3365 change representations seeking negotiated decision notice Op Works issue_signed

of 7

Page text read automatically using OCR, there may be inaccuracies

Ss W RVEYO R Director Brian Naismith

Bach Applied Science
(Surveying)
Consulting Cadastral
Surveyor

Preferred Condition 10 - Construction Management Plan (CMP)

Submit an initial Construction Management Plan to Council prior to the pre-start
meeting. The Construction Management Pian must specifically address the following:

a.

traffic management during vegetation clearing stages of the consiruction
phase inciuding:
i. adequate road signage and traffic control measures.
i. maintenance of safe vehicle and pedestrian access across
the frontage of the site;
ii, proposed fencing to the site during the clearing phase of the
development;
iv. adequate parking arrangements for construction workers,
residents and deliveries; and
¥.. NO queuing of tricks is permittec! on residential streets;
maintenarice and protection of water quality and existing drainage lines
through the construction site through the implementation of appropriate
erosion and sediment control measures;
works programme identifying key components of the clearing works and
their respective durations;
establishment of a communication protocol with adjoining owners and
local residents affected by tie clearing works, to advise of agreed! clearing
times, impacts on access arc services and other relevant issues;
include @ post out to the neighbouring and nearby residents advising of
the proposed development, the expected clearing time frames and the site
contact details;
include signage in a prominent location at the front of the site advising of
the proposed development approval number and the site contact details;

We request Council amend the decision notice conditions to allow preparation and
submission of the CMP in stages reflecting upcoming works. ie; introduce a new
condition requiring subrnission of a later CMIP prior to bulk earthworks and civil works
commencement.

Surveyor Pty Lic | ABN 97625813998
30 Pottery St Pomona Q 4568
M 0477 925 871 | E: naismith4 1@amail. sen

 

 

Log in to download the original (3365 change representations seeking negotiated decision notice Op Works issue_signed.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.