Skip to the record
For the highest quality transcripts.

Original source · versioned page text

MCU14/0056 Response to SARA - Consulting Report

of 321

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (24.7 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 300, section 1. The text section number identifies this passage in the reader.

                              Corner Myall Street & Ferrells Road Cooroy, QLD 4563
                                                              Transport, Roads and Drainage Code


Transport, Roads and Drainage Code
Specific Outcomes                                   Acceptable Solutions/Probable Solutions                        Compliance
                                                    measures to support greater pedestrian and cycle
                                                    movement; AND
                                                    S3.15 Traffic management devices on potential bus routes
                                                    are provided in accordance with the Self-assessable code
                                                    for undertaking road works on local government roads,
                                                    under the Transport Planning and Coordination Regulation
                                                    2005; AND
                                                    S3.16 Streets identified as potential bus routes are—
                                                    a) collector streets and sub-arterial/arterial roads which
                                                    provide highly accessible and relatively direct routes
                                                    wherever practical;
                                                    b) those that provide for the shortest and most direct route
                                                    for an efficient public transport service; and
                                                    c) those that can efficiently service adjoining development
                                                    areas.
                                                    No solution provided.                                          Refer to Traffic Engineering Report
O4 Development access does not compromise                                                                          prepared by others. Typical.
the functions of particular roads as indicated in
the road hierarchy, and does not adversely
impact on the safety, capacity and operations of
the road system.



14.146 Pedestrian and Cycle Path Infrastructure

                                                    S5.1 Consideration is given to existing and future pathway     Refer to Traffic Engineering Report
O5 Pedestrian and cycle path infrastructure is      linkages and pathways link to the Local and Regional Cycle     prepared by others. Typical.
provided –                                          Network and to the Priority Infrastructure Plan in Part 15.
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.