Original source · versioned page text
MCU14/0056 Response to SARA - Consulting Report
Plans and drawings: the text below has words only, no drawings.
Very large file (24.7 MB): may take a few minutes to open.
Original PDF page 291, section 1. The text section number identifies this passage in the reader.
Corner Myall Street & Ferrells Road Cooroy, QLD 4563
SEQwater Development Guidelines
Development Guidelines for Water Quality Management in Drinking Water Catchments
Table 8 Element 5: Water Sensitive Design and Stormwater/Runoff Management Specific Outcomes and
Measures cont.
Specific Outcome Measures Comment
M27.3 Site Based Stormwater Management Plans The site owner will be responsible for
for High Risk development provides for annual ensuring that the required monitoring is
monitoring of revegetation areas and other undertaken.
approved devices, measures and systems by
proponents, or, at the owners expense, the local
government, to ensure their effectiveness in
capturing and treating stormwater quality to an
agreed discharge level. Maintenance is outlined in
the Plan with provision to use local resources, and
clear procedures to address poor operations. (Refer
to Section 6 of these Guidelines regarding
Environmental Management and monitoring)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.