Original source · versioned page text
boreen_point_north_IRR_MCU13-0052.
Aurecon Australia Pty Ltd ABN 54 005 139 873 T +61 7 3173 8000 32 Turbot Street F +61 7 3173 8001 (Locked Bag 331 Brisbane QLD E [email protected] 4001) W aurecongroup.com Brisbane Queensland 4000 Australia 6 November 2013 Attn: Jack Lewis Sunshine Coast Regional Council Locked Bag 72 Sunshine Coast Mail Centre, QLD, 4560 Application Number: MCU13/0052 Response to Information Request for MCU13/0052 - Material Change of Use (Impact Assessable) for a ‘Service & Utility Type 3 Tower’ located at 153 Lake Flat Road, Boreen Point 4565 (Lot 2 on RP126723) I refer to your letter dated 23 April 2013 requesting further information for a Telecommunications Facility at 153 Lake Flat Road, Boreen Point 4565 (Lot 2 on RP126723). A response to each of the matters raised in your letter is provided below. Visual Amenity The Specific Outcome O39 of the Infrastructure Uses Code requires the proposed monopole is visually integrated with its landscape so as not to be visually dominant or obtrusive. 1. Please provide a photomontage of the proposed monopole adjacent to the site along Lake Flat Rd looking towards the proposed monopole. Response One photomontage has been prepared to illustrate how the proposed facility will appear when viewed from along Lake Flat Road looking east towards the proposed monopole. As can be seen in the attached photomontage, the visual and landscape character of the locality will be maintained with the addition of the proposed facility. It is therefore considered that the proposed facility meets Specific Outcome O39 of the Infrastructure Uses Code. It is our recommendation that the monopole is painted ‘pale eucalypt’ in order to blend with the mature vegetation on site and existing power poles. This is requested to be conditioned by Council. Reasons for Approval Despite the Conflict with the Scheme Section 326(1)(b) of the Sustainable Planning Act 2009 seeks the assessment manager’s decision must not conflict with the Planning Scheme, unless there are sufficient grounds to justify the decision, despite the conflict. The Service & Utility Type 3 use is identified as an inconsistent use on the proposed site. 1. Please provide at least three succinct reasons for approval of the proposed development, despite this conflict with The Noosa Plan. Response Despite conflicts with The Noosa Plan, NBN Co considers Council should approve the proposed development for the following reasons: 1. The Boreen Point North facility is necessary to relay data out from the proposed Boreen Point & Cootharaba facilities back into the broader NBN network.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.