Delegated Report - Code - Planning OPW26 0055 (As Published)

of 8

Page text shows just the words. Original shows the document exactly as it was published.

               DEVELOPMENT ASSESSMENT DELEGATED REPORT

               Author                  Senior Development Engineer, Daniel Epps
                                       Development Assessment



                    APPLICATION DETAILS

                    Application No.                OPW26/0055

                    Applicant                      Gregory John Powell

                    Proposal                       Operational Works - Stormwater

                    Properly Made Date             20 April 2026

                    Information Request Date       19 May 2026

                    Information Response Date      3 June 2026

                    Decision Due Date              8 July 2026

                    Report Reviewed &              Will Lowe – 8 July 2026
                    Finalised By


                    PROPERTY DETAILS

                    Property Address               85 Gympie St Tewantin Qld 4565

                    RP Description                 Lot 51 SP 260161

                    Land Area                      487.0000 m²

                    Existing Use of Land           Dwelling House


                    STATUTORY DETAILS

                    SEQRP Designation              Urban Footprint

                    Zone                           Low Density Residential

                    Precinct                       Not applicable

                    Local Plan Area                Tewantin

                    Overlays                       Acid Sulfate Soils

                    Assessment Type                Code

               1.      PROPOSAL
               The application seeks approval for Operational Works - Stormwater.
               The locality and proposal plan are included below.




Document Set ID: 24933421
Version: 2, Version Date: 09/07/2026
Log in to download the original file

Delegated Report - Code - Planning OPW26 0055 (As Published).pdf · 2.0 MB (small file)

Full text of the other 7 pages

Page 2

                                       Figure 1 – Locality




                                       Figure 2 – Site Plan

                                                              Page 2 of 8

Document Set ID: 24933421
Version: 2, Version Date: 09/07/2026

Page 3

               2.     APPLICATION BACKGROUND
               The application seeks to resolve a drainage problem created following the completion of the
               dwelling house in November 2023.
               The dwelling house originally discharged to a field inlet in the rear of the site before discharging
               via a uPVC pipe unlawfully into the adjoining lot. In addressing this, Council issued a Development
               Permit for Operational Works – Stormwater to provide a retrospective inter-allotment drainage
               system allow the dwelling house to discharge directly into existing Council stormwater
               infrastructure to the south. This Operational Works permit was issued on the basis that the
               adjoining lot owner was agreeable to an easement burdening their property. Since issuing this
               Development Permit, the applicant and adjoining landowner were unable to reach an agreement
               regarding this easement.
               This subject application seeks to provide the dwelling house with an alternate drainage solution by
               providing a charged stormwater line allowing the roofwater to discharge to Gympie Street.
               3.     SITE DETAILS
               3.1. Site History
               There is no higher order approval requiring the works.
               Ordinarily, these works would be considered building works and be assessed as part of the building
               certifier’s Building Approval. In this case, a Building Approval has already been issued – albeit
               without a Lawful Point of Discharge and is unable to be amended or reissued, and therefore the
               works are considered Operational Works assessable against The Noosa Plan 2020.
               3.2. Site Description
               The subject site is located below the invert of the kerb in Gympie Street and grades away from the
               road towards the adjoining southern neighbour.
               3.3. Surrounding Land Uses
               Low Density Residential
               4.     ASSESSMENT
               4.1. Instruments for Statutory Assessment
               Under the Planning Act 2016 the application must be assessed against each of the following
               statutory planning instruments to the extent they are relevant to the development:
               •      State Planning Policy;
               •      South East Queensland Regional Plan;
               •      Planning Regulation 2017; and
               •      Noosa Plan 2020 (20 March 2026).
               4.2. Noosa Plan 2020
               The following codes from the Noosa Plan 2020 are applicable to this development:
               •      Works Codes – Water Quality and Drainage Code
               The application has been found to generally comply with all applicable statutory instruments. The
               pertinent issues arising out of the assessment are discussed below.
               The proposal seeks to retrospectively construct a charged stormwater line to discharge roof water
               to the street following a history of non-compliant release of stormwater downstream.
               As part of the submission, a set of RPEQ-signed Engineering Plans and hydraulic calculations
               have been submitted detailing the system and confirming it’s functionality.
               The system relies on a rubble pit to ‘empty’ the charged system between rainfall events. Council
               expressed concerns through a Request for Information relating to how the rubble pit satisfies
               sections 3.6 and 3.10 of the Queensland Urban Drainage Manual (QUDM). The applicant’s

