Original source · versioned page text
MCU14/0056 Response to SARA - Consulting Report
Plans and drawings: the text below has words only, no drawings.
Very large file (24.7 MB): may take a few minutes to open.
Original PDF page 277, section 1. The text section number identifies this passage in the reader.
Corner Myall Street & Ferrells Road Cooroy, QLD 4563
SEQwater Development Guidelines
Development Guidelines for Water Quality Management in Drinking Water Catchments
Specific Outcome Measures Comment
succession. A detailed Vegetation
Management and Clearing Plan and
Weed Management and Rehabilitation
Plan will be prepared as part of the
development at operational works. Refer
to the Stormwater Management Plan
and Ecological Assessment Report for
further detail.
Table 5 Element 2: Riparian Land Management Specific Outcomes and Measures cont.
Specific Outcome Measures Comment
S12 Land Use, Development and M12.1 Land uses, development and activities in the The project proposed no further
Activities in Riparian Land riparian width area are limited to: encroachment or clearing of riparian
Land Uses, development and vegetation. No development or associated
a) Approved water supply pumps and bores infrastructure is proposed within the
activities in the width of riparian
(including pump sheds); riparian corridor.
land are limited to essential and
non-intensive uses. b) Controlled grazing in accordance with section Vegetation management including weed
5.7; management and rehabilitation works are
proposed within the riparian corridor to aid
c) Fencing, unstructured play equipment and fixed natural regeneration and enhance existing
outdoor furniture; waterway and biodiversity values. Further, a
10m buffer is proposed from the edge of the
d) A defined pathway or water access point for
existing vegetated corridor and soft
informal recreation which is developed and
treatments including bioretention basins, a
managed in accordance with an approved
storm water detention basin and
Stormwater Quality Control Plan addressing these
landscaping with native species are
Guidelines and with compliance with any DERM
proposed adjacent to the protected
riverine/environmental guidelines.
waterway corridor to minimise edge effects
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.