Skip to the record
The gold standard in government transparency.

Original source · versioned page text

MCU14/0056 Response to SARA - Consulting Report

of 321

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 58, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                      150 mm layer of 50-75 mm
                                                                                      aggregate to form road surface
                                                                                                                          Lowering the road surface below the top of bank can
                                                                                                                          allow the use of fewer pipes while still allowing flood
                                                                                                                                                                                                  50-75 mm aggregate
                                                                                  Pipes with sufficient capacity          flows to overtop the structure without causing excessive
                                                                                                                                                                                                  on road surface
                                                 Existing ground                  to carry channel full flow and          bank erosion
                               Filter fabric
                                                                                  placed on a bed of washed aggregate



                              Slides slopes no
                              steeper than 3:1                       Rock or
                                                   3m (min)
                                                                     earth fill                                          (b) Typical profile of temporary culvert crossings of wide channels
                              0.3 m
                              (min)


                                                   Section                                          Plan
                                  (a) Preferred arrangement for temporary culvert crossings
                                                                                                                                                                                         Level spreader
                                                                                                                          Whoa-boy (cross bank)                                          (preferred drainge option




                                                                                                                                                           Low-traffic acc
                              In situations where it is not practicable to allow overflows to initially passing around                                                                   only when suitable
                              the culvert on a stable (well vegetated) stream bank, then the center must be set low                                                                      discharge conditions exist)
                              to allow flow to pass over the culvert along the centreline of the channel

                                                                                                 150 mm layer of                                                                                Grassland or
                                                                                                 50-75 mm aggregate                                                                             bushland filter




                                                                                                                                                                           ess
                                                                                                 to form road surface

                                                                                                                                                          Culvert
                                                                         Filter cloth             Slides slopes                                                                  Waterc
                              Pipe placed on                                                      no steeper than 3:1                                                                   ourse
                              a bed of washed
                              aggregate                                   3 m (min)
                                                  Rock fill                                                   0.3 m
                                                                                                                         (d) Typical arrangement of surface runoff controls associated with
Catchments & Creeks Pty Ltd




                                                                                                              (min)
                                                                                                                                                  approach ramps
                                                                            Section
                                                                                                                                   Drawn:      Date:

                                  (c) Alternative layout for the crossing of confined channels                                       GMW        Dec-09 Temporary Culvert Crossing TCC-01
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.