MCU14/0056 Response to SARA - Consulting Report
The original of this document is very large (24.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 18, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn ENG
Engineering Report & Stormwater Management Plan
Date: 27/01/2015 Document No.: 14012-ENG-04.Docx
By: AvT Revision No.: F
d. MUSIC Model Results
Using the MUSIC software the individual treatment trains for each of the four catchment areas
were designed to comply with the water quality objectives (WQO). It was determined that the
water quality objectives for the whole proposed development where met as shown in the
table below:
Pre- Post- Reduction Complying
POLLUTANT TYPES
Development Development (%) With WQO
Total Suspended Solids (kg/yr) 19500 1710 91.2
Total Phosphorus (kg/yr) 37.9 13.0 65.8
Total Nitrogen (kg/yr) 205 112 45.3
Litter/gross pollutants (kg/yr) 1140 0.03 100.0
Table 5.9: Stormwater360 Water Quality Treatment Results
Pre- Post- Reduction Complying
POLLUTANT TYPES
Development Development (%) With WQO
Total Suspended Solids (kg/yr) 19600 3300 83.1
Total Phosphorus (kg/yr) 38.0 15.0 60.4
Total Nitrogen (kg/yr) 204 105 48.5
Litter/gross pollutants (kg/yr) 1140 0 100.0
Table 5.10: Bioretention Water Quality Treatment Results
Pre- Post- Reduction Complying
POLLUTANT TYPES
Development Development (%) With WQO
Total Suspended Solids (kg/yr) 19500 989 94.9
Total Phosphorus (kg/yr) 37.9 10.3 72.8
Total Nitrogen (kg/yr) 205 75.9 62.9
Litter/gross pollutants (kg/yr) 1140 0 100.0
Table 5.11: Total Water Quality Treatment Results
As shown by the above results, the proposed stormwater treatment train adopts best practise
stormwater treatment and will achieve the required Water Quality Objectives even if one of
the two treatment measures should fail.
A PO Box 26, Carina Q 4152 17 | P a g e
E [email protected]
W www.vtce.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.