Skip to the record
For the highest quality transcripts.

Original source · versioned page text

MCU14/0056 Response to SARA - Consulting Report

of 321

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (24.7 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 310, section 1. The text section number identifies this passage in the reader.

                               Corner Myall Street & Ferrells Road Cooroy, QLD 4563
                                                           Water Supply & Sewerage Reticulation Code



         Water Supply & Sewerage Reticulation Code

Water Supply & Sewerage Reticulation Code
Specific Outcomes                                      Acceptable Solutions/Probable Solutions                      Compliance
Table 14-62 Water supply
14.164 Design and construction (water)
O1 Water supply infrastructure—                        S1.1 Water supply infrastructure is designed in accordance   The proposed development works will
a) meets the needs of the users;                       with PSP6 – Engineering Design Standards — Water and         comply with this requirement, with
b) is designed to be compatible with existing          Sewerage and As Constructed data submitted in                the proposed internal water supply
infrastructure; and                                    accordance with PSP6 – Engineering Design Standards —        being constructed in accordance with
c) is designed using materials that are suitable for   Water and Sewerage.                                          AS3500.
the use, durable, easy to maintain and cost                                                                         Water reticulation will be designed
effective, taking into account the whole of life                                                                    and constructed in accordance with
cycle cost and Council’s maintenance inventory.                                                                     SEQ D & C Code and PSP6 Engineering
                                                                                                                    Design Standards – Water and
                                                                                                                    Sewerage.
O2 Water supply infrastructure is constructed—         S2.1 Water supply infrastructure is constructed in           The proposed development works will
a) in accordance with appropriate engineering          accordance with PSP6 – Engineering Design Standards —        comply with this requirement.
standards; and                                         Water and Sewerage; AND
b) to minimise adverse environmental impacts.
                                                       S2.2 Erosion and sediment control measures are designed      The proposed development will
                                                       and implemented in accordance with the Institution of        incorporate erosion and sediment
                                                       Engineers Australia (Queensland Division) Soil Erosion and   control measures as shown on the
                                                       Sediment Control - Guidelines for Queensland Construction    preliminary civil engineering design
                                                       Sites.                                                       drawings.
O3 Water supply infrastructure is proven to be         No solution provided.                                        The proposed development works will
suitable for its use prior to Council accepting the                                                                 comply with this requirement, with
dedicated asset.                                                                                                    the proposed internal water supply
                                                                                                                    being constructed in accordance with
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.