                                                                                                      Page 3 of 8

Document Set ID: 24933421
Version: 2, Version Date: 09/07/2026

Page 4

               response was not satisfactory in addressing these two sections of QUDM and therefore a condition
               is recommended requiring the certifying RPEQ to certify the system complies with these sections.
               Engineering is generally satisfied that the proposal complies with the relevant provisions of The
               Noosa Plan 2020 and recommends the following conditions.
               5.      CONSULTATION
               5.1. Referral Agencies
               Not Applicable
               5.2. Internal Council Referrals
               Not applicable
               6.      CONCLUSION & REASONS FOR DECISION
               The proposed development generally complies with the requirements of the planning scheme and
               does not raise any significant issues that cannot be addressed by reasonable and relevant
               conditions. The application is therefore recommended for approval.
               The report is provided in accordance with Section 63(5) of the Planning Act 2016.
               RECOMMENDATION
               With regard to Application No OPW26/0055 for Operational Works - Stormwater situated at 85
               Gympie St Tewantin Qld 4565 and described as Lot 51 SP 260161, it is recommended the
               application be approved in accordance with the following details for the Decision Notice:
               1.      APPLICATION DETAILS

                   Application No:                  OPW26/0055

                   Street address:                  85 Gympie St Tewantin Qld 4565

                   Real property description:       Lot 51 SP 260161

                   Planning Scheme:                 Noosa Plan 2020 (20 March 2026)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
               •       Development Permit for Approval for Operational Works - Stormwater
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.      ASSESSMENT MANAGER CONDITIONS

               APPROVED PLANS
               1.      Development undertaken in accordance with this approval must generally comply with the
                       approved plans of development. The approved plans are listed in the following table unless
                       otherwise amended by these conditions.

                          Plan No.              Rev.     Plan/Document Name                      Date

                          22-0416-F22           F        Operational Works Stormwater Plan       2 June 2026
                                                         Prepared by Lindsay Consulting

                          22-0416-F25           F        Operational Works Stormwater Details    2 June 2026


