Original source · versioned page text
16-003302-4100
From the archive 16-003302- Stage 4&5.zip, inside Operational Works Application OPW17/0055. File date in the archive: 2017-02-10 15:27.
DocuSign Envelope ID: 2DF72822-3FBA-4BD8-B007-B816B9AD559A
PALM LAKE RESORT
19 TRADING POST ROAD, COOROY
Sheet
STAGE 4 & 5 - FOR APPROVAL Number
Sheet Title
GENERAL
FOR PALM LAKE WORKS PTY LTD 4100
4101
4102
COVER SHEET
LEGEND
NOTES
BULK EARTHWORKS
4200 BULK EARTHWORKS LAYOUT PLAN
4201 BULK EARTHWORKS SECTIONS
4202 RETAINING WALLS TYPICAL DETAILS
4203 EROSION AND SEDIMENT CONTROL LAYOUT PLAN
PROJECT CONSTRUCTION HOLD POINT
4204 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES
ROADWORKS AND DRAINAGE
SITE ONCE THE BASE OF MANHOLES, INSPECTION PITS, GULLIES AND
FIELD INLETS FOR STORMWATER DRAINAGE AND SEWER
4300
4301
SURVEY SETOUT LAYOUT PLAN
ROADWORKS AND DRAINAGE LAYOUT PLAN
RETICULATION HAVE BEEN POURED, FURTHER CONSTRUCTION
4302 THE PROMENADE LONGITUDINAL SECTION & DETAILS SHEET 1 OF 5
STAGE 5 SHALL NOT PROCEED UNTIL THE SUPERINTENDENT AND OR
4303 CLEARWATER DRIVE LONGITUDINAL SECTION & DETAILS SHEET 2 OF 5
ENGINEER HAVE INSPECTED THE WORKS FOR FINISHED LEVELS
AND APPROVED CONSTRUCTION TO CONTINUE. 4304 BILLABONG PRD LONGITUDINAL SECTION & DETAILS SHEET 3 OF 5
4305 LONGITUDINAL SECTION & DETAILS SHEET 4 OF 5
4306 LONGITUDINAL SECTION & DETAILS SHEET 5 OF 5
4307 CARPARKING SETOUT SHEET 1 OF 1
4308 CARPARKING SETOUT SHEET 2 OF 2
4309 STORMWATER DRAINAGE CATCHMENT LAYOUT PLAN SHEET 1 OF 2
STAGE 4 STAGE 3 CONSTRUCTION NOTE 4310 STORMWATER DRAINAGE CATCHMENT LAYOUT PLAN SHEET 2 OF 2
THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH:
4311 STORMWATER DRAINAGE LONGITUDINAL SECTIONS SHEET 1 OF 2
· LANDSCAPE ARCHITECTS PLANS - TBA
4312 STORMWATER DRAINAGE LONGITUDINAL SECTIONS SHEET 2 OF 2
· STORMWATER QUALITY MANAGEMENT REPORT
EL
· SEDIMENT AND EROSION HAZARD ASSESSMENT 4313 STORMWATER CALCULATIONS TABLE SHEET 1 OF 2
M
l
4314 STORMWATER CALCULATIONS TABLE SHEET 2 OF 2
CT P
· GEOTECHNICAL REPORT
ST
· ELECTRICAL CONSULTANTS PLANS 4315 STORMWATER DRAINAGE STRUCTURE DETAILS SHEET 1 OF 2
RE
STAGE 1A
SPE
4316 STORMWATER DRAINAGE STRUCTURE DETAILS SHEET 2 OF 2
ET
OAD
(C
SEWERAGE RETICULATION
PRO
OO
4500 SANITARY SERVICES LAYOUT PLAN SHEET 1 OF 2
NS R
TR
RE
AD
4501 SANITARY SERVICES LAYOUT PLAN SHEET 2 OF 2
Y
I
RSO
4502 SANITARY SERVICES LONGITUDINAL SECTIONS SHEET 1 OF 3
CO
NG
MA CONSTRUCTION HOLD POINT
RA 4503 SANITARY SERVICES LONGITUDINAL SECTIONS SHEET 2 OF 3
NN
PO
PRIOR TO CONSTRUCTION THE CONTRACTOR
PEA
RA
EC
4504 SANITARY SERVICES LONGITUDINAL SECTIONS SHEET 3 OF 3
S
SHALL VERIFY LEVELS OF ALL EXISTING
TR
ST STAGE 2
TI
WATER RETICULATION
ON
RE CROSSINGS AND CONNECTION POINTS.
OA
4600 WATER SUPPLY NOTES AND DETAILS
ET
RO
D
4601 WATER SUPPLY LAYOUT PLAN
AD
STORMWATER QUALITY
)
LOCALITY PLAN 4700 NORTHERN BIO-RETENTION BASIN LAYOUT PLAN
N.T.S
FILE: H:\16\003302 - PALM LAKES BALANCE STAGES\6_MODEL\AUTOCAD\4100 COVER SHEET.DWG LAST SAVED BY:NEIL WINSON
4701 NORTHERN BIO-RETENTION BASIN SECTIONS
4702 STORMWATER QUALITY NOTES & DETAILS
NOOSA COUNCIL DATUM LEVEL: 1 DATUM LEVEL: 2 EXTERNAL WORKS
4800 LAMONT RD ROADWORKS AND DRAINAGE LAYOUT PLAN
4801 LAMONT RD LONGITUDINAL & CROSS SECTIONS
No. OF LOTS = 109 P.M. 24974 P.M. 107072
AREA OF SITE = 5.081ha RL 110.614 AHD RL 109.477 AHD
RP DESCRIPTION
PART OF LOT 102 ON SP287641
PARISH OF TEWANTIN
COUNTY OF MARCH
PALM LAKE RESORT
STAGE 3
Project No.: Stage: Milestone: Revision Date.: Drawing No.: Revision:
16-003302 4&5 APPROVAL 30.01.17 4100 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.