Corner Myall Street & Ferrells Road Cooroy, QLD 4563
Earthworks Code
Earthworks Code
Specific Outcomes Acceptable Solutions/Probable Solutions Compliance
amenity of the neighbouring land. a) regular water spraying of exposed areas to incorporate erosion and sediment
suppress dust; control measures as shown on the
b) provision of dust stabilised or sealed internal preliminary civil engineering design
roads; drawings.
c) protective covering of exposed areas that are left
for more than 2 weeks; and
d) if there is no valid development permit for the
site, disturbed areas are revegetated using species
identified in PSP3 - Landscaping Plants and
Guidelines;
AND
S4.2 Earthworks are undertaken only during the The proposed development works will
hours of 7am to 6pm, Monday to Friday and 7am to comply with this requirement.
6pm on Saturday. No work is undertaken on Sunday
or public holidays.
Vegetative Waste S5.1 Cleared vegetation is transported off-site for The proposed development works will
O5 Vegetation cleared from a development site is disposal in an approved green waste disposal comply with this requirement.
disposed of in an environmentally responsible facility;
manner. OR
S5.2 Cleared vegetation is mulched on-site and
reused for landscaping of the finished development;
OR
S5.3 Cleared vegetation is disposed of for the
purpose of firewood. (Note: Disposal of vegetative
waste by burning off is not an acceptable method of
disposal).
Managing contamination risk S6.1 The fill material is solid clean earth, free of The proposed development works will
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.