MCU14/0056 Response to SARA - Consulting Report

of 321

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 24, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                           ENG
                                               Engineering Report & Stormwater Management Plan
                                       Date:          27/01/2015     Document No.:     14012-ENG-04.Docx

                                        By:              AvT          Revision No.:              F


                     h. Flood Zoning

The proposed site is not in a recognised flood zone according to the Noosa Regional Council
River Flood Information Map 10-B50 dated September 2012. See Figure 5.4 below for Flood
map. The map shows that there is no flood zone in close proximity to the proposed site,
therefore flooding issues do not apply to this site.




      Figure 5.4: Noosa Regional Council River Flood Information Map 10-B50 - September 2012

The proposed site is also shown not to flood on the Cooroy & Lake Macdonald Natural Hazard:
Landslide & Flooding Overlay (Map OM3.3).

Refer to the SBSQMP prepared by Storm Water Consulting for a detailed assessment of the
stormwater quantity in the overland flow path in the South East corner of the development.

                     i. SEQWater
As the site is located within the Lake MacDonald Water Supply Catchment, Revision C of this
report was submitted to SEQWater for their review and approval of the stormwater quality
and quantity treatment measures proposed.

SEQWater have confirmed that the proposed stormwater system is acceptable in accordance
with the SEQWater “Development Guidelines” and “State Planning Policy—state interest
guideline Water quality”. The SEQWater comments are provided within their email attached in
Appendix J.




A PO Box 26, Carina Q 4152                                                                23 | P a g e
E [email protected]
W www.vtce.com.au
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.