                                                                                                      Page 4 of 8

Document Set ID: 24933421
Version: 2, Version Date: 09/07/2026

Page 5

                                                     Prepared by Lindsay Consulting

               CURRENCY PERIOD
               2.     The Currency Period for this development approval lapses if the development has not
                      substantially started by 8 July 2028, unless an application to extend the currency period is
                      approved by Council.
               PRIOR TO COMMENCEMENT OF WORKS
                      Engineering
               3.     All necessary approvals from external service providers (e.g. Unitywater) and external parties
                      on which the development works are proposed have been obtained and a copy supplied to
                      Council.
               4.     A condition report including photographs of the frontage of the site must be completed and
                      submitted to Council prior to any works commencing.
               5.     Certificates demonstrating currency of public liability insurance and works insurance covering
                      the works must be submitted to Council prior to any works commencing in Council’s Road
                      Reserve.
               6.     Any changes to the details associated with the supervising RPEQ or Principal Contractor
                      during construction, must be notified to council in writing within five business days of the
                      change occurring.
               7.     Any conflict between the development and an existing or proposed service must be referred
                      to the relevant service authority for determination prior to commencement of works.
               DURING CONSTRUCTION
                      Engineering
               8.     The developer must meet any costs to repair damage to any Council asset during
                      construction, where damage is a result of the development works. Damage to assets must
                      be repaired immediately where it creates a hazard to the community. In circumstances where
                      the damage does not create a hazard to the community, it must be repaired immediately on
                      completion of the works associated with the development.
               9.     All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
                      who is independent of the Developer and Principal Contractor, and they must certify that all
                      works conform to the Operational Works permit. Where municipal works are involved, such
                      confirmation must be submitted for the respective hold points prior to any site inspection by
                      Council Officers.
               10.    All works must be constructed and work procedure undertaken in accordance with:
                      a.      The approved plans/documents and conditions detailed in this Decision Notice;
                      b.      All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines; and
                      c.      The latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site.
                      Works within Road Reserve/Reinstatement
               11.    Safe pedestrian and vehicle access on all streets in the vicinity of the development must be
                      maintained at all times. Should footpath/road closures be necessary to carry out construction
                      works, Council’s Engineering Officer must be notified prior to the proposed closure and all
                      requirements complied with.
               12.    All frontage works must match neatly with existing road and verge/footpath features.
                      Additional works beyond the frontage may be required to provide an acceptable transition to
                      existing road and verge/footpath profiles.
                                                                                                       Page 5 of 8

Document Set ID: 24933421
Version: 2, Version Date: 09/07/2026

Page 6

               13.    Electrical conduits or other services proposed to be installed within existing and proposed
                      road reserves under existing sealed carriageways, concrete pathways, concrete/sealed
                      driveways or significant vegetation must be installed by boring. Trenching is not permitted,
                      unless specifically approved by Council.
                      Stormwater Drainage
               14.    Appropriate scour protection must be provided at the outlet of all stormwater pipes including
                      temporary outlets.
               15.    Works associated with this permit must not adversely impact on the existing drainage
                      conditions on other properties (e.g. by blocking or interfering with natural overland flows,
                      causing drainage nuisance, etc).
               16.    Construction of all internal stormwater drainage works must comply with the relevant
                      section/s of Australian Standard AS/NZS 3500.3.
                      Erosion and Sediment Control
               17.    Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection
                      Regulation 2019) must not be released from the site or to waters within the site, or be likely
                      to be released should rainfall occur, unless all reasonable and practicable measures are
                      taken to prevent or minimise the release and concentration of contamination.
               18.    Sediment and erosion control measures must be in place prior to works commencing. If such
                      measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such
                      fines can be issued if sediments from the site are found to enter or have the potential to enter
                      Council’s stormwater system, natural waterways, any downstream stormwater filtration
                      system or adversely impacting on other properties. The sediment and erosion control design
                      and measures have NOT been approved, it is the site's Supervising Engineer who is
                      responsible for ensuring that the sediment and erosion control measures have:
                      a.      Been duly designed by an RPEQ or CPESC and constructed in accordance with "best
                              practise" methods;
                      b.      Been revised by an RPEQ or CPESC to address the issues raised by changes in the
                              projected construction schedule and/or methods;
                      c.      Been revised to address predicted rainfall events; and
                      d.      Achieve the desired environmental outcomes.
                      Council may request further controls to be installed should the implemented measures be
                      found inefficient.
               19.    The erosion and sediment control measures must be designed, installed and maintained in
                      accordance with the supervising engineer instructions and the current best practice
                      standards.
                      (*) Refer to Advisory Note
               20.    The developer must ensure non-essential exposure of soil is prevented by restricting the
                      extent of disturbance and minimising the duration of soil exposure to adverse weather
                      conditions and effectively turf, cover or stabilise any disturbed area without delay and prior
                      to rainfall occurring.
               21.    The developer must ensure sediment does not leave the site or enter onto adjoining
                      properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or
                      machinery. It is essential to implement appropriate approved erosion and sediment control
                      measures throughout the site during all phases of construction including vehicle shakedown
                      pad/grid (or similar) at the access to the construction site. Where sediments or other
                      contaminants are deposited on a road, they must be removed so as not to enter Council’s
                      drainage system or waterways.



