Original PDF page 29, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                           ENG
                                               Engineering Report & Stormwater Management Plan
                                       Date:          27/01/2015     Document No.:     14012-ENG-04.Docx

                                        By:              AvT          Revision No.:              F


     Property Management Plan
A Property Management Plan is to be prepared and implemented prior to the development
use commencing. The Property Management Plan is to be implemented, maintained and
enforced by the owner of the site.

The Property Management Plan is to include but is not limited to:
 •    Description of land use and acceptable activities
 •    Current infrastructure on site including maintenance requirements
 •    Natural and Cultural resource management
 •    Landscaping and vegetation management
 •    Bush fire management plan
 •    Management of water and waste that may leave the sites

A key issue of the Property Management Plan will be to ensure that stormwater leaving the
site does not impact on the Lake Macdonald Water Supply Catchment and also that waste
from the sewer pump station and land uses does not leave the site. In the event that there is a
spill on site or contaminated water does leave the site, property owner is to immediately
rectify the problem and also inform Unity Water and SEQ Water of the event. By advising both
Unity Water and SEQ Water of the event they will have more time to assess and deal with any
possible impacts on the Lake Macdonald Water Supply.


 9. Electrical and Telecommunication

The electrical supply and communications supply for this proposed development will be by
others.


 10.Acoustic Assessment

The acoustic requirements and design for this proposed development has been conducted by
others.




A PO Box 26, Carina Q 4152                                                                28 | P a g e
E [email protected]
W www.vtce.com.au
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.