Log in to see the plans as drawn 150 mm layer of 50-75 mm
aggregate to form road surface
Lowering the road surface below the top of bank can
allow the use of fewer pipes while still allowing flood
50-75 mm aggregate
Pipes with sufficient capacity flows to overtop the structure without causing excessive
on road surface
Existing ground to carry channel full flow and bank erosion
Filter fabric
placed on a bed of washed aggregate
Slides slopes no
steeper than 3:1 Rock or
3m (min)
earth fill (b) Typical profile of temporary culvert crossings of wide channels
0.3 m
(min)
Section Plan
(a) Preferred arrangement for temporary culvert crossings
Level spreader
Whoa-boy (cross bank) (preferred drainge option
Low-traffic acc
In situations where it is not practicable to allow overflows to initially passing around only when suitable
the culvert on a stable (well vegetated) stream bank, then the center must be set low discharge conditions exist)
to allow flow to pass over the culvert along the centreline of the channel
150 mm layer of Grassland or
50-75 mm aggregate bushland filter
ess
to form road surface
Culvert
Filter cloth Slides slopes Waterc
Pipe placed on no steeper than 3:1 ourse
a bed of washed
aggregate 3 m (min)
Rock fill 0.3 m
(d) Typical arrangement of surface runoff controls associated with
Catchments & Creeks Pty Ltd
(min)
approach ramps
Section
Drawn: Date:
(c) Alternative layout for the crossing of confined channels GMW Dec-09 Temporary Culvert Crossing TCC-01
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.