Council archive · source document
Planning Report 12612 DA · 131998.981050.1
Attached to the e-mail Change to DA (Conditions 15 & 16 decks on middle floor) - 131998.981050.1.
10 ll 12 6 The developer shall bear the cost of alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site. The developer shall connect to Council's existing water supply and sewerage reticulation systems at the developer's expense to the standards and requirements of Council's Shire Engineer. The developer shall provide metered water connections from the water supply system to the proposed development, in accordance with Council's standards and to the satisfaction of the Shire Engineer. The developer is to construct a vehicle crossover in accordance with Council’s Engineering Design Standards and in addition is to construct a 1.2 metre wide concrete footpath for the full frontage of the site. In this regard, plans prepared by a registered civil engineer are to be submitted to and approved by Council prior to the issue of a Development Permit for Building Works. The developer shall pay contributions in accordance with Council's Policy on Water Supply Headworks Contributions and Sewerage Headworks Contributions. An estimate only of the charges as at December 1997 under the current policy is as follows:- Water Supply $3,411 Sewerage $2,521 TOTAL: $5,932 Please note that the headworks charges will alter in accordance with Price Index variations or if any amendment is made to Council's policy. Headworks contributions shall be calculated and paid in accordance with either of the following alternatives:- 12.1 Payment to be made prior to the issue of a Development Permit for building works in the amount calculated under the Policy at that date; or 12.2 Payment may be deferred to a date:- 12.2.1 prior to Council sealing plans of the development for titling purposes; 12.2.2 prior to the issue of a Certificate of Classification for any building works; or 12.2.3 prior to commencement of the approved use at the relevant premises; PO-3 g:\rowena\12612da-rs.doc 24/08/98
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Planning Report 12612 DA.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.