until after the Supervising RPEQ has certified that all installed erosion and sediment controls required by this approval are sized in accordance with conditions of the approval and the written acceptance of the certification is provided to the supervising RPEQ by Council officers. Offsite run-off must be diverted around exposed soils on the site without entraining additional sediments. Discharge from measures to divert the offsite water must not cause run-off impacts to other properties. Measures installed to divert the upstream water must be designed and certified by the supervising RPEQ and installed prior to commencement of bulk earthworks. Any temporary drainage works to manage stormwater flows during the construction phase of development must be designed by the supervising RPEQ to provide a 150mm freeboard and convey the following flow capacities without resulting in visible scour within flow paths: 1 in 2 year event where disturbed area open for less than 12 months 1 in 5 year event where disturbed area open for 12-24 months 1 in 10-year ARI event where disturbed area open for 24 months Minimum 1 in 1 year ARI Hydraulic capacity for temporary culvert crossings E&SC measures must be installed and maintained to ensure any waters discharged from the site up to and including a 85%ile 5 day rain event (or 46mm rainfall event) contain less than 50mg Total Suspended Solids per litre. All relevant measures detailed in the International Erosion and Sediment Control Book 2008 or Sunshine Coast Manual for Erosion and Sediment Control must be installed to minimise the amount of sediment leaving the site in rainfall events that exceed 85%ile 5 day or 46mm. Peak 1-year ARI event discharge from the construction phase of development must be equivalent to the pre-development peak 1-year ARI event discharge. Measures included in calculations to achieve management of peak flows must be incorporated into the development in a manner that is consistent with the Noosa Plan, all conditions of the approval and does not interfere with adjoining properties. Prior to the completion of the development, all site surfaces must be effectively stabilised. For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination. Water Sensitive Design All hardstand areas must drain to a bioretention basin with active filter media area sized to be 2.2% of the contributing catchment. Active filter media area is the area of the bioretention basin surface that is not covered by any impermeable structure such as a sediment forebay, inlet pipe riser, etc. Amended drawings must be provided to Council for approval prior to arranging a pre-start meeting. The amended stormwater drawings must: demonstrate that each catchment on site drains to a bio retention basin sized to 2.2% of the catchment area. The bioretention basins must be constructed in accordance with those drawings. demonstrate that appropriate detention is provided to not increase peak flow runoff from the site in a Q1, 5, 50 and 100 year event. The appropriate detention infrastructure must be installed in accordance with those drawings. Prior to the commencement of use, the supervising RPEQ must certify that all hardstand areas of the development drain to necessary detention tanks as well as a bioretention device designed and constructed in accordance with all relevant conditions of this approval, the Water by Design Bioretention Technical Design Guidelines, relevant aspects of the IPWEAQ Standard Drawing WSUD-drawing series and Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009). During construction and establishment of the bioretention devices, the supervising RPEQ must certify forms contained in section 3.15 of the Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009). These forms and certification must be submitted to council prior to the sealing of the survey plan. A construction hold point must be established with a council delegate once the bioretention device underdrainage pipe work is installed. At the time of inspection, a sample of the drainage layer, transition layer, and filtration media materials must be stockpiled onsite accompanied by laboratory results that demonstrate that the media complies with the specifications contained in the latest version of the Guidelines for Soil Filter Media in Bioretention Systems (Facility for Advancing Water Biofiltration) and that the minimum hydraulic conductivity of 180mm/hr or as specified on the approved engineering plans will be achieved. The drainage layer, transition layer, and filtration media materials shall not be installed until the catchment draining to the bioretention device has 80% groundcover as determined by council’s delegate. Eighty per cent (80%) of the catchment flowing to the bioretention basin must be effectively stabilised prior to the construction hold point for the Bioretention device. Following the commencement of use, the bioretention devices must be regularly maintained in accordance with the Water By Design Maintain Vegetated Assets Guideline. Records of all maintenance activities must be retained on site for 5 years and made available to Council Officers on request. Bioretention Devices - Landscaping Landscaping must include a mixture of at least five of the following species for planting in the bioretention basin extended detention surface at a minimum density of 8 plants/m²: Carex appressa Carex fascicularis Ficinia nodosa Juncus usitatis Lomandra longifolia Ghania sieberiana Landscaping for the areas surrounding the bioretention basin filter media footprint must be arranged to minimise shading to the filter media footprint are. Suitable plants include the following: Carex appressa Carex fascicularis Ficinia nodosa Juncus usitatis Lomandra longifolia Ghania sieberiana Banksia robur Dianella brevipendunculata Themada triandra Cymbopogan refractus Melaleuca