Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

MCU14/0056 Response to SARA - Consulting Report

of 321

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (24.7 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 312, section 1. The text section number identifies this passage in the reader.

                               Corner Myall Street & Ferrells Road Cooroy, QLD 4563
                                                          Water Supply & Sewerage Reticulation Code



Water Supply & Sewerage Reticulation Code
Specific Outcomes                                     Acceptable Solutions/Probable Solutions                       Compliance
to Council.                                           expense.
Table 14-63 Sewerage reticulation
14.165 Design and construction (sewer)
O8 Sewerage reticulation infrastructure—              S8.1 Sewerage reticulation infrastructure is designed in      The proposed development works will
a) meets the needs of the users;                      accordance with PSP6 Engineering Design Standards –           comply with this requirement, with
b) is designed to be compatible with existing         Water and Sewerage                                            the proposed internal sewer
infrastructure; and                                                                                                 reticulation being privately owned
c) is designed using materials that are suitable of                                                                 and constructed in accordance with
the use, durable, easy to maintain and cost                                                                         AS3500.
effective, taking into account the whole of life                                                                    Sewer reticulation will be designed
cycle cost and Council’s maintenance inventory.                                                                     and constructed in accordance with
                                                                                                                    SEQ D & C Code and PSP6 Engineering
                                                                                                                    Design Standards – Water and
                                                                                                                    Sewerage.
O9 Sewerage reticulation infrastructure is            S9.1 Sewerage reticulation infrastructure is constructed in   The proposed development works will
constructed—                                          accordance with PSP6 – Engineering Design Standards —         comply with this requirement, with
a) in accordance with appropriate engineering         Water and Sewerage and As Constructed data submitted in       the proposed internal sewer
standards; and                                        accordance with PSP6 – Engineering Design Standards —         reticulation being privately owned
b) to minimise adverse environmental impacts          Water and Sewerage; AND                                       and constructed in accordance with
                                                                                                                    AS3500.
                                                                                                                    Sewer reticulation will be designed
                                                                                                                    and constructed in accordance with
                                                                                                                    SEQ D & C Code and PSP6 Engineering
                                                                                                                    Design Standards – Water and
                                                                                                                    Sewerage.
                                                      S9.2 Erosion and sediment control measures are designed       The proposed development will
                                                      and implemented in accordance with the Institution of         incorporate erosion and sediment
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.