Original source · versioned page text
MCU14/0056 Response to SARA - Consulting Report
Plans and drawings: the text below has words only, no drawings.
Very large file (24.7 MB): may take a few minutes to open.
Original PDF page 274, section 1. The text section number identifies this passage in the reader.
Corner Myall Street & Ferrells Road Cooroy, QLD 4563
SEQwater Development Guidelines
Development Guidelines for Water Quality Management in Drinking Water Catchments
Table 4 Element 1: On-Site Wastewater Treatment and Effluent Disposal Specific Outcomes and Measures cont.
Specific Outcome Measures Comment
M9.2 Monitoring of the soils, vegetation and The site owner will be responsible for
groundwater in the application area is undertaken maintaining the proposed pump station and
every three years to establish that treated effluent for ensuring that the required monitoring is
is not percolating into groundwater. undertaken.
M9.3 Sampling and testing is in accordance with
relevant regulatory requirements and manuals such
as those provided by the DERM, and testing is
undertaken through an accredited Laboratory.
M9.4 Continuous monitoring is undertaken by the
system owner for any water on the surface of the
application area, down-slope resurfacing, change in
plant growth on or around the application area and
any other signs of problems, and problems
addressed through maintenance.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.