thymifolia Where landscaping/garden beds are proposed adjacent to the bioretention basin, or where the basin is located adjacent to naturally forested areas, a 900mm deep root barrier must be installed to the interface between the landscape/garden/forest area and the bioretention basin to prevent root intrusion to the biobasin infrastructure. Where required, mulch within the batters of bioretention basins must be installed in a manner that it will not escape into receiving stormwater drainage infrastructure or water courses. Bioretention Devices - Education The development must provide approved permanent signage to educate the public on the function of the bioretention basin. The wording for the signage for each bioretention basin is to include: “BIORETENTION BASIN - This bioretention basin reduces the pollution of our waterways by reducing the amount of heavy metals, litter, suspended solids, and nutrients discharged to Eenie Creek”. FOLLOWING CONSTRUCTION Certification Upon completion of the work and prior to the final inspection a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit and applicable engineering standards. A final inspection and approval of the completed works by Council’s Inspector is required. Please contact Council on 5329 6291 to arrange for the inspection referral agencies Not Applicable Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: PLANNING Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act. Equitable Access and Facilities The plans for the proposed building work have NOT been assessed for compliance with the requirements of the National Construction Code - Building Code of Australia (Volume 1) as they relate to people with disabilities. Your attention is also directed to the fact that in addition to the requirements of the National Construction Code as they relate to people with disabilities, one or more of the following may impact on the proposed building work: the Disability Discrimination Act 1992 (Commonwealth); the Anti-Discrimination Act 1991 (Queensland); and the Disability (Access to Premises – Buildings) Standards. Development Compliance Inspection Prior to the commencement of the use, please contact Council's DA Planning Section to arrange a Development Compliance Inspection. Sustainability In line with Noosa Council’s Corporate Plan, Council seeks to encourage sustainable building design for residential and commercial development. Council encourages the use of sustainable building materials, energy efficient fittings, solar hot water, photovoltaic systems (including the use of inverter/chargers), water saving devices and rainwater harvesting. For further information go to http://www.noosa.qld.gov.au/sustainable-homes Infrastructure Charges This Development Permit will trigger an “Infrastructure Charge Notice” to be issued in accordance with Council’s “Charges Resolution” made pursuant to the Sustainable Planning Act 2009 and in conjunction with the State Planning Regulatory Provision (Adopted Charges). ENGINEERING Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Amendments to plans, in accordance to the relevant conditions, and/or any requested changes to the conditions of this decision notice must be made within the appeal period or the suspended/extended appeal period. Alternatively, an application for “Request to change an existing approval” under the Sustainable Planning Act 2009 must be made along with Council’s applicable fees. It should be noted prior to arranging a pre-start meeting the Right of Appeal Period of 20 business days should have been passed or the applicant has have confirmed by a letter or an email that he/she has accepted the conditions of Decision Notice and waived his/her appeal right. Erosion and Sediment Control Accepted best practice standards include: the Sunshine Coast Regional Council Manual for Erosion and Sediment Control V1.2 or other superseding document subsequently adopted by Council; Best Practice Erosion and Sediment Control, International Erosion Control Association (2008) As a general rule, a site is determined to have achieved effective short-term stabilisation if at the completion of the works: Methods of stabilisation are: appropriate for slopes and slope lengths; and are consistent with best practice environmental management practices such as in the Manual for Erosion and Sediment Control or the IECA Manual; and Stormwater runoff from the site is not currently, and is not likely to result in visible evidence of sedimentation or erosion, or lead to water contamination. If at the time of the completion of the works, the method of short-term stabilisation has not achieved a level of stability that Council's Officers believe will have a high probability of achieving long term stability, Council Officers may take the following matters into consideration in determining whether the site is capable of achieving medium to long-term stability: Evidence that the site has been effectively stabilised in the short term; Evidence that soil has been adequately ameliorated; Evidence that seed of annual and perennial grass species has been applied at an adequate rate; and That grass seed has germinated at a density that is likely to achieve an effective grass cover. ENVIRONMENTAL HEALTH Environmental Protection Act It is a requirement of the Environmental Protection Act 1994 that if an owner or occupier of land becomes aware that a Notifiable Activity (as defined by Schedule 2 of the Environmental Protection Act 1994) is being carried out on the land, or that the land has been affected by a hazardous contaminant, they must, within 30 days after becoming so aware, give notice to the Department of Environment & Resource Management’s Contaminated Land Unit. A person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm is defined as any adverse effect, or potential adverse effect