Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

MCU14/0056 Response to SARA - Consulting Report

of 321

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (24.7 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 293, section 1. The text section number identifies this passage in the reader.

                    Corner Myall Street & Ferrells Road Cooroy, QLD 4563
                                                   SEQwater Development Guidelines
                           Development Guidelines for Water Quality Management in Drinking Water Catchments

Table 11 Element 8: Excavation and Filling Specific Outcomes and Measures cont.

                 Specific Outcome                                     Measures                                          Comment

                                                 M37.5 Driveways to have a maximum longitudinal
                                                 grade of 15% and the maximum cross fall of 5%.
                                                 Sealing or rock stabilisation of access driveways on
                                                 steep land is needed to minimise potential for
                                                 sediment movement.

                                                 M37.6 Where roads and utilities must cross a
                                                 watercourse, such should occur at 90 degrees with
                                                 bridging favoured over the use of embankments,
                                                 backfill and small culverts. Design and construction
                                                 should be demonstrated in plans as:
                                                 a) Minimising clearing of riparian vegetation;
                                                 b) Minimising areas affected by earthworks and
                                                 other construction activity (e.g. use of pillars);
                                                 c) Minimising substrate disturbance;
                                                 d) Preventing realignment of natural waterways;
                                                 and
                                                 e) Avoiding engineering solutions for scour control.
 S38   Flooding and Ponding                      M38.1 No filling or excavation within any known or     The proposed earthworks will not be located
       Excavation and filling activities shall   local government nominated flood prone area.           within a flood area or impact on the flood
       not contribute to flooding on-site or                                                            storage.
       on nearby lands.                          M38.2 Filling does not affect existing natural
                                                 drainage or detrimentally reduce the storage
                                                 capacity volume in a flood plain
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.