                                                                                                         Page 6 of 8

Document Set ID: 24933421
Version: 2, Version Date: 09/07/2026

Page 7

               22.    Prior to the completion of the development and commencement of use, all site surfaces must
                      be effectively stabilised using methods which have achieved effective short-term stabilisation
                      and which will continue to achieve effective stabilisation in the medium to long-term.
                      For the purpose of this condition, an effectively stabilised surface is defined as one that does
                      not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion
                      or lead to sedimentation, or lead to water contamination.
                      Damage to Services and Assets
               23.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
               FOLLOWING CONSTRUCTION
                      Certification
               24.    Within three (3) months of the completion of the works, a certificate must be issued by an
                      RPEQ certifying that:
                      a.      the works have been constructed in accordance with the Operational Works permit;
                              and
                      b.      the construction of the captive pipe release drainage pit and rubble pit have been done
                              so in a manner that is lawful and does not constitute a stormwater change (including
                              nuisance) as defined in Sections 3.10 and 3.6 of the Queensland Urban Drainage
                              Manual, respectively.
               5.     REFERENCE DOCUMENTS

               Not applicable.
               6.     REFERRAL AGENCIES

               Not applicable.
               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      General Advisory Notes
               1.     Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
                      the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.
               2.     Council reserves the right to call up any performance bond held or levy charges against the
                      property, should emergency works be required to be undertaken by Council to make the site
                      safe due to inactivity on the development site for extended periods of time.
               3.     Should any changes or modifications to the approved plans be required as a result of
                      construction constraints, a “Request to change an existing approval” under the Planning Act
                      2016 must be made. Amended plans clearly indicating the changes must be lodged with this
                      application along with the appropriate fees.
                      Inspections Request

                                                                                                               Page 7 of 8

Document Set ID: 24933421
Version: 2, Version Date: 09/07/2026

Page 8

               4.     Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5
                      business days’ notice of preferred inspection time.
               5.     If Council officers are required to undertake additional inspections of the same works, a
                      reinspection fee will be applicable in accordance with Council’s Fees and Charges register
                      applicable at the time.
                      Environmental Advisory Notes
               6.     The Environmental Protection Act 1994 states that a person must not carry out any activity
                      that causes, or is likely to cause, environmental harm unless the person takes all reasonable
                      and practicable measures to prevent or minimise the harm. Environmental harm includes
                      environmental nuisance. In this regard persons and entities, involved in the civil, earthworks,
                      construction and landscaping phases of this development are to adhere to their ‘general
                      environmental duty’ to minimise the risk of causing environmental harm.
                      Erosion and Sediment Control
               7.     Accepted best practice standards include International Erosion Control Association
                      Australasia Best Practice Erosion and Sediment Control.
               8.     Qualified Person, for the purpose of erosion and sediment control is a Certified Professional
                      in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional
                      Engineer of Queensland (RPEQ).
               9.     As a general rule, a site is determined to have achieved effective short-term stabilisation if
                      at the time of the plan sealing inspection:
                      a.      Methods of stabilisation are:
                              •    appropriate for slopes and slope lengths; and
                              •    are consistent with best practice environmental management practices such as in
                                   the Manual for Erosion and Sediment Control or the IECA Manual; and
                      b.      Stormwater runoff from the site is not currently, and is not likely to result in visible
                              evidence of sedimentation or erosion, or lead to water contamination.
               8.     PROPERTY NOTES

               Not applicable.
               9.     VARIATION APPROVAL DETAILS

               Not applicable.
               10.    FURTHER DEVELOPMENT PERMITS REQUIRED

               Not applicable.
               11.    SUBMISSIONS

               Not applicable.
               12.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If
               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.
               13.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available online at
               www.noosa.qld.gov.au or at Council Offices.

                                                                                                         Page 8 of 8

Document Set ID: 24933421
Version: 2, Version Date: 09/07/2026

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.