whether temporary or permanent and of whatever magnitude, duration or frequency on an environmental value and includes environmental nuisance. Persons and entities, involved in the civil, earthworks, construction and operational phases of this development, are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. The development must not cause any interference with the environment or amenity of the area by reason of the emission of excessive noise or vibration, odour, fumes, smoke, vapour, steam, soot, ash, dust, atmospheric pollutants, waste water, waste products, grit, sediment, oil or otherwise, or cause hazards likely in the opinion of the administering authority to cause undue disturbance or annoyance to persons or affect property not connected with the use. All sand, silt, mud, paint, cement, concrete, builder’s waste, contaminants or rubbish should not be permitted to enter or be placed where it could reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot fines under the Act apply for such offences. Noise – Building Works Noise from building works associated with commercial and or industrial development should comply with the following – Limited to between 6:30am to 6:30pm Monday to Saturday. All reasonable measures are taken to minimise noise emissions. Not permitted on Sunday or public holidays Food Business Licence Approval - Food Act 2006 The following is required for the manufacture of Brewed Products and the operation of the cafe: Any Licensable Food Business, as defined in Chapter 3 of the Food Act 2006, must obtain a Food Business License from council’s Environmental Health Section prior to use of those premises. Licence category will be “Multiple Food Preparation Area” if same applicant/licensee for the manufacturing and café application, OR separate applications for “Manufacturer LOW” and “Eating Establishment” will be required where there are different applicants/licensees for the food business categories. Plan drawings and an application(s) for a Food Business Licence is to be made to council’s Environmental Health Section for approval prior to any building approval, fitting out or use of the premises. A statement indicating the purpose of the food premises, type of food sold, proposed menu and maximum number of patrons at any time, is to accompany the application for plan approval. Construction and use of the food premises should comply with the “Food Premises Design Construction and Fit-Out Guide” and the Food Safety Standards. Plans and approval is required for any mechanical exhaust ventilation system, which must comply with Australian Standard AS1668.2-2002 “The use of ventilation and air-conditioning in buildings”. Certificates must be provided certifying the system (Form 15 & 16) complies with the Standard and be lodged with council prior to commencement of trade. Certification by a suitably qualified person* that the plan design and/or installation and operation of the mechanical exhaust ventilation system, complies with AS1668 and the requirements of this Decision Notice must be submitted to council. Completed Building Act 1975 Certificate Forms 15 and Form 16 must also be provided prior to commencement of food preparation. Horizontal hot air discharge from the mechanical exhaust ventilation system in the direction of neighboring properties and/or the street precincts is not desirable and may constitute an environmental nuisance under the Environmental Protection Act 1994. Toilets for customers and staff to be provided in accordance with the Building Code of Australia. Design advice is to be obtained from a building certifier on numbers and standards, including disabled access. Rainwater/Detention Tanks Any rainwater tanks/detention tanks must be constructed with mosquito proof screens (made from either brass, copper, aluminium or stainless steel), and constructed with a mesh size of no more than 1mm, and must be installed in a way that does not accelerate corrosion. Tanks that contain flap valves must be installed so that when closed, mosquitoes cannot pass through the valve. Where it is intended to use rainwater for drinking purposes, a suitable treatment system is required to be installed to disinfect or treat the water to microbiological and physical standards as described in the current Australian Drinking Water Guidelines to make it fit for drinking purposes. property notes The following property notes will be placed against the subject property in Council’s property record system: This site is provided with stormwater quality treatment devices which capture and store pollutants from stormwater runoff generated on the site. These devices are required to be routinely checked and serviced/cleaned out as per Maintaining Vegetated Stormwater Assets, Version 1 (Water by Design, 2009). Records of maintenance activities undertaken are to be kept and made available to council officers upon request. preliminary approval overriding planning scheme Not Applicable. further development permits required Development Permit for Building Works (All Building Work) self assessable codes The following codes for self-assessable development related to the development approval issued under this Decision Notice must be complied with. Advertising Devices Code submissions Nil reasons/grounds for approval Find that the tasting room and associated kitchen and preparation area is ancillary and complementary to the primary industrial use on-site and will not cause any reverse amenity issues and therefore is sufficient grounds to justify the decision despite the conflict with the Planning Scheme RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”. (Refer to Part 8 “Dealing with decision notices and approvals” - Division 1 “Changing decision notices and approvals during applicant’s appeal period” of the Sustainable Planning Act 2009.) OTHER DETAILS