PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT
It is noted that the 90th percentile TSS concentration for Precinct E2 is less than the
average also because the TSS pollutant load is dominated by high pollutant concentration
events. The top 10% of high pollutant events are therefore accounted for in the average
but not accounted for in the 90th percentile value.
Based on these results the proposed Noosa Springs development satisfies the
requirements of Condition 49, Part 1a.
4.4.2 Monitoring Protocol
Condition 49 Part 1b specifies that a monitoring protocol be developed to confirm that any
nutrients or prescribed water contaminants at risk of runoff from the development site is
not responsible for adverse water quality matters within the Noosa Springs Lake System.
To meet this condition it is proposed that event based monitoring be undertaken on
discharges from the site prior to entering the Noosa Springs Lake System. Monitoring will
sample the same constituents currently sampled within the Noosa Springs Lake System
and be triggered by a storm event greater than 40mm.
Analysis of Noosaville rainfall data for years with complete rainfall data (2010 to 2016)
shows that a 40mm trigger will allow for collection of a minimum of 5 samples. On
average this will trigger collection of 10 events per annum. It will also be proposed that if
by the end of November, 5 rainfall events have not been collected for that year the trigger
will be reduced to 20mm to ensure that the minimum of 5 rainfall events are likely to be
collected.
The monitoring strategy will be as follows:
Following Parameters will be monitored
Nitrite plus Nitrate as N (NOx)
Total Kjeldahl Nitrogen (TKN)
Total Nitrogen as N (TKN + NOx)
Total Nitrogen as N
Total Phosphorus as P
Reactive Phosphorus as P (Dissolved)
Reactive Phosphorus – Filtered
Suspended solids
Monitoring will be undertaken by a suitably qualified person using NATA accredited
methods
Water quality monitoring results must be retained in electronic form by the property
owner for a minimum of 5 years and will be made available to Noosa Council on
request
Samples will be collected at the 3 stormwater manholes immediately upstream of the 3
legal points of discharge between half an hour and 24 hours following commencement
of a trigger rainfall event.
Job No. M7130_001 Page 10
Rev 4 : 7 December 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Noosa Springs SMP_Rev 4.pdfRelated documentApplication case desk ↗
About this file
- File size
- 13.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.