ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT
1. INTRODUCTION
Engeny Water Management (Engeny) has been commissioned by Altum Constructions to
prepare a Detailed Stormwater Quality Management Plan (DSQMP) which complies with
the Noosa Council CDA Decision Notice and associated conditions, issued to Altum
Construction on 11 March 2016. The report includes information pertaining to items of
Council’s Information Request dated 20th October 2017 not challenged in the information
response.
This DSQMP has been prepared in support of the development applications for the
proposed 155 multiple dwelling units and associated facilities on Resort Drive, Noosa
Heads (Application No: 132005.1133.4) – Precinct F, and 44 multiple dwellings – Precinct
E2. The key objective of the DSQMP includes stormwater quality modelling to develop a
treatment train which satisfies the requirements of Conditions 46-50 in the Noosa Springs
Precinct F decision notice.
The DSQMP has been prepared in accordance with the following:
Queensland Urban Drainage Manual (2013).
MUSIC Modelling Guidelines (Water by Design 2010).
Job No. M7130_001 Page 1
Rev 4 : 7 December 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Noosa Springs SMP_Rev 4.pdfRelated documentApplication case desk ↗
About this file
- File size
- 13.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.