If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.noosa.qld.gov.au, or at Council Offices. Yours faithfully Kerri Coyle Manager Planning & Environment cc Unitywater Enc: Infrastructure Charge Notice Approved Plans/Documents Appeal Rights Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 The following is an extract from the Sustainable Planning Act 2009 (Chapter 7). MATERIAL CHANGE OF USE, RECONFIGURING A LOT & OPERATIONAL WORKS Division 8 Appeals to court relating to development applications and approvals 461 Appeals by applicants (1) An applicant for a development application may appeal to the court against any of the following— (a) the refusal, or the refusal in part, of the development application; (b) any condition of a development approval, another matter stated in a development approval and the identification or inclusion of a code under section 242; (c) the decision to give a preliminary approval when a development permit was applied for; (d) the length of a period mentioned in section 341; (e) a deemed refusal of the development application. (2) An appeal under subsection (1)(a), (b), (c) or (d) must be started within 20 business days (the applicant’s appeal period) after— (a) if a decision notice or negotiated decision notice is given—the day the decision notice or negotiated decision notice is given to the applicant; or (b) otherwise—the day a decision notice was required to be given to the applicant. (3) An appeal under subsection (1)(e) may be started at any time after the last day a decision on the matter should have been made. 462 Appeals by submitters—general (1) A submitter for a development application may appeal to the court only against— (a) the part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) the part of the approval relating to the assessment manager’s decision under section 327. (2) To the extent an appeal may be made under subsection (1), the appeal may be against 1 or more of the following— (a) the giving of a development approval; (b) any provision of the approval including— (i) a condition of, or lack of condition for, the approval; or (ii) the length of a period mentioned in section 341 for the approval. (3) However, a submitter may not appeal if the submitter— (a) withdraws the submission before the application is decided; or (b) has given the assessment manager a notice under section 339(1)(b)(ii). (4) The appeal must be started within 20 business days (the submitter’s appeal period) after the decision notice or negotiated decision notice is given to the submitter. 463 Additional and extended appeal rights for submitters for particular development applications (1) This section applies to a development application to which chapter 9, part 7 applies. (2) A submitter of a properly made submission for the application may appeal to the court about a referral agency’s response made by a prescribed concurrence agency for the application. (3) However, the submitter may only appeal against a referral agency’s response to the extent it relates to— (a) if the prescribed concurrence agency is the chief executive (environment)—development for an aquacultural ERA; or (b) if the prescribed concurrence agency is the chief executive (fisheries)—development that is— (i) a material change of use of premises for aquaculture; or (ii) operational work that is the removal, damage or destruction of a marine plant. (4) Despite section 462(1), the submitter may appeal against the following matters for the application even if the matters relate to code assessment— (a) a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive (fisheries); (b) a referral agency’s response mentioned in subsection (2). 464 Appeals by advice agency submitters (1) Subsection (2) applies if an advice agency, in its response for an application, told the assessment manager to treat the response as a properly made submission. (2) The advice agency may, within the limits of its jurisdiction, appeal to the court about— (a) any part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) any part of the approval relating to the assessment manager’s decision under section 327. (3) The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter. (4) However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice agency may not appeal the decision. 465 Appeals about decisions relating to extensions for approvals (1) For a development approval given for a development application, a person to whom a notice is given under section 389, other than a notice for a decision under section 386(2), may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. (3) Also, a person who has made a request under section 383 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 466 Appeals about decisions relating to permissible changes (1) For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval— (a) if the responsible entity for making the change is the assessment manager for the application— (i) the person who made the request; or (ii) an entity that gave a notice under section 373 or a pre-request response notice about the request; (b) if the responsible entity for making the change is a concurrence agency for the application—the person who made the request. (2) The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376. (3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 467 Appeals about changing or cancelling conditions imposed by assessment manager or concurrence agency (1) A person to whom a notice under section 378(9)(b) giving a decision to change or cancel a condition of a development approval has been given may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. [word/footer1.xml] Page 18 of 20 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 20 [word/header1.xml] MCU16/0112 [Attachment: image3.png (image text)] a mm NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.