MCU14/0056 Response to SARA - Consulting Report
Plans and drawings: the text below has words only, no drawings.
Very large file (24.7 MB): may take a few minutes to open.
Original PDF page 260, section 1. The text section number identifies this passage in the reader.
Cnr Myall Street & Ferrells Road Coorroy, QLD 4563
Natural Resources Overlay Code
Performance Outcome Criteria and Acceptable Outcomes
Performance outcomes Acceptable outcomes Solution
levels will be modified to ensure that the cut
and fill volumes are balanced therefore
reducing the quantity of material to be
imported or removed from site
The proposed treatment measures will be
designed in accordance with the
International Erosion Control Association
Australasia standards and standard drawings
to ensure that the proposed works minimise
any impact on the downstream water
quality.
A SPEL Puraceptor is proposed within the
refueling area to capture and treat and
stormwater runoff from this area that may
be contaminated with hydrocarbons. The
SPEL Puraceptor is also sized to ensure that
it is capable of capturing the total volume of
a petrol tanker to ensure that no
contaminated runoff will leave the site.
Effluent from the site is to be collected and
pumped to the existing sewer network.
Emergency storage will be provided to
ensure that in the event that the pump
station fails, effluent will not be discharged
from the site.
The proposed development includes the use of
a detention basin to reduce stormwater
quantity runoff to pre-development levels.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.