Skip to the record
Every meeting, every word.

Original source · versioned page text

MCU14/0056 Response to SARA - Consulting Report

of 321

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 14, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                            ENG
                                                           Engineering Report & Stormwater Management Plan
                                                  Date:           27/01/2015      Document No.:         14012-ENG-04.Docx

                                                   By:               AvT           Revision No.:               F


        Music Model Parameters
   The split catchment parameters used as the MUSIC Pollutant Export Parameters are shown
   below in Table 5.3, and where derived from Table 3.8 of the MUSIC Modelling Guidelines
   prepared by Water by Design (2010).

    FLOW           SURFACE
                                      TSS log10 VALUES           TSS log10 VALUES            TSS log10 VALUES
    TYPE             TYPE
                   Commercial          Mean       Std. Dev.       Mean         Std. Dev.      Mean          Std. Dev.

                       Roof             N/A         N/A            N/A           N/A             N/A          N/A
  Baseflow
                      Road             0.78         0.39          -0.60          0.50            0.32          0.3
 Parameters
                     Ground            0.78         0.39          -0.60          0.50            0.32          0.3
                       Roof            1.30         0.38          -0.89          0.34            0.37         0.34
 Stormflow
                      Road             2.43         0.38          -0.30          0.34            0.37         0.34
 Parameters
                     Ground            2.16         0.38          -0.39          0.34            0.37         0.34
         Table 5.3:             Source Node MUSIC Pollutant Export Parameters

The parameters used as the MUSIC Rainfall-Runoff Parameters are shown below in Table 5.4, and
where derived from Table 3.7 of the MUSIC Modelling Guidelines prepared by Water by Design
(2010).

                                       PARAMETER                                    COMMERCIAL
                                  Rainfall Threshold (mm)                                    1
                                 Soil Storage Capacity (mm)                                 18
                                 Initial Storage (% Capacity)                               10
                                    Field Capacity (mm)                                     80
                          Infiltration Capacity Coefficient - a                            243
                           Infiltration Capacity Exponent – b                              0.6
                                     Initial Depth (mm)                                     50
                                  Daily Recharge Rate (%)                                    0
                                  Daily Baseflow Rate (%)                                   31
                                Daily Deep Seepage Rate (%)                                  0
         Table 5.4:             MUSIC Rainfall-Runoff Parameters




   A PO Box 26, Carina Q 4152                                                                              13 | P a g e
   E [email protected]
   W www.vtce.com.au
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.